ANALYSIS OF PERFORMANCE OF CONTRACORS OF PMGSY III
| Sl.No | ID | District | Division | Taluk | Package_No | Road_Name | Sanctioned length of Road (Kms) | Actual length of Completion(Kms) | Agency | Date of Commencement | Date of Completion | No of Days taken to complete the work | Progress rate mts/day |
| | 14755 | Dharwad | Dharwad | Hubli | KN 13-22 | MRL03-Belagalli to NH via Bammasamudra | 5.14 | 5.14 | M/s. Pradeep Construction Company | 28-03-2023 | 31-03-2026 | 1099 | 5 |
| | 14754 | Dharwad | Dharwad | Hubli | KN 13-22 | Construction of Box culvert at Ch 1.19 Km in MRL03 Belagalli to NH4 via Bammasamudra | 34.23 | 34.23 | M/s. Pradeep Construction Company | 28-03-2023 | 31-07-2024 | 491 | 70 |
| | 14756 | Dharwad | Dharwad | Hubli | KN 13-22 | Construction of Box Culvert at Ch 0.544 in MRL03-Belagalli to NH via Bammasanudra | 35.68 | 35.68 | M/s. Pradeep Construction Company | 28-03-2023 | 31-07-2024 | 491 | 73 |
| | 14757 | Dharwad | Dharwad | Hubli | KN 13-22 | Construction of Vented Causeway at Ch 2.450 Km on MRL03-Belagalli to NH via Bammasamudra | 27.00 | 27.00 | M/s. Pradeep Construction Company | 28-03-2023 | 02-06-2026 | 1162 | 23 |
| | 13072 | Gulbarga | Kalaburgi | Gulbarga | KN 15-111 | Improvements to road from MRL19-Balbad IK to Gulbarga-Mahagoa NH Road via kagganmadgi Yelwantgi | 8.00 | 8.00 | R G Patel Constructions | 13-07-2021 | 31-10-2022 | 475 | 17 |
| | 13067 | Gulbarga | Kalaburgi | Gulbarga | KN 15-112 | Improvements to road from MRL10-Hagarga tanda to srinivas saradagi in Kalaburagi Taluk | 5.10 | 5.10 | Syed Baba Fakruddin Khaji | 27-05-2021 | 25-07-2022 | 424 | 12 |
| | 13066 | Gulbarga | Kalaburgi | Gulbarga | KN 15-112 | Improvements to road from MRL24- Kalhangarga to Bablad Ik in Kalaburagi Taluk | 7.29 | 7.29 | Syed Baba Fakruddin Khaji | 27-05-2021 | 25-07-2022 | 424 | 17 |
| | 13071 | Gulbarga | Kalaburgi | Jewargi | KN 15-113 | Improvements to road from MRL13-Gudur SA to Ganwar Via Andola | 5.03 | 5.03 | Siddanna Shivappa Desai | 10-06-2021 | 11-01-2024 | 945 | 5 |
| | 13311 | Gulbarga | Kalaburgi | Chincholi | KN 15-114 | Improvements to road from MRL07-SH-125 to Pastapur Via Kodli Allapur | 7.65 | 7.65 | Mastan Ali Pattedar | 21-09-2021 | 28-02-2023 | 525 | 15 |
| | 13312 | Gulbarga | Kalaburgi | Chincholi | KN 15-114 | Improvements to road from MRL01-Anwar to Sulepeth cross Via Anwar Cross Hosalli Cross Ramathirth | 7.83 | 7.83 | Mastan Ali Pattedar | 21-09-2021 | 28-02-2023 | 525 | 15 |
| | 13118 | Gulbarga | Kalaburgi | Chittapur | KN 15-115 | Improvements to Road from MRL-06 Allolli to Dandagunda Upto Taluka Border | 5.00 | 5.00 | M/s KMV Projects Limited | 13-07-2021 | 16-02-2024 | 948 | 5 |
| | 13119 | Gulbarga | Kalaburgi | Chittapur | KN 15-115 | Improvements to Road from MRL-17 Hosur-Allolli MDR to Allur(B) Via Allur(K) | 7.99 | 7.99 | M/s KMV Projects Limited | 13-07-2021 | 16-02-2024 | 948 | 8 |
| | 13116 | Gulbarga | Kalaburgi | Chittapur | KN 15-116 | Improvements to Road from MRL-10 Nalwar to Tarkashpet Via Sugur(N) | 7.26 | 7.26 | M/s KMV Projects Limited | 13-07-2021 | 26-10-2023 | 835 | 9 |
| | 13117 | Gulbarga | Kalaburgi | Chittapur | KN 15-116 | Improvements to Road from MRL-23 Hongunta to Tonasalli(S) | 7.60 | 7.60 | M/s KMV Projects Limited | 13-07-2021 | 26-10-2023 | 835 | 9 |
| | 13114 | Gulbarga | Kalaburgi | Chittapur | KN 15-117 | Improvements to Road from MRL-16 Allolli - Ladlapur Road to Belegera Via Allur(B) in Chittapur Taluq, Kalburgi District | 6.90 | 6.90 | M/s KMV Projects Limited | 13-07-2021 | 20-09-2023 | 799 | 9 |
| | 13115 | Gulbarga | Kalaburgi | Chittapur | KN 15-117 | Improvements to Road from 1) MRL-20 SH to Kardal Via Devapur in Chittapur Taluq, Kalburgi District. | 9.63 | 9.63 | M/s KMV Projects Limited | 13-07-2021 | 20-09-2023 | 799 | 12 |
| | 13070 | Gulbarga | Kalaburgi | Sedam | KN 15-118 | Improvements to road from MRL24-SH 10 To MDR Via Totanhalli | 5.40 | 5.40 | Channanagouda S Patil | 15-06-2021 | 28-08-2022 | 439 | 12 |
| | 14792 | Koppal | Koppala | Gangavathi | KN 20-18 | MRL19-Bankapur to Batteranarasapur Vai sulekal, Aralihalli in Gangavathi Taluka of Koppal District | 2.97 | 2.97 | G Haribabu | 05-09-2023 | 19-11-2024 | 441 | 7 |
| | 14793 | Koppal | Koppala | Gangavathi | KN 20-18 | T06-Adapur to Hiredanakanakal Via Bairapur, Chirchanagudda in Gangavathi taluka of Koppal District | 7.15 | 7.15 | G Haribabu | 05-09-2023 | 31-12-2024 | 483 | 15 |
| | 14794 | Koppal | Koppala | Yelburga | KN 20-19 | MRL41-Mudhol to Tummaraguddi Vai Chikoppa, Chikoppa Tanda in Yelburga taluka of Koppal District | 9.34 | 9.34 | S Prasad | 25-08-2023 | 16-11-2024 | 449 | 21 |
| | 14795 | Koppal | Koppala | Yelburga | KN 20-19 | Construction of Proposed RCC Box culvert (Ch 2.36 km ) MRL41-Mudhol to Tummaraguddi Vai Chikoppa, Chikoppa Tanda in Yelburga taluka of Koppal District | 0.02 | 0.02 | S Prasad | 25-08-2023 | 20-07-2024 | 330 | 0 |
| | 14490 | Shimoga | Shimoga | Thirthahalli | KN 24-34 | Construction of Long Span Bridge @ Ch 3.74 km of T01-Mrugavadhe to Munduvalli MDR | 0.06 | 0.06 | Narayana Shetty | 10-08-2023 | 15-06-2024 | 310 | 0 |
| | 14481 | Shimoga | Shimoga | Hosanagar | KN 24-35 | Construction of Long Span Bridge @ Ch 7.43 km of MRL26- Shiruholli to Heddaripura via Kallur Road in Hosanagara Taluk. | 0.04 | 0.04 | Udayakumar Shetty | 03-07-2023 | 26-07-2024 | 389 | 0 |
| | 14482 | Shimoga | Shimoga | Hosanagar | KN 24-35 | Construction of Long Span Bridge @ Ch 3.45 Km of MRL23- Balehalli SH to SH 77 (Brahmeshwara road) road in Hosanagara Taluk. | 0.04 | 0.04 | Udayakumar Shetty | 03-07-2023 | 30-05-2024 | 332 | 0 |
| | 14483 | Shimoga | Shimoga | Shimoga | KN 24-36 | Construction of Long Span Bridge @ Ch 7.62 km of MRL10-NH-13 near Gajanur to Shimoga-Hai Hole road via Indiranagar, Tattikere and Basavapura road in Shimoga Taluk | 0.02 | 0.02 | M/S SRI VEERABHADRESHWARA SWAMY CONSTRUCTIONS (G AJJAPPA ) | 05-06-2023 | 30-11-2024 | 544 | 0 |
| | 13895 | Uttara Kannada | Karwar | Mundagod | KN 27-112 | MRL23-Ummachagi-Katur Road (MDR) to Kavalagi | 6.35 | 6.35 | Prashant P. Naik, Kumat | 22-05-2021 | 31-12-2024 | 1319 | 5 |
| | 13904 | Uttara Kannada | Karwar | Haliyal | KN 27-113 | MRL11-Gutti to Audit no 3 via Ambikanagar | 4.40 | 4.40 | S. R. Bandiwad & Sons, Haliyal | 25-05-2021 | 15-12-2022 | 569 | 8 |
| | 13902 | Uttara Kannada | Karwar | Haliyal | KN 27-114 | MRL18-Hunsawad to taluk border via Satnalli and Arlawad | 4.94 | 4.94 | S. R. Bandiwad & Sons, Haliyal | 25-05-2021 | 28-12-2022 | 582 | 8 |
| | 13896 | Uttara Kannada | Karwar | Mundagod | KN 27-115 | MRL20-Hittalasara to Kanchi koppa cross | 5.50 | 5.50 | Prashant P. Naik, Kumat | 22-05-2021 | 30-12-2022 | 587 | 9 |
| | 13901 | Uttara Kannada | Karwar | Haliyal | KN 27-116 | MRL17-Mangalawad MDR to SH 28 via Tergaon and Magawad | 6.00 | 6.00 | S. R. Bandiwad & Sons, Haliyal | 25-05-2021 | 28-12-2022 | 582 | 10 |
| | 13903 | Uttara Kannada | Karwar | Haliyal | KN 27-117 | MRL24-Chibbalgeri MDR to Kumbarkoppa via Khmadolli, Siddapur | 5.00 | 5.00 | S. R. Bandiwad & Sons, Haliyal | 25-05-2021 | 28-12-2022 | 582 | 9 |
| | 14014 | Uttara Kannada | Karwar | Haliyal | KN 27-118 | Bantaragali road to Kavalwad via Sankanakoppa Road | 3.25 | 3.25 | K.V.SHETTY, Kumta | 24-05-2022 | 30-09-2024 | 860 | 4 |
| | 14019 | Uttara Kannada | Karwar | Haliyal | KN 27-118A | Construction of Long span bridge - Construction of Bridge at Ch 1.00 km in Bantrgali road to Kavalwada via Sankanakoppa | 0.07 | 0.07 | K.V.SHETTY, Kumta | 24-05-2022 | 10-04-2024 | 687 | 0 |
| | 13518 | Uttara Kannada | Karwar | Sirsi | KN 27-121 | MRL29-Narebail cross (SIrsi-Hubballi SH) to Gangeri via Vakkalakoppa | 4.84 | 4.84 | M/s Jinraj & Co, Kumta | 29-07-2021 | 31-12-2022 | 520 | 9 |
| | 13519 | Uttara Kannada | Karwar | Sirsi | KN 27-122 | MRL01-Chipagi to Sadashivalli Via Somanalli | 3.33 | 3.33 | M/s Jinraj & Co, Kumta | 29-07-2021 | 31-12-2022 | 520 | 6 |
| | 13517 | Uttara Kannada | Karwar | Sirsi | KN 27-123 | MRL28-Vanalli to Dhoranagiri cross via Kardigitti, Dhorangeri, Hegormane, Mundgemane, Kakkalli | 3.67 | 3.67 | M/s Jinraj & Co, Kumta | 29-07-2021 | 31-12-2022 | 520 | 7 |
| | 13515 | Uttara Kannada | Karwar | Sirsi | KN 27-124 | MRL28-Vanalli to Dhoranagiri cross via Kardigitti, Dhorangeri, Hegormane, Mundgemane, Kakkalli(Construction of RCC Box type bridge (4m x 3.5m, 4 vent) at ch 8.500 km of MRL28) | 18.00 | 18.00 | M/s Jinraj & Co, Kumta | 29-07-2021 | 31-12-2022 | 520 | 35 |
| | 13514 | Uttara Kannada | Karwar | Sirsi | KN 27-126 | MRL29-Narebail cross (Sirsi-Hubballi SH) to Gangeri via Vakkalakoppa(Construction of RCC type bridge (4m x 3.5m, 4 vent) at ch 0.400 km of MRL28) | 17.95 | 17.95 | M/s Jinraj & Co, Kumta | 29-07-2021 | 31-12-2022 | 520 | 35 |
| | 13516 | Uttara Kannada | Karwar | Sirsi | KN 27-127 | MRL02-Ganeshnagar to Neeranalli Via Andalli (Construction of Long span Bridge At Ganesh Nagar to Neernalli via Andalli road in sirsi Taluka) | 44.90 | 44.90 | M/s Jinraj & Co, Kumta | 29-07-2021 | 31-12-2022 | 520 | 86 |
| | 13910 | Uttara Kannada | Karwar | Ankola | KN 27-32 | MRL20-NH-63 Sunkasal to Kargdhe via Marathikoppa , Kotepal | 5.47 | 5.47 | Ishwar S Hegde | 24-06-2021 | 30-12-2022 | 554 | 10 |
| | 13913 | Uttara Kannada | Karwar | Bhatkal | KN 27-33 | MRL24-Kiruhole Temple cross Road to Shirajjimanekeri cross Road to Joining Gorte Road to Ajjanamanekeri Road Via Gorte , Siddanamanekeri | 4.08 | 4.08 | Shri. I.S.HEGDE, HONNAVARA | 24-06-2021 | 30-06-2022 | 371 | 11 |
| | 13908 | Uttara Kannada | Karwar | Bhatkal | KN 27-33 | MRL23-Murudeshwar Harikantrakeri to NH-66 Neeragadde Crossing NH-66 Yedabadru Muragoli Kalika Temple Via Tudalli Village
Construction of LSB ( 10.00 X 5.00 X 5 Vents ) at 2.52 km | 0.05 | 0.05 | Ishwar S Hegde | 24-06-2021 | 30-06-2022 | 371 | 0 |
| | 13918 | Uttara Kannada | Karwar | Karwar | KN 27-34 | MRL16-SH-34 to Kuddegalli Via Baragadde
Construction of New RCC Bridge (10.00 m X 4.00 m X 2 vents )7.50m width at Ch 4.20 km | 0.02 | 0.02 | RAMSHREE GLOBAL CONSTRUCTIONS PRIVATE LIMITED KARWAR | 24-05-2021 | 03-11-2022 | 528 | 0 |
| | 13916 | Uttara Kannada | Karwar | Karwar | KN 27-34 | MRL16-SH-34 to Kuddegalli Via Baragadde | 7.72 | 7.72 | RAMSHREE GLOBAL CONSTRUCTIONS PRIVATE LIMITED KARWAR | 24-05-2021 | 06-12-2025 | 1657 | 5 |
| | 13915 | Uttara Kannada | Karwar | Karwar | KN 27-34 | MRL17-Kolge to Sonarwada via Kanasgiri, Devalwada MDR, Puditinbag, Gindiwada, Phalewada | 4.89 | 4.89 | RAMSHREE GLOBAL CONSTRUCTIONS PRIVATE LIMITED KARWAR | 24-05-2021 | 23-05-2024 | 1095 | 4 |
| | 13917 | Uttara Kannada | Karwar | Karwar | KN 27-34 | MRL16-SH-34 to Kuddegalli Via Baragadde
Construction of New RCC Bridge (10.00 m X 4.50 m X 6 vents) 7.50 m width at 3.51 km | 0.06 | 0.06 | RAMSHREE GLOBAL CONSTRUCTIONS PRIVATE LIMITED KARWAR | 24-05-2021 | 23-04-2022 | 334 | 0 |
| | 13914 | Uttara Kannada | Karwar | Karwar | KN 27-34 | MRL09-Hunasemakki to Machalli Via Acchakanne | 4.38 | 4.38 | RAMSHREE GLOBAL CONSTRUCTIONS PRIVATE LIMITED KARWAR | 24-05-2021 | 23-05-2024 | 1095 | 4 |
| | 13921 | Uttara Kannada | Karwar | Kumta | KN 27-35 | MRL17-Kolageri to Algar Via Hegde hosalli,Kannimath,Alagar,Abbolli | 4.63 | 4.63 | SHRI. GANESH D NAIK KUMTA | 24-06-2021 | 20-02-2023 | 606 | 8 |
| | 13922 | Uttara Kannada | Karwar | Kumta | KN 27-35 | MRL02-SH 48 to Marakal Cross via Hottinshirur,Vaddigadde,Hindagone,Hankal,Guddekeri,Kandavalli,Ajjigadde,Marakal | 4.56 | 4.56 | SHRI. GANESH D NAIK KUMTA | 24-06-2021 | 20-02-2023 | 606 | 8 |
| | 13923 | Uttara Kannada | Karwar | Kumta | KN 27-35 | MRL03-Sandalli muttolli to VR17 via Kattinabena | 5.65 | 5.65 | SHRI. GANESH D NAIK KUMTA | 24-06-2021 | 20-02-2023 | 606 | 9 |
| | 13909 | Uttara Kannada | Karwar | Kumta | KN 27-35 | MRL02-SH 48 to Marakal Cross via Hottinshirur,Vaddigadde,Hindagone,Hankal,Guddekeri,Kandavalli,Ajjigadde,Marakal
(Construction of New RCC Bridge (10.00 M X 3.00 M X 2 vents) 7.50 m width at ch 3.36 Km) | 0.02 | 0.02 | GANESH D NAIK | 24-06-2021 | 26-12-2022 | 550 | 0 |
| | 13919 | Uttara Kannada | Karwar | Honnavara | KN 27-36 | MRL06-SH to Kavalakki via Hadimane,Melinkeri, Kanakki,Meganmane,SH Crossing Kerekon,Kontpal, Keremane kachrike, Kasanbena,Halemane | 9.54 | 9.54 | SUDHEER GANAPATI PANDIT KUMTA | 24-05-2021 | 26-12-2022 | 581 | 16 |
| | 13907 | Uttara Kannada | Karwar | Honnavara | KN 27-36 | MRL32-MDR Basti to Hesige via neeragai , jinbail , Bettanakeri , Kulgaar , Heggar
Construction of LSB ( 10.00 X 4.50 X 2 Vents ) at ch 7.44 Km | 0.02 | 0.02 | SUDHEER GANAPATI PANDIT | 24-05-2021 | 28-04-2023 | 704 | 0 |
| | 13906 | Uttara Kannada | Karwar | Honnavara | KN 27-36 | MRL32-MDR Basti to Hesige via neeragai , jinbail , Bettanakeri , Kulgaar , Heggar
Construction of LSB ( 10.00 X 3.00 X 2 Vents ) at ch 0.96 Km | 0.02 | 0.02 | SUDHEER GANAPATI PANDIT | 24-05-2021 | 26-12-2022 | 581 | 0 |
| | 13898 | Uttara Kannada | Karwar | Yellapura | KN 27-85 | MRL16-Halasikoppa to MDR (Bharatanhalli) | 6.40 | 6.40 | N.R. Nayak & Co. Kumat | 01-07-2021 | 28-03-2023 | 635 | 10 |
| | 13894 | Uttara Kannada | Karwar | Haliyal | KN 27-86 | MRL22 SH-93 to Arlwad Via Dusagi and Janata plot | 6.75 | 6.75 | Mohan P. Naik, kumta | 20-05-2021 | 28-07-2022 | 434 | 16 |
| | 13897 | Uttara Kannada | Karwar | Yellapura | KN 27-87 | MRL05-Linganakoppa-Anejeddi (SH6) to Kolikeri (NH63) | 9.60 | 9.60 | N.R. Nayak & Co. Kumat | 01-07-2021 | 28-03-2023 | 635 | 15 |
| | 13905 | Uttara Kannada | Karwar | Honnavara | KN 27-97 | MRL23-Bajjigeri to Asikeri Via Bajekeri | 7.42 | 7.42 | SUDHEER GANAPATI PANDIT | 24-05-2021 | 20-02-2023 | 637 | 12 |
| | 13122 | Yadgir | Kalaburgi | Shorapur | KN 29-07 | Improvements to road from TO1-Konal to hunsihole via handral nagral in Shorapur taluk | 10.10 | 10.10 | Sri Ramangouda Patil | 04-06-2021 | 01-10-2022 | 484 | 21 |
| | 13123 | Yadgir | Kalaburgi | Shorapur | KN 29-07 | Improvements to road from MRL-22 Maralbavi cross to budihal Shorapur taluk | 7.97 | 7.97 | Sri Ramangouda Patil | 04-06-2021 | 01-10-2022 | 484 | 16 |
| | 13073 | Yadgir | Kalaburgi | Shahpur | KN 29-09 | Improvements of road from MRL17 Chennur (K) to Wadagera cross via Gondenoor in Shahapur Taluk | 7.86 | 7.86 | Sri MAHADEVAPPA YELSATTI (M/s M Y Constructions) | 21-06-2021 | 19-05-2022 | 332 | 24 |
| | 13074 | Yadgir | Kalaburgi | Shahpur | KN 29-09 | Improvements of road from MRL21-Joladadigi to Gonal via Kodal in Shahapur Taluk | 4.10 | 4.10 | Sri MAHADEVAPPA YELSATTI (M/s M Y Constructions) | 21-06-2021 | 19-05-2022 | 332 | 12 |
| | 13064 | Yadgir | Kalaburgi | Shahpur | KN 29-11 | Improvements of road from MRL15-Kakkasagere to Rajapura in Shahapur Taluka | 5.50 | 5.50 | AMARESHGOUDA B PATIL | 07-07-2021 | 29-11-2021 | 145 | 38 |
| | 13286 | Yadgir | Kalaburgi | Yadgiri | KN 29-12 | Improvements to road from MRL16-SH-127 to Rampur S Via Saidapur | 4.40 | 4.40 | Sri Channanagouda S Patil | 15-06-2021 | 20-08-2023 | 796 | 6 |
| | 13075 | Yadgir | Kalaburgi | Yadgiri | KN 29-13 | Improvements road from Yaddalli to Katagishahapur Via Hongera from km 0.00 to 4.30 km in Yadgiri Taluk | 4.30 | 4.30 | Sri Chidanadappa | 07-07-2021 | 26-10-2023 | 841 | 5 |
| | 13065 | Yadgir | Kalaburgi | Yadgiri | KN 29-14 | MRL23-Road from MDR near Balched to Mdr Near Baddepalli Via Sambar | 9.99 | 9.99 | BASAPPA M KOTYAL( B M KOTYAL | 13-07-2021 | 21-03-2024 | 982 | 10 |
| | 13359 | Bagalkot | Bagalkot | Badami | KN-01-01 | Construction of Long span bridge - Construction of Box Type Bridge at Ch 10.12 in MRL15-Gubberakoppa to Join Guledagud via Hirebudihal to 19.4 | 19.40 | 19.40 | M/s RAJANANDA CONSTRUCTIONS COMPANY | 11-05-2022 | 15-01-2024 | 614 | 32 |
| | 13358 | Bagalkot | Bagalkot | Badami | KN-01-01 | Construction of Long span bridge - Construction of Box Type Bridge at Ch 5.14 in MRL15-Gubberakoppa to Join Guledagud via Hirebudihal to 17.15 | 17.15 | 17.15 | M/s RAJANANDA CONSTRUCTIONS COMPANY | 11-05-2022 | 02-01-2024 | 601 | 29 |
| | 13357 | Bagalkot | Bagalkot | Badami | KN-01-01 | Construction of Long span bridge - Construction of Box Type Bridge at Ch 1.048 in MRL15-Gubberakoppa to Join Guledagudda via HIrebudiha to 17.15 | 17.15 | 17.15 | M/s RAJANANDA CONSTRUCTIONS COMPANY | 11-05-2022 | 25-01-2024 | 624 | 27 |
| | 13360 | Bagalkot | Bagalkot | Badami | KN-01-01 | Construction of Long span bridge - Construction of Box Culvert at Ch 13.98 in MRL15-Gubberakoppa to Join Guledagud via Hirebudihal to 32.75 | 32.75 | 32.75 | M/s RAJANANDA CONSTRUCTIONS COMPANY | 11-05-2022 | 22-03-2024 | 681 | 48 |
| | 13356 | Bagalkot | Bagalkot | Badami | KN-01-01 | Improvements to Road - MRL15-Gubberakoppa to Join Guledagudda via HIrebudihal, Teggi, Tougunshi, Muradi to 14.77 | 14.77 | 14.77 | M/s RAJANANDA CONSTRUCTIONS COMPANY | 11-05-2022 | 24-12-2025 | 1323 | 11 |
| | 13005 | Bagalkot | Bagalkot | Badami | KN-01-02 | Improvements to Road - MRL49-Kabbalageri to NH-369 via Adagal to 4.12 | 4.12 | 4.12 | Govindaraj H Ammapur | 16-07-2021 | 26-12-2023 | 893 | 5 |
| | 13003 | Bagalkot | Bagalkot | Badami | KN-01-02 | Improvements to Road - MRL53-Neelagund to Mustigeri to 4.27 | 4.27 | 4.27 | Govindaraj H Ammapur | 16-07-2021 | 26-12-2023 | 893 | 5 |
| | 13004 | Bagalkot | Bagalkot | Badami | KN-01-03 | Improvements to Road - MRL41-Timsagar Kelawadi road to Join Lingapur Neelanagar Road to 4.16 | 4.16 | 4.16 | Shrinath S Bairugol | 01-09-2021 | 25-02-2024 | 907 | 5 |
| | 13026 | Bagalkot | Bagalkot | Badami | KN-01-03 | Construction of Long span bridge - Construction of Box Type Bridge at Ch 2.54 in MR41-Timsagar Kelawadi road to Join Lingapur Neelanaga to 21.68 | 21.68 | 21.68 | Shrinath S Bairugol | 01-09-2021 | 25-02-2024 | 907 | 24 |
| | 13007 | Bagalkot | Bagalkot | Bagalkot | KN-01-04 | Improvements to Road - MRL02-Muranal to Join NH-367 via Veerapur to 3.86 | 3.86 | 3.86 | VEERABHADRA S WALI | 10-07-2021 | 21-09-2024 | 1169 | 3 |
| | 13006 | Bagalkot | Bagalkot | Bagalkot | KN-01-04 | Improvements to Road - MRL52-Tulasigeri to Simekeri to 5.75 | 5.75 | 5.75 | VEERABHADRA S WALI | 10-07-2021 | 30-01-2025 | 1300 | 4 |
| | 13008 | Bagalkot | Bagalkot | Bagalkot | KN-01-05 | Improvements to Road - MRL14-Maharudrappa Totad Vasti to Benakatti via Honnakatti to 3.37 | 3.37 | 3.37 | SHARANAGOUDA S HANDARAGAL | 20-05-2021 | 03-08-2022 | 440 | 8 |
| | 13028 | Bagalkot | Bagalkot | Hungund | KN-01-06 | Construction of Long span bridge - Construction of Box Culvert at Ch 8.94 in MRL15-Kamadatta to Rakkasagi via Iddalagi, Thimmapur to 21.43 | 21.43 | 21.43 | Motilal Lalu Chavan | 10-07-2021 | 29-02-2024 | 964 | 22 |
| | 13013 | Bagalkot | Bagalkot | Hungund | KN-01-06 | Improvements to Road - MRL15-Kamadatta to Rakkasagi via Iddalagi, Thimmapur to 16.33 | 16.33 | 16.33 | Motilal Lalu Chavan | 10-07-2021 | 29-02-2024 | 964 | 17 |
| | 13029 | Bagalkot | Bagalkot | Hungund | KN-01-06 | Construction of Long span bridge - Construction of Box Culvert at Ch 12.18 in MRL15-Kamadatta to Rakkasagi via Iddalagi, Thimmapur to 21.65 | 21.65 | 21.65 | Motilal Lalu Chavan | 10-07-2021 | 29-02-2024 | 964 | 22 |
| | 13012 | Bagalkot | Bagalkot | Hungund | KN-01-07 | Improvements to Road - MRL17-Amaravati to SH 20 (mudagal road ) Road to 3.74 | 3.74 | 3.74 | SIDDANNA SHIVAPPA DESAI | 05-06-2021 | 31-12-2023 | 939 | 4 |
| | 13011 | Bagalkot | Bagalkot | Hungund | KN-01-07 | Improvements to Road - MRL22-Amarawati to MDR to 5.7 | 5.70 | 5.70 | SIDDANNA SHIVAPPA DESAI | 05-06-2021 | 27-12-2023 | 935 | 6 |
| | 13014 | Bagalkot | Bagalkot | Hungund | KN-01-08 | Improvements to Road - MRL16-Kandagal to Join SH (Raichur Bachi road) to 7.1 | 7.10 | 7.10 | MANOJ R DESHPANDE | 15-05-2021 | 02-04-2022 | 322 | 22 |
| | 13027 | Bagalkot | Bagalkot | Hungund | KN-01-08 | Construction of Long span bridge - Construction of Box Type Bridge at Ch 3.07 in MRL16-Kandagal to Join SH (Raichur Bachi road) to 24.15 | 24.15 | 24.15 | MANOJ R DESHPANDE | 15-05-2021 | 02-04-2022 | 322 | 75 |
| | 13010 | Bagalkot | Bagalkot | Bilgi | KN-01-09 | Improvements to Road - MRL15-Siddapur to Ballur Vasti and joining Budanamaddi vasti and Teggi to ballur vasti road to 5.12 | 5.12 | 5.12 | M/s B M Kotyal | 10-05-2021 | 27-07-2022 | 443 | 12 |
| | 13009 | Bagalkot | Bagalkot | Bilgi | KN-01-09 | Improvements to Road - MRL19-Chikkalagundi to Arakeri to 7.47 | 7.47 | 7.47 | M/s B M Kotyal | 10-05-2021 | 26-07-2022 | 442 | 17 |
| | 13015 | Bagalkot | Bagalkot | Jamakhandi | KN-01-10 | Improvements to Road - MRL38-Khajibilagi-Gadyal to 6.25 | 6.25 | 6.25 | CHINAPPA KALLAPPA ONTAGUDI | 05-07-2021 | 31-08-2023 | 787 | 8 |
| | 13019 | Bagalkot | Bagalkot | Jamakhandi | KN-01-10 | Improvements to Road - MRL64-Hunashikatti to Galagali Road via Konnur to 5.03 | 5.03 | 5.03 | CHINAPPA KALLAPPA ONTAGUDI | 05-07-2021 | 25-08-2022 | 416 | 12 |
| | 13018 | Bagalkot | Bagalkot | Jamakhandi | KN-01-11 | Improvements to Road - MRL43-Tubachi to Savalagi Tungal Road to 9.23 | 9.23 | 9.23 | M/s.B.S.Biradar | 09-08-2021 | 25-08-2022 | 381 | 24 |
| | 13017 | Bagalkot | Bagalkot | Jamakhandi | KN-01-12 | Improvements to Road - MRL29-kulahalli to Jamakhandi Kudachi SH via Bavimaddi to 5.34 | 5.34 | 5.34 | B A Nandeppanavar | 10-09-2021 | 25-08-2022 | 349 | 15 |
| | 13030 | Bagalkot | Bagalkot | Jamakhandi | KN-01-12 | Construction of Long span bridge - Construction of Box Culvert at 2.10 KM MRL 29 Kulahalli to Jamakhandi-Kudachi SH via Bavimaddi to 21.43 | 21.43 | 21.43 | B A Nandeppanavar | 10-09-2021 | 25-08-2022 | 349 | 61 |
| | 13016 | Bagalkot | Bagalkot | Jamakhandi | KN-01-12 | Improvements to Road - MRL78-Kagawad-Kaladagi SH to Shegunashi upto tq border via Halingali to 4.11 | 4.11 | 4.11 | B A Nandeppanavar | 10-09-2021 | 25-08-2022 | 349 | 12 |
| | 13021 | Bagalkot | Bagalkot | Mudhol | KN-01-13 | Improvements to Road - MRL17-Dhavaleshwar to Marapur and upto TQ border to 3.18 | 3.18 | 3.18 | BASAVARAJGOUDA GANEKAL | 01-09-2021 | 30-09-2023 | 759 | 4 |
| | 13022 | Bagalkot | Bagalkot | Mudhol | KN-01-13 | Improvements to Road - MRL13-Dhavaleshwar - Belagali (upto Mahalingapur-Nandagaon MDR and SH App Road) to 4.63 | 4.63 | 4.63 | BASAVARAJGOUDA GANEKAL | 01-09-2021 | 30-09-2023 | 759 | 6 |
| | 13025 | Bagalkot | Bagalkot | Mudhol | KN-01-14 | Improvements to Road - MRL19-Jeeragal to Ingalagi and connecting Mudhol-Anagavadi road to 5.88 | 5.88 | 5.88 | CHANDRASHEKAR APPASAHEB BIRADAR | 09-09-2021 | 30-04-2023 | 598 | 10 |
| | 13024 | Bagalkot | Bagalkot | Mudhol | KN-01-14 | Improvements to Road - MRL22-Halagali Chikkalagundi to 4.11 | 4.11 | 4.11 | CHANDRASHEKAR APPASAHEB BIRADAR | 09-09-2021 | 30-04-2023 | 598 | 7 |
| | 13023 | Bagalkot | Bagalkot | Mudhol | KN-01-15 | Improvements to Road - MRL06-SH 34 to SH 18 via Shirol and Soraganv to 5.45 | 5.45 | 5.45 | Basavaraja Gouda Ganekal | 01-09-2021 | 30-09-2023 | 759 | 7 |
| | 13031 | Bagalkot | Bagalkot | Mudhol | KN-01-15 | Construction of Long span bridge - Construction of Box Culvert at CH 1.68 Km MRL06-SH 34 to SH 18 via Shirol and Soraganv to 35.7 | 35.70 | 35.70 | Basavaraja Gouda Ganekal | 01-09-2021 | 30-09-2023 | 759 | 47 |
| | 13020 | Bagalkot | Bagalkot | Mudhol | KN-01-15 | Improvements to Road - MRL21-Mudhol Nippani (near belagali) to join Mudhol-Navalagi MDR via Mughalkhod to 8.06 | 8.06 | 8.06 | Basavaraja Gouda Ganekal | 01-09-2021 | 30-09-2023 | 759 | 11 |
| | 14753 | Bagalkot | Bagalkot | Badami | KN-01-17 | Improvements and Asphalting of Road from MRL 08 Gubberkoppa to Agasanakoppa road via Maninagar Yankanchi | 5.83 | 5.83 | Santosh Rokhade | 28-03-2023 | 12-02-2024 | 321 | 18 |
| | 14480 | Bagalkot | Bagalkot | Bagalkot | KN-01-18 | construction of box culvert @ ch 8.816 at khajjidoni to join MDR via kalasakoppa,chikkashellikeri | 0.06 | 0.06 | Veerbhadreshwar construction | 28-03-2023 | 26-02-2024 | 335 | 0 |
| | 14772 | Bagalkot | Bagalkot | Bagalkot | KN-01-18 | Improvement and Asphalting of roa from T01-Chikkashellikeri to join jalageri MDR via Hireshelliker | 4.40 | 4.40 | Veerbhadreshwar construction | 28-03-2023 | 25-12-2025 | 1003 | 4 |
| | 14799 | Bagalkot | Bagalkot | Hungund | KN-01-19 | Improvements to Road from MRL 61- SH-6 to Balakundi Tanda Via Hireupanal Sankalapur | 4.00 | 4.00 | Santosh Rokhade | 12-07-2023 | 12-06-2024 | 336 | 12 |
| | 14767 | Bagalkot | Bagalkot | Hungund | KN-01-20 | Improvement and Asphalting of Road from MRL-60 Mullur to Ameenagad(SH) | 9.96 | 9.96 | S.V.Nimbalagundi | 10-08-2023 | 15-10-2024 | 432 | 23 |
| | 14743 | Bagalkot | Bagalkot | Bilgi | KN-01-21 | Improvements to Road - MRL24-Koppa SK to Halagali to 4.14 | 4.14 | 4.14 | Basavaraj. B. Kongali | 27-03-2023 | 16-05-2024 | 416 | 10 |
| | 14487 | Bagalkot | Bagalkot | Jamakhandi | KN-01-22 | Improvements to Road - MRL10-Kallalli Siddapur | 7.86 | 7.86 | B. A. Nandeappannavar | 28-03-2023 | 31-07-2024 | 491 | 16 |
| | 14488 | Bagalkot | Bagalkot | Jamakhandi | KN-01-22 | Construction of Long span bridge - Construction of Box Culvert at Ch 3.50 km in MRL 41 Alagur to Jakanur Via Kunchanur | 17.15 | 17.15 | B. A. Nandeappannavar | 28-03-2023 | 16-05-2024 | 415 | 41 |
| | 14486 | Bagalkot | Bagalkot | Jamakhandi | KN-01-22 | Improvements to Road - MRL25-Jagadal to join Chimmad-Kallali road via Seemikallavva temple | 5.45 | 5.45 | B. A. Nandeappannavar | 28-03-2023 | 30-11-2024 | 613 | 9 |
| | 14813 | Bagalkot | Bagalkot | Badami | KN-01-74 | Improvements and Asphalting of Road From MRL-57 Halkurki to Hansanur via Bedarbhdihal | 7.37 | 7.37 | Shivaleela Suresh. Sajjan | 19-08-2023 | 28-07-2025 | 709 | 10 |
| | 14814 | Bagalkot | Bagalkot | Badami | KN-01-75 | MRL-16 SH-44(Budanagad)to Allur SP via Alur SP RC | 3.00 | 3.00 | Shivaleela Suresh. Sajjan | 19-08-2023 | 28-07-2025 | 709 | 4 |
| | 12469 | Bangalore Rural | Bengaluru | Devanahalli | KN-02-05 | Improvements to Road - MRL07-MDR (Budigere road) to Tellahally agrahara road via Boodihal, Channahally,Chikka Hosahally to 6.55 | 6.55 | 6.55 | | 25-06-2020 | 24-05-2021 | 333 | 20 |
| | 12471 | Bangalore Rural | Bengaluru | Devanahalli | KN-02-05 | Improvements to Road - MRL09-SH 104 to Taluk Border via, Kondenahally, Kaggalahally, Jonnahally, Devanayakanahally to 3.84 | 3.84 | 3.84 | | 25-06-2020 | 24-05-2021 | 333 | 12 |
| | 12470 | Bangalore Rural | Bengaluru | Devanahalli | KN-02-06 | Improvements to Road - MRL21-NH-207 to Taluk Border via, konaginabele, Doddakurubarahally, Varadenahally, Naganayakanahally, to 11.38 | 11.38 | 11.38 | | 29-06-2020 | 30-04-2021 | 305 | 37 |
| | 12472 | Bangalore Rural | Bengaluru | Doddaballapur | KN-02-07 | Improvements to Road - MRL06-Kondasandra to MDR 22 via Thubagere, Nellugudige, Geddalapalya, Palpaldinne to 4.4 | 4.40 | 4.40 | | 09-07-2020 | 30-11-2021 | 509 | 9 |
| | 12474 | Bangalore Rural | Bengaluru | Doddaballapur | KN-02-07 | Improvements to Road - MRL11-NH207 to Koluru via Thalagavara, Honnagatta to 5.03 | 5.03 | 5.03 | | 09-07-2020 | 30-11-2021 | 509 | 10 |
| | 12473 | Bangalore Rural | Bengaluru | Doddaballapur | KN-02-08 | Improvements to Road - T02-MDR 7 to MDR 4( KK Road) via Nellikuntepalya, Nelkunte, Tanda Nagashettihalli, Cheelanahalli,Tippur, Madeswara, Bomanahalli, Kadabyadarahalli to 13.7 | 13.70 | 13.70 | | 01-07-2020 | 30-05-2021 | 333 | 41 |
| | 12476 | Bangalore Rural | Bengaluru | Hosakote | KN-02-09 | Improvements to Road - MRL23-Kembliganahally to Bavapura via C.T. Gollahally, Malliyappanahally, K- Sathyavara, Channigalapura to 6.74 | 6.74 | 6.74 | | 29-06-2020 | 30-04-2021 | 305 | 22 |
| | 12475 | Bangalore Rural | Bengaluru | Hosakote | KN-02-09 | Improvements to Road - MRL24-Banamakanahally MDR to Gundrahally via Agasarahally, Marasandrahally, Sathiganahally, Hedakanahally to 5.96 | 5.96 | 5.96 | | 29-06-2020 | 30-04-2021 | 305 | 20 |
| | 12463 | Bangalore Rural | Bengaluru | Hosakote | KN-02-10 | Improvements to Road - MRL05-Doddakoliga MDR TO Doddanallurahally MDR VIA, Chikkanallurahally, Beguru , Beemakanahally, Bagalur to 6.16 | 6.16 | 6.16 | | 27-07-2020 | 01-06-2021 | 309 | 20 |
| | 12462 | Bangalore Rural | Bengaluru | Hosakote | KN-02-10 | Improvements to Road - T02-Upparahalli TO Doddakoliga VIA, Muthakadally, Beguru, Kamblipura, Kurubarahally, Sonnadenahally to 10.4 | 10.40 | 10.40 | | 27-07-2020 | 01-06-2021 | 309 | 34 |
| | 12466 | Bangalore Rural | Bengaluru | Nelamangala | KN-02-11 | Improvements to Road - MRL16-Dasenahalli Colony to Pandupura via Thatte kere, Karimanne, Imechanahally, Imechanahally colony, Devarahatti, Laxmipura to 6.21 | 6.21 | 6.21 | | 26-06-2020 | 25-05-2021 | 333 | 19 |
| | 12467 | Bangalore Rural | Bengaluru | Nelamangala | KN-02-11 | Improvements to Road - MRL22-Thyamagondlu MDR to Arebommanahalli VR Rd Jn via Thottanahalli, Hanumanthapura, Indiranagara, Mahimapura, Gangagowdana palya, Kempapura Agrahara to 3.74 | 3.74 | 3.74 | | 26-06-2020 | 25-05-2021 | 333 | 11 |
| | 12468 | Bangalore Rural | Bengaluru | Nelamangala | KN-02-12 | Improvements to Road - MRL15-Hanumanthegowdanapalya MDR to Taluk Border via Srinivasapura, Srinivasapura Colony, Hanchipura, Kakkepalya, Kodappanahalli to 6.49 | 6.49 | 6.49 | | 26-06-2020 | 25-05-2021 | 333 | 19 |
| | 12464 | Bangalore Rural | Bengaluru | Nelamangala | KN-02-12 | Improvements to Road - MRL04-NH-4 to Honnarayanahalli via T. Begur, Araledibba, Anandhnagar, Thirumalapura, Koneripura, Kempohalli, Madalakote to 3.74 | 3.74 | 3.74 | | 26-06-2020 | 25-05-2021 | 333 | 11 |
| | 12465 | Bangalore Rural | Bengaluru | Nelamangala | KN-02-12 | Improvements to Road - MRL02-NH-48 to Taluk Border via Gandhigrama, Honnasandra, Lambani thanda, Manchenahalli, Thimmegowdana palya, Bolamaranahalli to 3.6 | 3.60 | 3.60 | | 26-06-2020 | 25-05-2021 | 333 | 11 |
| | 12977 | Bangalore Rural | Bangalore Rural | Devanahalli | KN-02-13 | MRL17 NH-207 TO yELAHANKA Vijayapura Road (MDR-4) Via., Haralur, Polanahalli, Mattabaralu | 7.31 | 7.31 | Sri.B.N.Devaraju, Class-1 contractor, Bendiganahalli Village, Sulibele Hobli, Hoskote Taluk, Bangalore Rural | 19-05-2021 | 04-03-2022 | 289 | 25 |
| | 12339 | Bangalore Urban | Bengaluru | Anekal | KN-03-05 | Improvements to Road - MRL04-NH 07 (Chandapura) to SH 35 (Attibele) via Lakshmisagara, Allibommasandra, Guddahatti and Jigala to 7.42 | 7.42 | 7.42 | | 31-08-2020 | 29-11-2024 | 1551 | 5 |
| | 12340 | Bangalore Urban | Bengaluru | Anekal | KN-03-05 | Improvements to Road - MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya to 8.4 | 8.40 | 8.40 | | 31-08-2020 | 30-07-2021 | 333 | 25 |
| | 12338 | Bangalore Urban | Bengaluru | Anekal | KN-03-06 | Improvements to Road - T06-Guddahatti-Jigala Jun to TN Border (Meesaganahalli) Via Yadabvanahalli, Abbianapalya, Vaddarapalya, Manchanahalli, M.Medihalli, Rachamanahalli, Bidaragere, Muthagatti, Hompalaghatta to 21.5 | 21.50 | 21.50 | | 31-08-2020 | 28-02-2022 | 546 | 39 |
| | 12341 | Bangalore Urban | Bengaluru | Bangalore(E) | KN-03-07 | Improvements to Road - MRL14-MDR ( Byrathi) to MDR ( Angalapura)via Doddagubbi Colony, Doddagubbi. to 3.5 | 3.50 | 3.50 | | 28-08-2020 | 26-07-2021 | 332 | 11 |
| | 12343 | Bangalore Urban | Bengaluru | Bangalore(N) | KN-03-08 | Improvements to Road - MRL06-MDR (Dombarahalli) to SH-03 (Magadi Main Road) Via Machohalli, Machohalli JHC, KG Lakkenahalli, NR Pura, Kammasandra and Kadirenahalli to 4.7 | 4.70 | 4.70 | | 17-10-2020 | 05-03-2022 | 504 | 9 |
| | 12344 | Bangalore Urban | Bengaluru | Bangalore(N) | KN-03-08 | Improvements to Road - MRL01-NH-04 (Kodipalya) to SH-03(Chikka Gollarahatti) via Doddanna Layout, Channayakana Palya, Thippena Halli, Shantinagara, Gangondanahalli, Kachohalli Indira calony and Kachohalli. to 4.17 | 4.17 | 4.17 | | 17-10-2020 | 14-02-2024 | 1215 | 3 |
| | 12346 | Bangalore Urban | Bengaluru | Bangalore(N) | KN-03-09 | Improvements to Road - T01-NH-04 (Makali) to Kallegowdanapalya Via Balaveeranahalli, Hunnigere, Lakkenahalli, Byregowdanadoddi, Appanappanapalya, Gejjigadahalli, Harokyathanahalli, Kodipalya and Bheereshwaranagara to 17.51 | 17.51 | 17.51 | | 20-10-2020 | 10-03-2023 | 871 | 20 |
| | 12345 | Bangalore Urban | Bengaluru | Bangalore(N) | KN-03-10 | Improvements to Road - T02-Chikkabanavara (SH-02) to Nagadasanahalli Via Ganigarahalli, Kasaghattapura, Mylappanahalli, Madappanahalli, Itgalapura, Adde, Sadenahalli, Adiganahalli and Rajanukunte to 19.73 | 19.73 | 19.73 | | 09-11-2020 | 17-03-2023 | 858 | 23 |
| | 12347 | Bangalore Urban | Bengaluru | Bangalore(S) | KN-03-11 | Improvements to Road - MRL12-Tharalu To Kaggalipura- Bannerughatta Road Via Thataguppe,Alakabelalu And Gutte palya. to 6.26 | 6.26 | 6.26 | | 31-08-2020 | 29-04-2023 | 971 | 6 |
| | 12348 | Bangalore Urban | Bengaluru | Bangalore(S) | KN-03-11 | Improvements to Road - MRL16-Uttari- Thittahalli Road To Kere Choodahalli. Via Dinnepalya,And Chikka nagi palya. to 3.5 | 3.50 | 3.50 | | 31-08-2020 | 08-11-2023 | 1164 | 3 |
| | 12349 | Bangalore Urban | Bengaluru | Bangalore(S) | KN-03-11 | Improvements to Road - MRL11-NH 209 (Saluhunise) To NH209 Kanakapura main Road Via O B Choodahalli And Vaderahalli. to 7.5 | 7.50 | 7.50 | | 31-08-2020 | 31-05-2023 | 1003 | 7 |
| | 12194 | Belgaum | Belagavi | Athani | KN-04-01 | Improvements to Road - MRL10-Shiraguppi to Kallal via Shedbal Wadder vasti to 6.42 | 6.42 | 6.42 | | 16-07-2020 | 12-01-2022 | 545 | 12 |
| | 12196 | Belgaum | Belagavi | Athani | KN-04-01 | Improvements to Road - MRL17-Awarkhod to MDR via Radderhatti Karl tota to 7.865 | 7.86 | 7.86 | | 16-07-2020 | 28-01-2022 | 561 | 14 |
| | 12195 | Belgaum | Belagavi | Athani | KN-04-02 | Improvements to Road - MRL08-Athani to Halyal via Akalkallu Hulugabali to 12.4 | 12.40 | 12.40 | | 31-07-2020 | 22-01-2022 | 540 | 23 |
| | 12198 | Belgaum | Belagavi | Belgaum | KN-04-03 | Improvements to Road - MRL01-Kurabarahatti-Bastawad to Halaga to 5.474 | 5.47 | 5.47 | | 18-08-2020 | 11-07-2023 | 1057 | 5 |
| | 12199 | Belgaum | Belagavi | Belgaum | KN-04-03 | Improvements to Road - MRL04-Tarihal to Bagewadi to 4.1 | 4.10 | 4.10 | | 18-08-2020 | 11-07-2023 | 1057 | 4 |
| | 12200 | Belgaum | Belagavi | Belgaum | KN-04-04 | Improvements to Road - MRL35-Muchandi-Budyanur to Karavi to 5.69 | 5.69 | 5.69 | | 18-08-2020 | 18-06-2025 | 1765 | 3 |
| | 12203 | Belgaum | Belagavi | Chikkodi | KN-04-05 | Improvements to Road - MRL28-Bambalwad to Chanaveeranatti via Karagoan to 6.02 | 6.02 | 6.02 | | 30-07-2020 | 21-07-2022 | 721 | 8 |
| | 12201 | Belgaum | Belagavi | Chikkodi | KN-04-05 | Improvements to Road - MRL08-Khadakalat to Gouraimaradi via Chikalwal to 7.12 | 7.12 | 7.12 | | 30-07-2020 | 21-07-2022 | 721 | 10 |
| | 12202 | Belgaum | Belagavi | Chikkodi | KN-04-06 | Improvements to Road - MRL11-Gavan to MN Road (Mahat Godawn) to 5.881 | 5.88 | 5.88 | | 30-07-2020 | 30-11-2022 | 853 | 7 |
| | 12204 | Belgaum | Belagavi | Chikkodi | KN-04-06 | Improvements to Road - MRL13- MDR to Kasanal via Donewadi to 8.91 | 8.91 | 8.91 | | 30-07-2020 | 03-08-2022 | 734 | 12 |
| | 12208 | Belgaum | Belagavi | Hukkeri | KN-04-07 | Improvements to Road - MRL14-Kanagala to Solapur Via Honnihal to 6.539 | 6.54 | 6.54 | | 24-07-2020 | 31-05-2024 | 1407 | 5 |
| | 12207 | Belgaum | Belagavi | Hukkeri | KN-04-07 | Improvements to Road - MRL11-Kamatnur to SH via Yelimunnoli, Hanjanatti to 7.866 | 7.87 | 7.87 | | 24-07-2020 | 16-07-2022 | 722 | 11 |
| | 12209 | Belgaum | Belagavi | Hukkeri | KN-04-08 | Improvements to Road - MRL18-Chikkalagudda to Anandpur RC via Tudimal Tota, Ullagaddi Khanapur, Girinagar to 7.433 | 7.43 | 7.43 | | 21-09-2020 | 02-12-2025 | 1898 | 4 |
| | 12210 | Belgaum | Belagavi | Hukkeri | KN-04-08 | Improvements to Road - MRL25-Chilabhavi to Aralikatti Upto MDR to 7.551 | 7.55 | 7.55 | | 21-09-2020 | 05-07-2022 | 652 | 12 |
| | 12213 | Belgaum | Belagavi | Khanapur | KN-04-09 | Improvements to Road - MRL17-Hattargunji-Mudewadi-Dukarwadi To SH to 5.651 | 5.65 | 5.65 | | 07-08-2020 | 11-10-2023 | 1160 | 5 |
| | 12259 | Belgaum | Belagavi | Khanapur | KN-04-09 | Improvements to Road - MRL16-Katagali-Modekoppa To SH-31 to 6.603 | 6.60 | 6.60 | | 07-08-2020 | 11-10-2023 | 1160 | 6 |
| | 12211 | Belgaum | Belagavi | Khanapur | KN-04-10 | Improvements to Road - MRL10-Chapagaon-Jalaga To Karambal to 7.733 | 7.73 | 7.73 | | 21-07-2020 | 31-03-2024 | 1349 | 6 |
| | 12212 | Belgaum | Belagavi | Khanapur | KN-04-11 | Improvements to Road - MRL03-Chapoli To SH via Jamboti to 9.82 | 9.82 | 9.82 | | 25-08-2020 | 21-02-2024 | 1275 | 8 |
| | 12216 | Belgaum | Belagavi | Raibag | KN-04-12 | Improvements to Road - MRL07-Bykud to Nidgundi to 6.406 | 6.41 | 6.41 | | 24-07-2020 | 15-02-2023 | 936 | 7 |
| | 12214 | Belgaum | Belagavi | Raibag | KN-04-12 | Improvements to Road - MRL23-Chinchali to Ugardharan via tikanal tota to 6.616 | 6.62 | 6.62 | | 24-07-2020 | 17-01-2022 | 542 | 12 |
| | 12258 | Belgaum | Belagavi | Raibag | KN-04-13 | Improvements to Road - MRL04-Paramandwadi to koligudd to 9.006 | 9.01 | 9.01 | | 24-07-2020 | 20-09-2023 | 1153 | 8 |
| | 12215 | Belgaum | Belagavi | Raibag | KN-04-14 | Improvements to Road - MRL03-Raibag Ambekdkar nagar to chinchali via Jalapur,Bhiradi to 9.186 | 9.19 | 9.19 | | 30-07-2020 | 30-11-2022 | 853 | 11 |
| | 12260 | Belgaum | Gokak | Bailahongala | KN-04-15 | Improvements to Road - MRL09-Neelamma Temple-Murkibhavi-Mutawad to 8.61 | 8.61 | 8.61 | | 25-08-2020 | 10-04-2023 | 958 | 9 |
| | 12261 | Belgaum | Gokak | Bailahongala | KN-04-16 | Improvements to Road - MRL36-Yarguddi Bairnatti Hanumanatti to 6.43 | 6.43 | 6.43 | | 25-08-2020 | 30-03-2022 | 582 | 11 |
| | 12597 | Belgaum | Gokak | Bailahongala | KN-04-17 | Improvements to Road - MRL06-Jamalur T Shigihalli Road to 6.09 | 6.09 | 6.09 | | 04-11-2020 | 31-03-2023 | 877 | 7 |
| | 12599 | Belgaum | Gokak | Bailahongala | KN-04-18 | Improvements to Road - MRL39-Mugabasav Budihal to Belawadi to 9.494 | 9.49 | 9.49 | | 12-10-2020 | 31-07-2022 | 657 | 14 |
| | 12228 | Belgaum | Gokak | Bailahongala | KN-04-18 | Construction of Long span bridge - Construction of Box culvert at Ch 0.290km on Mugabasav Budihal road to 16.3 | 16.30 | 16.30 | | 12-10-2020 | 31-07-2022 | 657 | 25 |
| | 12601 | Belgaum | Gokak | Bailahongala | KN-04-19 | Improvements to Road - MRL24-Ambadgatti Tegur Gandigwad to 5.01 | 5.01 | 5.01 | | 04-11-2020 | 31-03-2023 | 877 | 6 |
| | 12600 | Belgaum | Gokak | Bailahongala | KN-04-19 | Improvements to Road - MRL11-Hirenandihalli to Hoskoti to 4.9 | 4.90 | 4.90 | | 04-11-2020 | 30-11-2022 | 756 | 6 |
| | 12598 | Belgaum | Gokak | Bailahongala | KN-04-20 | Improvements to Road - MRL38-Maradinaglapur Tigadi Chikkabagewadi to 4.473 | 4.47 | 4.47 | | 04-11-2020 | 30-03-2022 | 511 | 9 |
| | 12205 | Belgaum | Gokak | Gokak | KN-04-21 | Improvements to Road - MRL19-Betageri to melvanki road via upparahatti to 11.6 | 11.60 | 11.60 | | 04-07-2020 | 30-04-2023 | 1030 | 11 |
| | 12206 | Belgaum | Gokak | Gokak | KN-04-22 | Improvements to Road - MRL03-Waderahatti Naganur Road to 6.435 | 6.43 | 6.43 | | 15-09-2020 | 28-02-2022 | 531 | 12 |
| | 12218 | Belgaum | Gokak | Gokak | KN-04-23 | Improvements to Road - MRL16-FROM KUNDHARAGI TO GUJANAL VIA MALLAPUR SA to 6.951 | 6.95 | 6.95 | | 10-07-2020 | 31-12-2022 | 904 | 8 |
| | 12217 | Belgaum | Gokak | Gokak | KN-04-24 | Improvements to Road - MRL23-mallapur pg badigawad road via duiradundi to 7.91 | 7.91 | 7.91 | | 10-07-2020 | 16-06-2023 | 1071 | 7 |
| | 12219 | Belgaum | Gokak | Ramadurga | KN-04-25 | Improvements to Road - MRL24-Katakol to M Chandaragi Road to 6 | 6.00 | 6.00 | | 12-10-2020 | 31-03-2022 | 535 | 11 |
| | 12221 | Belgaum | Gokak | Ramadurga | KN-04-25 | Improvements to Road - T03-Chippalakatti to tondikatti to 6 | 6.00 | 6.00 | | 12-10-2020 | 15-04-2022 | 550 | 11 |
| | 12220 | Belgaum | Gokak | Ramadurga | KN-04-26 | Improvements to Road - MRL18-Hosur to SH-14 ( via Kolachi Ghataknur) to 6.663 | 6.66 | 6.66 | | 24-07-2020 | 09-02-2022 | 565 | 12 |
| | 12222 | Belgaum | Gokak | Ramadurga | KN-04-27 | Improvements to Road - MRL27-Panchagaon to Budnur Road Via Gudagamnal- Panchagaon Road to 11.025 | 11.02 | 11.02 | | 21-08-2020 | 31-01-2023 | 893 | 12 |
| | 12224 | Belgaum | Gokak | Soundatti | KN-04-28 | Improvements to Road - MRL10-Dundankoppa to Hosur to 5.17 | 5.17 | 5.17 | | 02-09-2020 | 30-08-2022 | 727 | 7 |
| | 12223 | Belgaum | Gokak | Soundatti | KN-04-28 | Improvements to Road - T11-Murgod to Harugoppa to 5.53 | 5.53 | 5.53 | | 02-09-2020 | 30-08-2022 | 727 | 8 |
| | 12225 | Belgaum | Gokak | Soundatti | KN-04-29 | Improvements to Road - MRL22-Hooli to Hanchinal (Via Chikkumbi) to 12.75 | 12.75 | 12.75 | | 12-10-2020 | 15-04-2024 | 1281 | 10 |
| | 12226 | Belgaum | Gokak | Soundatti | KN-04-30 | Improvements to Road - MRL20-Hanchinal to Achamatti upto Taluka Border to 5.78 | 5.78 | 5.78 | | 21-08-2020 | 20-04-2023 | 972 | 6 |
| | 12227 | Belgaum | Gokak | Soundatti | KN-04-30 | Improvements to Road - MRL18-Sattigeri to Yaraganavi (via Gudamakeri) to 4.25 | 4.25 | 4.25 | | 21-08-2020 | 10-05-2022 | 627 | 7 |
| | 13129 | Belgaum | Gokak | Belgaum | KN-04-31 | Improvements to Road - MRL21-Hindalaga-Ambewadi-Khadi machine to Kadoli to 5.757 | 5.76 | 5.76 | Sreedhar R | 01-07-2021 | 30-03-2023 | 637 | 9 |
| | 13136 | Belgaum | Gokak | Belgaum | KN-04-32 | Improvements to Road - MRL16-Mannikeri-Kedanur upto NH4 to 3.995 | 3.99 | 3.99 | M/s S R Bandiwad and Sons | 18-12-2021 | 20-09-2023 | 641 | 6 |
| | 13133 | Belgaum | Gokak | Chikkodi | KN-04-33 | Improvements to Road - MRL23-Janawad to Borgaon via Dongewasti to 4.9 | 4.90 | 4.90 | Ravindra A Mali | 15-04-2021 | 21-12-2022 | 615 | 8 |
| | 13135 | Belgaum | Gokak | Chikkodi | KN-04-33 | Improvements to Road - MRL04-Examba to taluka border via mallikwad to 4.45 | 4.45 | 4.45 | Ravindra A Mali | 15-04-2021 | 31-12-2022 | 625 | 7 |
| | 13132 | Belgaum | Gokak | Chikkodi | KN-04-34 | Improvements to Road - MRL30-Nippani to Ambedakar Nagar Akkol via Lakhanapur to 3.05 | 3.05 | 3.05 | SHRI MAHALAXMI CONSTRUCTIONS (CHIDANAND SHIVABALU PHARALE ) | 15-04-2021 | 14-03-2022 | 333 | 9 |
| | 13134 | Belgaum | Gokak | Chikkodi | KN-04-34 | Improvements to Road - MRL27-Taluka Border to borganwadi via Kasanal to 4.9 | 4.90 | 4.90 | SHRI MAHALAXMI CONSTRUCTIONS (CHIDANAND SHIVABALU PHARALE ) | 15-04-2021 | 05-03-2022 | 324 | 15 |
| | 13131 | Belgaum | Gokak | Athani | KN-04-35 | Improvements to Road - MRL07-Aigali cross to Kohalli via Keskardaddi to 6 | 6.00 | 6.00 | JAGANNATH S NEMAGOUDA | 05-07-2021 | 27-02-2023 | 602 | 10 |
| | 13130 | Belgaum | Gokak | Athani | KN-04-36 | Improvements to Road - MRL13-Alalgouda vasti (MDR) to Taluka border via Adahalli to 9.98 | 9.98 | 9.98 | Girish G Sajjan | 23-06-2021 | 02-06-2022 | 344 | 29 |
| | 13062 | Belgaum | Gokak | Gokak | KN-04-37 | Improvements to Road - MRL20-mudalagi dharmatti masaguppi road to 9.9 | 9.90 | 9.90 | JAYASHEEL NARAYAN SHETTY | 27-04-2021 | 30-12-2022 | 612 | 16 |
| | 12330 | Bellary | Bellary | Hadagali | KN-05-80 | Improvements to Road - T17-Kattebenur to Hosahalli to 5.54 | 5.54 | 5.54 | | 17-08-2020 | 15-07-2021 | 332 | 17 |
| | 13124 | Bellary | Bellary | Hagaribommanahalli | KN-05-81 | Improvements to the road from MRL05-Hampapattana to MDR-1 via Guledal from Ch:0.00 to 5.20 Km | 5.20 | 5.20 | H Umapathi | 15-07-2021 | 09-06-2023 | 694 | 7 |
| | 13125 | Bellary | Bellary | Hagaribommanahalli | KN-05-81 | Improvements to the road from T12-Mutuganahalli to Nandipura Cross Via Mutugunahalli | 7.41 | 7.41 | H Umapathi | 15-07-2021 | 09-06-2023 | 694 | 11 |
| | 13126 | Bellary | Bellary | Hagaribommanahalli | KN-05-82 | Improvements to the road from T15-Deshmapura to H Obalapura Via T Basapura from Ch:0.00 to 7.20 Km | 7.20 | 7.20 | Reddy Keshava Reddy | 13-07-2021 | 11-07-2022 | 363 | 20 |
| | 13127 | Bellary | Bellary | Hagaribommanahalli | KN-05-82 | Improvements to the road from MRL04-Malvi to Shivanandanagara from Ch:0.00 to 5.75 Km | 5.75 | 5.75 | Reddy Keshava Reddy | 13-07-2021 | 11-07-2022 | 363 | 16 |
| | 13128 | Bellary | Bellary | Hagaribommanahalli | KN-05-83 | Improvements to the road from T05-Gaddikere to Mutuganahalli From Ch:0.00 to 9.1 Km | 9.10 | 9.10 | Doddabasappa V | 19-07-2021 | 14-07-2022 | 360 | 25 |
| | 13141 | Bellary | Bellary | Kudligi | KN-05-84 | Improvements to the road from MRL05-CK Kunte to Tq Border via K Gollarahatti From Ch:0.00 to 8.10 Km ,Kudligi Taluk, Bellary District | 8.10 | 8.10 | S Rajendraprasad (Varavi Malleswara Contract Company Pvt Ltd) | 14-07-2021 | 01-06-2023 | 687 | 12 |
| | 13142 | Bellary | Bellary | Kudligi | KN-05-84 | Improvements to the road from T14-Manganahalli to SH-131 via Kalapura From Ch:0.00 to 6.60 Km, Kudligi Taluk, Bellary District | 6.60 | 6.60 | S Rajendraprasad (Varavi Malleswara Contract Company Pvt Ltd) | 14-07-2021 | 19-09-2023 | 797 | 8 |
| | 13143 | Bellary | Bellary | Kudligi | KN-05-85 | Improvements to the road MRL01-Murthynayakanahalli cross to boranahalli From Ch : 0.00 to 8.3 Km ,Kudligi Taluk, Bellary District | 8.30 | 8.30 | S Rajendraprasad (Varavi Malleswara Contract Company Pvt Ltd) | 13-07-2021 | 11-07-2022 | 363 | 23 |
| | 13144 | Bellary | Bellary | Kudligi | KN-05-86 | Improvements to the road T02-M B Ayyanahalli to SH 131 Hulikunte From Ch:0.00 to 10.635 Km , ,Kudligi Taluk, Bellary District | 10.64 | 10.64 | Sali Basavaraj | 23-07-2021 | 30-04-2023 | 646 | 16 |
| | 13146 | Bellary | Bellary | Hadagali | KN-05-87 | Improvements to the road from TMRL02-Dasarahalli Thanda to Hakkandi via Hiremallanakere From Ch:0.00 to 9.14 KM ,Hadagali Taluk, Bellary District | 9.14 | 9.14 | Laxman Guddappa Honnappanavar | 26-07-2021 | 27-06-2022 | 336 | 27 |
| | 13224 | Bellary | Bellary | Hadagali | KN-05-87 | Improvements to the road from T16-Hagarnoor to Magala From Ch : 0.00 to 8.55 Km, Hadagali Taluk, Bellary District | 8.55 | 8.55 | Laxman Guddappa Honnappanavar | 26-07-2021 | 27-06-2022 | 336 | 25 |
| | 13150 | Bellary | Bellary | Bellary | KN-05-88 | Improvements to the road from MRL03-Badanahatti to Madire via Vaddatti Road Ch:0.00 to 9.03 Km ,Bellary Taluk, Bellary District | 9.03 | 9.03 | K M Sri Siddarameshwara Constructions | 09-07-2021 | 23-01-2024 | 928 | 10 |
| | 13151 | Bellary | Bellary | Bellary | KN-05-88 | Improvements to the road from MRL44-Vaddatti to Kolur - Kurugodu road From Ch:0.00 to 5.072 Km ,Bellary Taluk, Bellary District | 5.07 | 5.07 | Sri Siddarameshwara Constructions | 09-07-2021 | 23-01-2024 | 928 | 5 |
| | 13153 | Bellary | Bellary | Bellary | KN-05-89 | Improvements to the road from MRL50-MDR Near Srinivas nagar Camp to NH From Ch:0.00 to 5.04 Km, Bellary Taluk, Bellary District | 5.04 | 5.04 | Chandrashekar Gowda M (MSG Constructions) | 30-06-2021 | 31-03-2023 | 639 | 8 |
| | 13152 | Bellary | Bellary | Bellary | KN-05-89 | Improvements to the road from MRL19-Goturu to korlagundi,Jalibenchi From Ch:0.00 to 9.81 Km, Bellary Taluk, Bellary District | 9.81 | 9.81 | Chandrashekar Gowda M (MSG Constructions) | 30-06-2021 | 03-03-2023 | 611 | 16 |
| | 13154 | Bellary | Bellary | Bellary | KN-05-90 | Improvements to the road MRL99-Yelubenchi to Daroji station Road From Ch:0.00 to 5.14 Km, Bellary Taluk, Bellary District | 5.14 | 5.14 | Shivakumar | 12-07-2021 | 28-02-2023 | 596 | 9 |
| | 13159 | Bellary | Bellary | Hospet | KN-05-93 | Improvements to the road from MRL21-Devasamudra to SH-49 From Ch:0.00 to 3.32 Km, Hospet Taluk, Bellary District | 3.32 | 3.32 | G Haribabu | 30-07-2021 | 31-05-2023 | 670 | 5 |
| | 13158 | Bellary | Bellary | Hospet | KN-05-93 | Improvements to the road from MRL19-Itigi to Basaveshwara camp via No.2 Muddapura From Ch:0.00 to 6.865 Km, Hospet Taluk, Bellary District | 6.87 | 6.87 | G Haribabu | 30-07-2021 | 03-03-2023 | 581 | 12 |
| | 13160 | Bellary | Bellary | Hospet | KN-05-94 | Improvements to the road T01-Sanklapur to Nallapura From Ch:0.00 to 16.64 Km, Hospet Taluk, Bellary District | 16.64 | 16.64 | U R Subramaniam (Eagle Earth Movers Pvt Ltd) | 15-07-2021 | 31-12-2022 | 534 | 31 |
| | 13161 | Bellary | Bellary | Sandoor | KN-05-95 | Improvements to the road from MRL14-Hale Madapura to Hale Darojii From Ch:0.00 to 4.525 Km, Sandoor Taluk, Bellary District | 4.53 | 4.53 | P Prabhakar Reddy | 21-06-2021 | 28-02-2022 | 252 | 18 |
| | 13223 | Bellary | Bellary | Sandoor | KN-05-95 | Dismantling existing & Construction of Proposed RCC Box Bridge (3mx1.5mx10V) 7.50m length of 34.025, Sandoor Taluk, Bellary District | 0.00 | 0.00 | P Prabhakar Reddy | 21-06-2021 | 28-02-2022 | 252 | 0 |
| | 13162 | Bellary | Bellary | Sandoor | KN-05-96 | Improvements to the road from MRL15-Tyagadal to Ankammanahal Via D.Mallapura, Hirehal From Ch:0.00 to5.95 Km, Sandoor Taluk, Bellary District | 5.95 | 5.95 | Yerruswamy U (Basappa Costructions) | 30-06-2021 | 31-03-2023 | 639 | 9 |
| | 13163 | Bellary | Bellary | Sandoor | KN-05-96 | Improvements to the road from MRL13-Tokanahalli to Sheliyappanahalli From Ch:0.00 to 7.26 Km, Sandoor Taluk, Bellary District | 7.26 | 7.26 | Yerriswamy U (Basappa Costructions) | 30-06-2021 | 31-03-2023 | 639 | 11 |
| | 13924 | Bellary | Bellary | Kudligi | KN-05-97 | Improvements to Road from solladahalli to MDR-4 Via Agrahara, pallyanakote in Kudligi Taluk, Ballari District | 3.67 | 3.67 | V.Doddabasappa | 10-05-2022 | 19-04-2023 | 344 | 11 |
| | 14746 | Bellary | Bellary | Bellary | KN-05-98 | Improvements Road from MRL-40 Byloor to Chanal in Kampli Constituency Ballari District. | 8.24 | 8.24 | G Haribabu | 01-09-2023 | 30-11-2024 | 456 | 18 |
| | 13182 | Bidar | Bidar | Aurad | KN-06-07 | Improvements to Road - MRL02-Kamalnagar to Lakhangoan Border to 3.69 | 3.69 | 3.69 | Hanmanthappa Khoba | 05-07-2021 | 31-10-2024 | 1214 | 3 |
| | 13183 | Bidar | Bidar | Aurad | KN-06-07 | Improvements to Road - MRL12-Dongoan (M) to Kamalnagar to 5.56 | 5.56 | 5.56 | Hanmanthappa Khoba | 05-07-2021 | 30-09-2024 | 1183 | 5 |
| | 13187 | Bidar | Bidar | Aurad | KN-06-08 | Improvements to Road - MRL05-Mudhol (B) to Bedkunda Cross via Lingadhalli (U) to 3.62 | 3.62 | 3.62 | JAGDISH KHUBA | 01-07-2021 | 31-10-2023 | 852 | 4 |
| | 13184 | Bidar | Bidar | Aurad | KN-06-08 | Improvements to Road - MRL09-Jojana to Yengunda via Jonnikeri to 5.46 | 5.46 | 5.46 | JAGDISH KHUBA | 01-07-2021 | 31-10-2023 | 852 | 6 |
| | 13185 | Bidar | Bidar | Aurad | KN-06-09 | Improvements to Road - T01-Mungnal to Chintaki to 11.42 | 11.42 | 11.42 | SACHIN KOLLUR ( KOLLUR GURUNATH CONSTRUCTION INFRA PRIVATE LIMITED ) | 06-05-2022 | 30-11-2024 | 939 | 12 |
| | 13188 | Bidar | Bidar | Aurad | KN-06-10 | Improvements to Road - T03-Jojana to Chikli (J) Cross via Medpalli to 9.01 | 9.01 | 9.01 | JAGDISH KHUBA | 30-06-2021 | 03-10-2023 | 825 | 11 |
| | 13186 | Bidar | Bidar | Aurad | KN-06-10 | Improvements to Road - MRL10-Wadgoan to Sundhal Via Beldal to 4.85 | 4.85 | 4.85 | JAGDISH KHUBA | 30-06-2021 | 03-10-2023 | 825 | 6 |
| | 13192 | Bidar | Bidar | Basavanakalyan | KN-06-11 | Improvements to Road - MRL08-Taluka Border to Hulsoor via Govardhan Tanda to 4.26 | 4.26 | 4.26 | JAGDISH KHUBA | 30-06-2021 | 15-02-2023 | 595 | 7 |
| | 13190 | Bidar | Bidar | Basavanakalyan | KN-06-11 | Improvements to Road - MRL18-SH-34 to to Taluka Border via Toglur to 8.85 | 8.85 | 8.85 | JAGDISH KHUBA | 30-06-2021 | 15-02-2023 | 595 | 15 |
| | 13191 | Bidar | Bidar | Basavanakalyan | KN-06-12 | Improvements to Road - T02-Morkhandi to Mannalli via Kamblewadi, Halli to 3.96 | 3.96 | 3.96 | Ravishankar R Andral | 09-09-2021 | 13-03-2024 | 916 | 4 |
| | 13189 | Bidar | Bidar | Basavanakalyan | KN-06-12 | Improvements to Road - MRL21-SH-51 to Taluka border via Attur to 5.72 | 5.72 | 5.72 | Ravishankar R Andral | 09-09-2021 | 13-03-2024 | 916 | 6 |
| | 13193 | Bidar | Bidar | Basavanakalyan | KN-06-13 | Improvements to Road - MRL15-Ladwanti to State border Via Ramtirth D to 6.27 | 6.27 | 6.27 | MOHAMMED SIRAJUDDIN ( MOHD SIRAJUDDIN GULAM ) | 28-07-2021 | 30-09-2024 | 1160 | 5 |
| | 13195 | Bidar | Bidar | Basavanakalyan | KN-06-14 | Improvements to Road - MRL19-Bebaluknda to Taluka border via Gokul to 4.1 | 4.10 | 4.10 | MANE SUNIL CHANDRABHAN ( BALAJI CONSTRUCTION ) | 30-06-2021 | 14-02-2023 | 594 | 7 |
| | 13194 | Bidar | Bidar | Basavanakalyan | KN-06-14 | Improvements to Road - MRL14-Ladwanti to Dhamuri via Ujlamb to 8.15 | 8.15 | 8.15 | MANE SUNIL CHANDRABHAN ( BALAJI CONSTRUCTION ) | 30-06-2021 | 14-02-2023 | 594 | 14 |
| | 13199 | Bidar | Bidar | Bhalki | KN-06-15 | Improvements to Road - MRL26-metimelkunda wadi cross to Bhatambra via jaigaon cross to 6.15 | 6.15 | 6.15 | Prakash S Sonji ( PRAKASH SHAMRAO SONJE ) | 30-06-2021 | 30-04-2023 | 669 | 9 |
| | 13197 | Bidar | Bidar | Bhalki | KN-06-15 | Improvements to Road - MRL17-Kakanal to MDR via Metimrlkunda to 3.35 | 3.35 | 3.35 | Prakash S Sonji ( PRAKASH SHAMRAO SONJE ) | 30-06-2021 | 15-04-2023 | 654 | 5 |
| | 13198 | Bidar | Bidar | Bhalki | KN-06-17 | Improvements to Road - MRL18-Aproach road to Bhatsangvi via jeergyal to 5.82 | 5.82 | 5.82 | Prakash S Sonji ( PRAKASH SHAMRAO SONJE ) | 30-06-2021 | 30-04-2023 | 669 | 9 |
| | 13202 | Bidar | Bidar | Bhalki | KN-06-17 | Improvements to Road - MRL16-Beeri K to Hajnal via Nittur B to 3.97 | 3.97 | 3.97 | Prakash S Sonji ( PRAKASH SHAMRAO SONJE ) | 30-06-2021 | 15-04-2023 | 654 | 6 |
| | 13207 | Bidar | Bidar | Bidar | KN-06-18 | Improvements to Road - MRL14-Aproach Road to Sirsi A to 5 | 5.00 | 5.00 | Sangamesh laxman kotarki ( KOTARKI CONSTRUCTIONS PRIVATE LIMITED ) | 27-08-2021 | 03-10-2023 | 767 | 7 |
| | 13203 | Bidar | Bidar | Bidar | KN-06-18 | Improvements to Road - MRL12-Aliamber to islampur to 4.65 | 4.65 | 4.65 | Sangamesh laxman kotarki ( KOTARKI CONSTRUCTIONS PRIVATE LIMITED ) | 27-08-2021 | 31-03-2024 | 947 | 5 |
| | 13205 | Bidar | Bidar | Bidar | KN-06-19 | Improvements to Road - MRL13-Bellura to kamthana-Hallhali road via Bakchodi,Secendrapur. to 6.45 | 6.45 | 6.45 | Shivraj ( SHIVARAJ SANGRAMAPPA ) | 01-07-2021 | 27-06-2023 | 726 | 9 |
| | 13204 | Bidar | Bidar | Bidar | KN-06-20 | Improvements to Road - MRL08-Yadalapur to Nagoor cross via kuttubad t.mirzapur to 6.13 | 6.13 | 6.13 | VISHWANATH BHIMANNA PATIL | 22-07-2021 | 21-04-2023 | 638 | 10 |
| | 13206 | Bidar | Bidar | Bidar | KN-06-20 | Improvements to Road - MRL10-Bagdalthanda A to Budheera via Chatnalli,Chatanalli Wadi. to 5 | 5.00 | 5.00 | VISHWANATH BHIMANNA PATIL | 22-07-2021 | 21-04-2023 | 638 | 8 |
| | 13208 | Bidar | Bidar | Humnabad | KN-06-21 | Improvements to Road - MRL13-Mugnoor Cross MDR001 to Handikera to 5.38 | 5.38 | 5.38 | Ravishankar R Andral | 12-08-2021 | 30-09-2023 | 779 | 7 |
| | 13209 | Bidar | Bidar | Humnabad | KN-06-21 | Improvements to Road - MRL07-Ghatboral to Sonekera to 5.92 | 5.92 | 5.92 | Ravishankar R Andral | 12-08-2021 | 30-09-2023 | 779 | 8 |
| | 13210 | Bidar | Bidar | Humnabad | KN-06-22 | Improvements to Road - MRL14-Hudagi to NH-50 to 5.92 | 5.92 | 5.92 | VISHWANATH BHIMANNA PATIL | 01-07-2021 | 21-04-2023 | 659 | 9 |
| | 13211 | Bidar | Bidar | Humnabad | KN-06-22 | Improvements to Road - MRL08-Hallikhed B to Beinchincholi to 4.05 | 4.05 | 4.05 | VISHWANATH BHIMANNA PATIL | 01-07-2021 | 21-04-2023 | 659 | 6 |
| | 13212 | Bidar | Bidar | Humnabad | KN-06-23 | Improvements to Road - MRL10-Mannaekhelli to MDR003 via basirapur to 4.24 | 4.24 | 4.24 | Anil Kumar Rathod | 12-07-2021 | 15-07-2023 | 733 | 6 |
| | 13214 | Bidar | Bidar | Humnabad | KN-06-23 | Improvements to Road - MRL17-Udabal halikhed MDR to Nirna MDR Via Nagankera to 5 | 5.00 | 5.00 | Anil Kumar Rathod | 12-07-2021 | 15-07-2023 | 733 | 7 |
| | 13215 | Bidar | Bidar | Humnabad | KN-06-24 | Improvements to Road - T04-Mustari wadi to Taluka Border Towards khanapur to 3.55 | 3.55 | 3.55 | SACHIN KOLLUR ( KOLLUR GURUNATH CONSTRUCTION INFRA PRIVATE LIMITED ) | 13-10-2021 | 19-06-2024 | 980 | 4 |
| | 13213 | Bidar | Bidar | Humnabad | KN-06-24 | Improvements to Road - T01-Chitguppa To Jalsangi Via Hiparga Madargaon Malkapur to 6.38 | 6.38 | 6.38 | SACHIN KOLLUR ( KOLLUR GURUNATH CONSTRUCTION INFRA PRIVATE LIMITED ) | 13-10-2021 | 19-06-2024 | 980 | 7 |
| | 12477 | Bijapur | Vijayapura | Bijapur | KN-07-01 | Improvements to Road - T06-Tikota to Kanmuchnal via Harnal Tajpur(H) to 13.43 | 13.43 | 13.43 | | 19-09-2020 | 17-03-2024 | 1275 | 11 |
| | 12478 | Bijapur | Vijayapura | Bijapur | KN-07-02 | Improvements to Road - MRL22-Kathijapur to Jumanal Road to 5.4 | 5.40 | 5.40 | | 21-09-2020 | 18-08-2021 | 331 | 16 |
| | 12479 | Bijapur | Vijayapura | Indi | KN-07-03 | Improvements to Road - MRL01-Masali BK to Tambha to 10.9 | 10.90 | 10.90 | | 22-09-2020 | 20-07-2022 | 666 | 16 |
| | 12482 | Bijapur | Vijayapura | Indi | KN-07-04 | Improvements to Road - MRL06-Lingadalli LT1 to Hanjagi to 6.1 | 6.10 | 6.10 | | 14-08-2020 | 25-03-2021 | 223 | 27 |
| | 12480 | Bijapur | Vijayapura | Indi | KN-07-04 | Improvements to Road - T02-Hirebevanur to Padnur to 9.08 | 9.08 | 9.08 | | 14-08-2020 | 18-06-2023 | 1038 | 9 |
| | 12481 | Bijapur | Vijayapura | Indi | KN-07-05 | Improvements to Road - MRL07-Hirebevanur to Lalsangi to 10.6 | 10.60 | 10.60 | | 29-08-2020 | 20-07-2021 | 325 | 33 |
| | 12483 | Bijapur | Vijayapura | Indi | KN-07-06 | Improvements to Road - MRL10-Savalasang to Devarnimbaragi to 12.22 | 12.22 | 12.22 | | 19-08-2020 | 15-07-2021 | 330 | 37 |
| | 12488 | Bijapur | Vijayapura | Sindagi | KN-07-07 | Improvements to Road - MRL10-Devarnavadagi to Kumasagi to 4.5 | 4.50 | 4.50 | | 17-08-2020 | 25-01-2021 | 161 | 28 |
| | 12484 | Bijapur | Vijayapura | Sindagi | KN-07-07 | Improvements to Road - MRL01-Tontapur to Alamel to 5.2 | 5.20 | 5.20 | | 17-08-2020 | 25-02-2021 | 192 | 27 |
| | 12487 | Bijapur | Vijayapura | Sindagi | KN-07-08 | Improvements to Road - MRL09-Hittanalli to Mulasavalagi to 5.32 | 5.32 | 5.32 | | 14-08-2020 | 25-06-2021 | 315 | 17 |
| | 12485 | Bijapur | Vijayapura | Sindagi | KN-07-08 | Improvements to Road - MRL04-Kerutagi to Kalakeri to 5.4 | 5.40 | 5.40 | | 14-08-2020 | 25-06-2021 | 315 | 17 |
| | 12486 | Bijapur | Vijayapura | Sindagi | KN-07-09 | Improvements to Road - MRL02-Kalakeri to Kondaguli to 12.37 | 12.37 | 12.37 | | 18-09-2020 | 17-08-2021 | 333 | 37 |
| | 12490 | Bijapur | Vijayapura | Sindagi | KN-07-10 | Improvements to Road - MRL06-Hikkanagutti to Balaganur to 5.9 | 5.90 | 5.90 | | 22-09-2020 | 01-07-2021 | 282 | 21 |
| | 12489 | Bijapur | Vijayapura | Sindagi | KN-07-10 | Improvements to Road - MRL13-Korahalli to Ganihar to 5.1 | 5.10 | 5.10 | | 22-09-2020 | 25-03-2021 | 184 | 28 |
| | 13172 | Bijapur | Vijayapura | Muddebihal | KN-07-11 | Improvements to Road from Nalatwad to Bijjur in Muddebihal Taluka of Vijayapur District | 4.90 | 4.90 | M L Chavan | 30-06-2021 | 12-01-2023 | 561 | 9 |
| | 13173 | Bijapur | Vijayapura | Muddebihal | KN-07-11 | Improvements to Road From Nalatwad To join Arasanal in Muddebihal Taluka of Vijayapur District | 7.10 | 7.10 | M L Chavan | 30-06-2021 | 24-02-2023 | 604 | 12 |
| | 13176 | Bijapur | Vijayapura | Muddebihal | KN-07-12 | Improvements to Road Balabatti to Hullur LT1 in Muddebihal taluka of vijayapur district | 7.51 | 7.10 | R H Mantur | 01-07-2021 | 12-01-2023 | 560 | 13 |
| | 13177 | Bijapur | Vijayapura | Muddebihal | KN-07-12 | Improvements to Roads Dgavalagi to Chondi in Muddebihal taluka of vijayapur district | 6.20 | 6.20 | R H Mantur | 01-07-2021 | 27-12-2022 | 544 | 11 |
| | 13175 | Bijapur | Vijayapura | Muddebihal | KN-07-13 | Improvements to Road from Basarkod to Tapalkatti in Muddebihal taluka of vijayapur district | 4.50 | 4.50 | S H Patil Padaganur | 07-07-2021 | 06-06-2022 | 334 | 13 |
| | 13178 | Bijapur | Vijayapura | Muddebihal | Kn-07-13 | Improvements to Road from-Ingalageri MDR-13 to Vanahalli MDR-10 in Muddebihal Taluka taluka of vijayapur district | 5.40 | 5.40 | S H Patil Padaganur | 07-07-2021 | 06-06-2022 | 334 | 16 |
| | 13179 | Bijapur | Vijayapura | Muddebihal | KN-07-14 | Improvements to Road Balaganur to Lingadalli in Muddebihal taluka of vijayapur district | 5.90 | 5.78 | Mallanagouda S Patil | 28-06-2021 | 22-07-2023 | 754 | 8 |
| | 13684 | Bijapur | Vijayapura | Basavanabagevadi | KN-07-15 | MRL-13- Masuti to Cheeraladinni in B.Bagewadi Taluka | 4.50 | 4.50 | M/s B.R.Nandegoal | 28-03-2022 | 17-11-2023 | 599 | 8 |
| | 14052 | Bijapur | Vijayapura | Basavanabagevadi | KN-07-15 | Improvement to road from MRL-03 Golasangi LT-Kudagi to Talewad road | 7.02 | 7.02 | M/s B.R.Nandegoal | 28-03-2022 | 17-11-2023 | 599 | 12 |
| | 13147 | Bijapur | Vijayapura | Basavanabagevadi | KN-07-17 | Improvement to road from MRL01-Golasangi to Muttaladinni road in B.Bagewadi Taluka of Vijayapur District | 13.05 | 13.05 | Sadashiv.C.Chikaraddi | 31-07-2021 | 31-01-2024 | 914 | 14 |
| | 13166 | Bijapur | Vijayapura | Bijapur | KN-07-18 | IMPROVEMENTS TO ROAD FROM ARAKERI TO KANNAL LT(0.00 TO 4.50) | 4.50 | 4.50 | S.I.DONUR | 19-07-2021 | 16-08-2022 | 393 | 11 |
| | 13167 | Bijapur | Vijayapura | Bijapur | KN-07-18 | IMPROVEMENTS TO ROAD FROM KUMATE TO JOIN NIDONI (CH 0.00 TO 7.50KM) | 7.50 | 7.50 | S.I.DONUR | 19-07-2021 | 16-08-2022 | 393 | 19 |
| | 13222 | Bijapur | Vijayapura | Bijapur | KN-07-19 | Improvements to Road T04- Minchanal Rly St to Aheri Via Nagthan, Dyaberi Package No: KN-07-19 in Vijayapur Taluk of Vijayapur District | 9.87 | 9.87 | Sri S M Ullagaddi | 01-07-2021 | 15-12-2021 | 167 | 59 |
| | 13322 | Bijapur | Vijayapura | Bijapur | KN-07-20 | Improvements to Road T03-Honnalli to Approach Road to NH near Baratagi LT 2 in Vijayapur Taluka of Vijayapur District | 8.10 | 8.10 | Appaji Builders (Sri S.N.Hosamani) | 05-08-2021 | 03-08-2024 | 1094 | 7 |
| | 13413 | Bijapur | Vijayapura | Sindagi | KN-07-21 | Improvements to Road - MRL08-NH-218 to Hachyal cross via Sompur to 7.1 | 7.10 | 7.10 | Chandrakant Mahadev Nagaragoji | 19-02-2022 | 17-01-2023 | 332 | 21 |
| | 14759 | Bijapur | Vijayapura | Basavanabagevadi | KN-07-23 | IMPROVEMENT To ROAD FROM Sasnur to Wadwadgi in B.Bagewadi Tq | 6.55 | 6.55 | S.M.Ullagadi | 22-06-2023 | 03-02-2025 | 592 | 11 |
| | 12491 | Chamrajnagar | Mysore | CR Nagar | KN-08-07 | Improvements to Road - MRL12-Road Junction near Megalahundi To Thammadahalli Via Halepura to 9.5 | 9.50 | 9.50 | | 25-08-2020 | 30-03-2022 | 582 | 16 |
| | 12492 | Chamrajnagar | Mysore | CR Nagar | KN-08-07 | Improvements to Road - MRL23-Nanjadevanapura to Kalanahundi via Govindavadi (Kalpura) to 6 | 6.00 | 6.00 | | 25-08-2020 | 30-03-2022 | 582 | 10 |
| | 12494 | Chamrajnagar | Mysore | CR Nagar | KN-08-08 | Improvements to Road - MRL01-Santhemarahalli ummathur MDR Road junction near Heggavadi to SH17 junction at Mariyaladahundi Bus stop to 3.42 | 3.42 | 3.42 | | 11-09-2020 | 27-03-2023 | 927 | 4 |
| | 12493 | Chamrajnagar | Mysore | CR Nagar | KN-08-08 | Improvements to Road - MRL04-Junction of Sappainapura and k. mukalli to NH at doddarayapete gate via bhogapura ,Kiragasur Kadahalli to 7.65 | 7.65 | 7.65 | | 11-09-2020 | 27-03-2023 | 927 | 8 |
| | 12496 | Chamrajnagar | Mysore | CR Nagar | KN-08-09 | Improvements to Road - MRL21-Yanagumba to Mdr Between Yaraganahalli -Arakalavadi to 4.6 | 4.60 | 4.60 | | 20-08-2020 | 04-07-2021 | 318 | 14 |
| | 12495 | Chamrajnagar | Mysore | CR Nagar | KN-08-09 | Improvements to Road - MRL19-MDR Junction Between Laxmipura and Badagalapura to uganehundi Via Sanegala to 5.34 | 5.34 | 5.34 | | 20-08-2020 | 04-07-2021 | 318 | 17 |
| | 12499 | Chamrajnagar | Mysore | Gundlupet | KN-08-10 | Improvements to Road - MRL05-Shindanapura to Kodasoge (via Mollayanahundi) to 9 | 9.00 | 9.00 | | 03-02-2021 | 30-07-2022 | 542 | 17 |
| | 12497 | Chamrajnagar | Mysore | Gundlupet | KN-08-10 | Improvements to Road - MRL03-Kamarahalli to Halladamadalli to 5.005 | 5.01 | 5.01 | | 03-02-2021 | 30-07-2022 | 542 | 9 |
| | 12500 | Chamrajnagar | Mysore | Gundlupet | KN-08-11 | Improvements to Road - MRL08-SH TO NH to 4.97 | 4.97 | 4.97 | | 19-08-2020 | 14-09-2022 | 756 | 7 |
| | 12498 | Chamrajnagar | Mysore | Gundlupet | KN-08-11 | Improvements to Road - MRL01-Heggaddahalla To NH 212 to 5.78 | 5.78 | 5.78 | | 19-08-2020 | 14-09-2022 | 756 | 8 |
| | 12501 | Chamrajnagar | Mysore | Gundlupet | KN-08-11 | Improvements to Road - MRL19-BM Road to Mookahally to 3.5 | 3.50 | 3.50 | | 19-08-2020 | 14-09-2022 | 756 | 5 |
| | 12505 | Chamrajnagar | Mysore | Kollegala | KN-08-12 | Improvements to Road - MRL08-Sathegala-Shivanasamudra main road to Shilubepura to 11.6 | 11.60 | 11.60 | | 05-09-2020 | 27-07-2022 | 690 | 17 |
| | 12502 | Chamrajnagar | Mysore | Kollegala | KN-08-12 | Improvements to Road - MRL06-MM Hills Main Road to Kothanoor main Road Via Ikkadalli, Mariyapura to 9.2 | 9.20 | 9.20 | | 05-09-2020 | 27-07-2022 | 690 | 13 |
| | 12504 | Chamrajnagar | Mysore | Kollegala | KN-08-13 | Improvements to Road - MRL03-Odeyarapalya to Hunasepalya via Kathekalpadu,Gundimala to 9.1 | 9.10 | 9.10 | | 11-09-2020 | 27-07-2022 | 684 | 13 |
| | 12503 | Chamrajnagar | Mysore | Kollegala | KN-08-13 | Improvements to Road - MRL05-Chikkamalapura to Lokkanahally Via Sirgodu to 4.08 | 4.08 | 4.08 | | 11-09-2020 | 27-07-2022 | 684 | 6 |
| | 12506 | Chamrajnagar | Mysore | Yelandur | KN-08-14 | Improvements to Road - MRL05-K.Devarahalli to Dasanahundi to 7.34 | 7.34 | 7.34 | | 28-09-2020 | 30-12-2021 | 458 | 16 |
| | 13571 | Chamrajnagar | Mysore | Gundlupet | KN-08-15 | IMPROVEMENT TO THE ROAD FROM TALUK BORDER TO SEEGEWADI CROSS VIA KABBALLI IN GUNDLUPET TALUK CHAMARAJANAGAR DISTRICT. (CH:0.00 TO 5.20 KM) TOTAL 5.20 KM | 5.20 | 5.20 | H S Girish | 13-09-2021 | 27-07-2022 | 317 | 16 |
| | 12253 | Chikmagalur | Chikmagalur | Tarikere | KN-09-07 | Improvements to Road - MRL12-Kortikere to Rangapura road Via Sokke Shanuboganahalli Kudlur to 10.89 | 10.89 | 10.89 | | 06-08-2020 | 31-03-2022 | 602 | 18 |
| | 12254 | Chikmagalur | Chikmagalur | Tarikere | KN-09-08 | Improvements to Road - MRL06-Gulladamane to Tarikere - Lingadahalli road Via Byrapura to 7.92 | 7.92 | 7.92 | | 28-07-2020 | 30-05-2022 | 671 | 12 |
| | 12255 | Chikmagalur | Chikmagalur | Tarikere | KN-09-09 | Improvements to Road - MRL08- Belenahally to Siddarahalli Via Jodikodihalli Duggalapura Seethapura kaval to 5.71 | 5.71 | 5.71 | | 06-08-2020 | 31-03-2022 | 602 | 9 |
| | 12256 | Chikmagalur | Chikmagalur | Tarikere | KN-09-10 | Improvements to Road - MRL07-Shivani RS to Bukkambudi - Shivani Road to 6.57 | 6.57 | 6.57 | | 05-08-2020 | 31-12-2021 | 513 | 13 |
| | 12257 | Chikmagalur | Chikmagalur | Tarikere | KN-09-11 | Improvements to Road - MRL19-Hosalli Tandya to Ajjampura - Bu to 11.07 | 11.07 | 11.07 | | 24-07-2020 | 31-01-2022 | 556 | 20 |
| | 12249 | Chikmagalur | Chikmagalur | Narasimharajapura | KN-09-12 | Improvements to Road - MRL11-Chinnakudige to Bangavani - Vagade Via Bettagere Kelakoppa to 5.5 | 5.50 | 5.50 | | 21-07-2020 | 21-06-2021 | 335 | 16 |
| | 12251 | Chikmagalur | Chikmagalur | Narasimharajapura | KN-09-13 | Improvements to Road - T05-BH Kaimara to Nagaramakki Via Edagere Hallibailu Gubbiga Kuguvally to 14.48 | 14.48 | 14.48 | | 21-07-2020 | 21-06-2021 | 335 | 43 |
| | 12250 | Chikmagalur | Chikmagalur | Narasimharajapura | KN-09-13 | Improvements to Road - MRL19-Bangavani to Kudregundi - Chikkagrahara Via Kasana Gundvani road to 6.3 | 6.30 | 6.30 | | 21-07-2020 | 31-12-2021 | 528 | 12 |
| | 12252 | Chikmagalur | Chikmagalur | Sringeri | KN-09-14 | Improvements to Road - MRL23-SH Meegina Kallu To Devalekoppa via Heggadde, Hosakoppa, Magalabailu, Hadlukopp to 8.71 | 8.71 | 8.71 | | 24-07-2020 | 30-05-2022 | 675 | 13 |
| | 12246 | Chikmagalur | Chikmagalur | Mudigere | KN-09-15 | Improvements to Road - MRL33-Kalasa to Nooji via SK Megal to 11.225 | 11.23 | 11.23 | | 01-09-2020 | 30-06-2022 | 667 | 17 |
| | 12247 | Chikmagalur | Chikmagalur | Mudigere | KN-09-16 | Improvements to Road - MRL20-Bettadamane Devarunda road MDR to Kirugunda via Kajjehalli to 9.7 | 9.70 | 9.70 | | 16-02-2021 | 17-07-2023 | 881 | 11 |
| | 12248 | Chikmagalur | Chikmagalur | Mudigere | KN-09-17 | Improvements to Road - MRL34-Bankenahalli to Phalguni via Kudihalli and Yerkal to 8.6 | 8.60 | 8.60 | | 19-10-2020 | 30-03-2022 | 527 | 16 |
| | 12242 | Chikmagalur | Chikmagalur | Kadur | KN-09-18 | Improvements to Road - MRL01-Singatagere To Keresanthe to 7.6 | 7.60 | 7.60 | | 28-07-2020 | 30-11-2021 | 490 | 16 |
| | 12243 | Chikmagalur | Chikmagalur | Kadur | KN-09-19 | Improvements to Road - MRL16-Channapura Giribommanahalli MDR to Sokke Peelapura SH via Hadagalu to 8.6 | 8.60 | 8.60 | | 16-07-2020 | 30-11-2021 | 502 | 17 |
| | 12244 | Chikmagalur | Chikmagalur | Kadur | KN-09-20 | Improvements to Road - MRL03-Devanur to NH-206 via Lakshmisagara to 6.3 | 6.30 | 6.30 | | 26-08-2020 | 15-12-2022 | 841 | 7 |
| | 12245 | Chikmagalur | Chikmagalur | Kadur | KN-09-21 | Improvements to Road - T04-Tarikere taluk border to Arehalli via Asandi to 12 | 12.00 | 12.00 | | 24-07-2020 | 30-09-2021 | 433 | 28 |
| | 12238 | Chikmagalur | Chikmagalur | Chickmagalur | KN-09-22 | Improvements to Road - MRL07-Bypass NH to B T road Malledevarahalli MDR via Nettekerehalli to 5.49 | 5.49 | 5.49 | | 26-08-2020 | 15-12-2022 | 841 | 7 |
| | 12239 | Chikmagalur | Chikmagalur | Chickmagalur | KN-09-23 | Improvements to Road - T05-Hiremagalur to Belur Taluk border to 3.48 | 3.48 | 3.48 | | 01-09-2020 | 31-03-2022 | 576 | 6 |
| | 12240 | Chikmagalur | Chikmagalur | Chickmagalur | KN-09-24 | Improvements to Road - MRL20-Amble to Thiruguna via Kadrimidri to 10.97 | 10.97 | 10.97 | | 03-08-2020 | 31-01-2023 | 911 | 12 |
| | 12241 | Chikmagalur | Chikmagalur | Chickmagalur | KN-09-25 | Improvements to Road - MRL25-Hukkunda to K M road via Yarehalli to 7.52 | 7.52 | 7.52 | | 01-09-2020 | 31-03-2022 | 576 | 13 |
| | 13299 | Chikmagalur | Chikmagalur | Sringeri | KN-09-26 | Improvements to Road - MRL07-Nemmar-Thekkur MDR To Mavinakadu Via Bukadibylu , Valale to | 3.92 | 3.92 | M R RUSHYASHRINGA HEGDE | 28-06-2021 | 31-12-2023 | 916 | 4 |
| | 13298 | Chikmagalur | Chikmagalur | Sringeri | KN-09-26 | Improvements to Road - MRL14-Kigga to Chattemane Via Sindodi Sirimane Keredande Gaddemane to | 4.80 | 4.80 | M R RUSHYASHRINGA HEGDE | 28-06-2021 | 27-05-2022 | 333 | 14 |
| | 13608 | Chikmagalur | Chikmagalur | Sringeri | KN-09-27 | Construction of Long Span Bridge at ch. 2.46 k.m. in SH Meeginakallu to Devalekoppa in sringeri Taluk | 0.02 | 0.02 | M.R. Rushyashringa Hegde | 28-06-2021 | 06-02-2023 | 588 | 0 |
| | 13606 | Chikmagalur | Chikmagalur | Sringeri | KN-09-27 | Construction of Long Span Bridge at ch. 5.98 k.m in SH Meeginakallu to Devalekoppa in Sringeri Taluk | 0.02 | 0.02 | M. R Rushyashringa hegde | 28-06-2021 | 06-06-2023 | 708 | 0 |
| | 13293 | Chikmagalur | Chikmagalur | Koppa | KN-09-28 | Improvements to Road - MRL43-Koppa - Narve MDR to Markadle Via Hulugaru Gabbani to | 7.95 | 7.95 | K J RAMAREDDY | 28-06-2021 | 06-12-2022 | 526 | 15 |
| | 13295 | Chikmagalur | Chikmagalur | Koppa | KN-09-28 | Improvements to Road - MRL25-Herthanakodige to Berkanabailu Via Bettadakumbri to | 5.00 | 5.00 | K J RAMAREDDY | 28-06-2021 | 31-03-2023 | 641 | 8 |
| | 13294 | Chikmagalur | Chikmagalur | Koppa | KN-09-28 | Improvements to Road - MRL42-Amdi to Koppa kesave MDR via Kusgoli Golgaru to | 7.01 | 7.01 | K J RAMAREDDY | 28-06-2021 | 20-02-2023 | 602 | 12 |
| | 13292 | Chikmagalur | Chikmagalur | Koppa | KN-09-28 | Improvements to Road - MRL44-Kalanayakanakatte to Horabailu Via Yedathalu to | 4.90 | 4.90 | K J RAMAREDDY | 28-06-2021 | 20-02-2023 | 602 | 8 |
| | 13302 | Chikmagalur | Chikmagalur | Koppa | KN-09-28 | Construction of Long span bridge - Construction of New Long Span RCC Bridge at ch.6.69 km in Amdi to Koppa kesave MDR via Kusgoli to | 23.00 | 23.00 | K J RAMAREDDY | 28-06-2021 | 02-12-2022 | 522 | 44 |
| | 13306 | Chikmagalur | Chikmagalur | Tarikere | KN-09-29 | Construction of Long span bridge - Construction of LSB at ch.11.30km in Kortikere to Rangapura to 35.4 | 35.40 | 35.40 | HALAPPA C | 17-07-2021 | 16-04-2022 | 273 | 130 |
| | 13612 | Chikmagalur | Chikmagalur | Tarikere | KN-09-30 | Construction of Long Span Bridge at CH:1.41k.m. in Gulladamane to Tarikere-Lingadahalli road LSB Length:24mtrs | 0.02 | 0.02 | C.HALAPPA | 08-10-2021 | 17-01-2023 | 466 | 0 |
| | 13307 | Chikmagalur | Chikmagalur | Tarikere | KN-09-31 | Construction of Long span bridge - Construction of LSB at ch. 4.25km in Belenahally to Siddarahalli to 50 | 50.00 | 50.00 | M/s NEEL CONSTRUCTIONS | 13-07-2021 | 14-07-2023 | 731 | 68 |
| | 13611 | Chikmagalur | Chikmagalur | Tarikere | KN-09-32 | Construction of Long Span Bridge at Ch.3.085k.m. Shivani RS TO Bukkumbudi-Shivani road LSB Length:27.50 | 0.03 | 0.03 | C.HALAPPA | 08-10-2021 | 17-01-2023 | 466 | 0 |
| | 13291 | Chikmagalur | Chikmagalur | Kadur | KN-09-33 | Improvements to Road - T01-Garje to Tarikere Taluk Border via Hulihalli to 5.3 | 5.30 | 5.30 | HALAPPA C | 30-09-2021 | 26-12-2022 | 452 | 12 |
| | 13296 | Chikmagalur | Chikmagalur | Mudigere | KN-09-34 | Improvements to Road - MRL17-Samse to SH-106 near Channahadlu to 8.8 | 8.80 | 8.80 | ANTONY PS | 30-09-2021 | 31-03-2024 | 913 | 10 |
| | 13300 | Chikmagalur | Chikmagalur | Chickmagalur | KN-09-36 | Construction of Long span bridge - Construction of Long Span Bridge near Lakshmipura village at chainage 0.56 KM to 18.2 | 18.20 | 18.20 | M/s CONC SHADE CONSTRUCTION PRIVITE LTD | 16-08-2021 | 31-03-2023 | 592 | 31 |
| | 13301 | Chikmagalur | Chikmagalur | Kadur | KN-09-37 | Construction of Long span bridge - Construction of Long Span Bridge near Asandi Village in Kadur taluk to 60.2 | 60.20 | 60.20 | M/s S L V CONSTRUCTIONS | 04-07-2022 | 30-06-2023 | 361 | 167 |
| | 13303 | Chikmagalur | Chikmagalur | Mudigere | KN-09-38 | Construction of Long span bridge - Construction of Long span Bridge Bridge Across the Hemavathi river near Bankenahalli to 59.74 | 59.74 | 59.74 | M/s RASHMI CONSTRUCTIONS | 13-10-2021 | 31-03-2023 | 534 | 112 |
| | 13304 | Chikmagalur | Chikmagalur | Mudigere | KN-09-39 | Construction of Long span bridge - Construction of Long Span Bridge Across Hemavathi river near Palguni to 39.82 | 39.82 | 39.82 | DEVARAJA L C | 17-07-2021 | 30-04-2022 | 287 | 139 |
| | 14811 | Chikmagalur | Chikmagalur | Mudigere | KN09-40 (KN-09-68B) | Construction of Long Span Bridge Across the Bhadra River near Kolumage in Mudigere Taluk | 70.04 | 70.04 | M/S Rashmi Constructions (DR Raju ) Karkala | 16-08-2023 | 15-03-2026 | 942 | 74 |
| | 13305 | Chikmagalur | Chikmagalur | Mudigere | KN-09-41 | Construction of Long span bridge - Construction of Long span bridge across the Bhadra river at chainage 1.5 km near Kotehole to 102.52 | 102.52 | 102.52 | VIRENDRA NARAYAN SHETTY | 13-10-2021 | 31-12-2024 | 1175 | 87 |
| | 13297 | Chikmagalur | Chikmagalur | Sringeri | KN-09-42 | Improvements to Road - T02-Masige-Halandoor MDR to Kelakoppa taluk border via Menase, Megalabailu, Thimmanejaddu to | 7.60 | 7.60 | M R RUSHYASHRINGA HEGDE | 28-06-2021 | 03-06-2023 | 705 | 11 |
| | 14160 | Chikmagalur | Chikmagalur | Chickmagalur | KN09-62B | Construction of Long Span Bridge in Undadihalli at ch 1.705 km in Chikmagalur Taluk, GOI Pkg:KN09-62B | 0.04 | 0.04 | Devaraja L.C | 27-07-2022 | 26-10-2023 | 456 | 0 |
| | 14161 | Chikmagalur | Chikmagalur | Kadur | KN09-66A | Construction of Long Span Bridge near Asandi Village GOI Pkg No.KN09-66A | 0.06 | 0.06 | G.M.PRAKASH | 04-07-2022 | 30-06-2023 | 361 | 0 |
| | 12452 | Chitradurga | Chitradurga | Challakere | KN-10-09 | Improvements to Road - MRL18-Somaguddu to Budnahatti via Imampura, Gorlakatte, Veeradimmanahalli, Budnahatti Lambanihatti to 10.6 | 10.60 | 10.60 | | 26-08-2020 | 31-03-2022 | 582 | 18 |
| | 12453 | Chitradurga | Chitradurga | Challakere | KN-10-10 | Improvements to Road - MRL19-Maradihatti to Andra border via Kyadigunte, Siddeshwaranadurga, Siddeshwaranadurga gollarahatti to 5.23 | 5.23 | 5.23 | | 28-08-2020 | 31-03-2022 | 580 | 9 |
| | 12454 | Chitradurga | Chitradurga | Challakere | KN-10-10 | Improvements to Road - MRL26-Siddapura to Somaguddu via Laxmipura to 3.21 | 3.21 | 3.21 | | 28-08-2020 | 31-03-2022 | 580 | 6 |
| | 12455 | Chitradurga | Chitradurga | Hiriyur | KN-10-11 | Improvements to Road - MRL11-NH-4 to Beerenahalli via Yaradakatte, Metikurke, Sooragondanahalli, Tavandi, Katanahatti to 13.15 | 13.15 | 13.15 | | 24-08-2020 | 31-03-2022 | 584 | 23 |
| | 12456 | Chitradurga | Chitradurga | Holalkere | KN-10-12 | Improvements to Road - MRL17-Andanur Gollarahatti to Ganjigatte Lambanihatti via Andanur, Ingaladahalli, Bandebommenahalli, B.B. Halli Vaddarhatty, Ganjigatte to 6.25 | 6.25 | 6.25 | | 23-09-2020 | 31-03-2022 | 554 | 11 |
| | 12457 | Chitradurga | Chitradurga | Holalkere | KN-10-12 | Improvements to Road - MRL25-Shivaganga to Thodaranahal via Chitrahalli to 3.85 | 3.85 | 3.85 | | 23-09-2020 | 31-03-2022 | 554 | 7 |
| | 12458 | Chitradurga | Chitradurga | Holalkere | KN-10-12 | Improvements to Road - MRL20-Talya to NH-13 (Kudineerakatte) via Sirapanahalli, Hunasepanche, Sihineerakatte, Kudineerakatte to 5.82 | 5.82 | 5.82 | | 23-09-2020 | 31-03-2022 | 554 | 11 |
| | 12459 | Chitradurga | Chitradurga | Hosadurga | KN-10-13 | Improvements to Road - MRL29-Ahamad Nagara to Kondajji vai Adrikatte, Marabhagatta to 6.35 | 6.35 | 6.35 | | 21-08-2020 | 31-12-2022 | 862 | 7 |
| | 12460 | Chitradurga | Chitradurga | Hosadurga | KN-10-13 | Improvements to Road - MRL20-Jankal-Akkithimmaiahnahatty (MDR) to Sodarnal via Devapura, Honnenahalli, Hunavinadu to 4.5 | 4.50 | 4.50 | | 21-08-2020 | 31-12-2022 | 862 | 5 |
| | 12461 | Chitradurga | Chitradurga | Molakalmur | KN-10-14 | Improvements to Road - MRL11-Chikumthi to Yarapothajogihalli via Tumakurlahalli to 5.82 | 5.82 | 5.82 | | 21-08-2020 | 31-01-2022 | 528 | 11 |
| | 12451 | Chitradurga | Chitradurga | Molakalmur | KN-10-14 | Improvements to Road - MRL05-Tumkurlahalli to Kondlahalli via Marammanahalli to 4.85 | 4.85 | 4.85 | | 21-08-2020 | 31-01-2022 | 528 | 9 |
| | 13100 | Chitradurga | Chitradurga | Challakere | KN-10-15 | Improvements to Road - MRL03-Narayanapura-Gorlathu road to Hottejjanakapile via Belegere, Badavanahalli Kaval , Kaparahalli, Heggere to 9.85 | 9.85 | 9.85 | MANJUNATH D H | 23-07-2021 | 13-01-2023 | 539 | 18 |
| | 13102 | Chitradurga | Chitradurga | Chitradurga | KN-10-16 | Improvements to Road - MRL28-Neelaiahnahatti to Sirigere via Alaghatta, Dyamenahalli to 7.38 | 7.38 | 7.38 | K Anwar Basha(K A CONSTRUCTIONS PVT LTD) | 18-08-2021 | 17-12-2022 | 486 | 15 |
| | 13103 | Chitradurga | Chitradurga | Chitradurga | KN-10-16 | Improvements to Road - MRL37-Sollapura to Seebara road via Siddapura, Eachalanagenahalli to 4.9 | 4.90 | 4.90 | K Anwar Basha(K A CONSTRUCTIONS PVT LTD) | 18-08-2021 | 17-12-2022 | 486 | 10 |
| | 13104 | Chitradurga | Chitradurga | Chitradurga | KN-10-17 | Improvements to Road - MRL61-NH-13 to mallapura gollarahatti via Gonur Muthaiahnahatti to 4.94 | 4.94 | 4.94 | M B Vijayendra | 05-08-2021 | 04-07-2022 | 333 | 15 |
| | 13101 | Chitradurga | Chitradurga | Chitradurga | KN-10-17 | Improvements to Road - MRL21-G.R.Halli to NH-4 via Medehalli to 5.94 | 5.94 | 5.94 | M B Vijayendra | 05-08-2021 | 04-07-2022 | 333 | 18 |
| | 13352 | Chitradurga | Chitradurga | Chitradurga | KN-10-18 | Improvements to Road - MRL07-V.S.Halli toTurebailu via Alaghatta Konanuru Bommavvanagathihalli, Megalahalli to 5.04 | 5.04 | 5.04 | M/s SAPTHAGIRI AND CO | 12-01-2022 | 31-12-2022 | 353 | 14 |
| | 13353 | Chitradurga | Chitradurga | Chitradurga | KN-10-18 | V.S. Halli to Turebailu via Alaghatta, Konanuru, Bommavvanagathihalli, Megalahalli | 5.04 | 5.04 | Sreeramachandra. A. (Sapthagiri & Co), Class I Contractor, Davanagere | 12-01-2022 | 11-10-2022 | 272 | 19 |
| | 13105 | Chitradurga | Chitradurga | Hiriyur | KN-10-19 | Improvements to Road - MRL01-Chillahalli to Hulithotlu via V.K.Gudda, Sakkara, Darampura, New Aralikere, Betagondanahalli, Khanajanahalli, Mungusavalli, Gulya, Bidarakere, Marenahalli, Harthikote, Mudiyajjanakottige, Guilalu to 15.9 | 15.90 | 15.90 | D Narayana Reddy ( SWARNA CONSTRUCTIONS ) | 02-08-2021 | 31-12-2022 | 516 | 31 |
| | 13107 | Chitradurga | Chitradurga | Holalkere | KN-10-20 | Improvements to Road - MRL04-Kotehal to Kallavvanagathihalli via Chikkajajur, Channapatna, Apparasanahalli, Chikkandawadi to 3.68 | 3.68 | 3.68 | ERAPPA UDAMAKAL | 08-10-2021 | 31-01-2024 | 845 | 4 |
| | 13106 | Chitradurga | Chitradurga | Holalkere | KN-10-20 | Improvements to Road - MRL11-SH Hally Gollarahatti-Rangavvanahalli road cross to Kalagatta via B. Durga to 6.35 | 6.35 | 6.35 | ERAPPA UDAMAKAL | 08-10-2021 | 31-01-2024 | 845 | 8 |
| | 13108 | Chitradurga | Chitradurga | Hosadurga | KN-10-21 | Improvements to Road - MRL21-Hosamalli to Sannehalli via Kondajji Lambanihatti, Neeragunda gate to 4.7 | 4.70 | 4.70 | HALAPPA C | 12-07-2021 | 31-03-2023 | 627 | 7 |
| | 13110 | Chitradurga | Chitradurga | Hosadurga | KN-10-21 | Improvements to Road - MRL50-Peelapura to Shettihalli via Neeragunda to 3.1 | 3.10 | 3.10 | HALAPPA C | 12-07-2021 | 31-03-2023 | 627 | 5 |
| | 13109 | Chitradurga | Chitradurga | Hosadurga | KN-10-22 | Improvements to Road - MRL25-Kamsagara to Sevanagara via Jankal, Banasihalli, Thanigekal to 7.68 | 7.68 | 7.68 | M/S RAM AND COMPANY (C R GIRISH) | 28-06-2021 | 31-05-2023 | 702 | 11 |
| | 13111 | Chitradurga | Chitradurga | Hosadurga | KN-10-22 | Improvements to Road - MRL36-Kondapura gate to Taluk Boarder via Hebballi and Nagarakatte to 4.1 | 4.10 | 4.10 | M/S RAM AND COMPANY (C R GIRISH) | 28-06-2021 | 31-05-2023 | 702 | 6 |
| | 13112 | Chitradurga | Chitradurga | Molakalmur | KN-10-23 | Improvements to Road - MRL01-NH-150 A to Santhegudda via Devasamudra, Thimmalapura, Karadihalli, Kanakuppe, Bommadevarahalli, Megalakanive to 8.27 | 8.27 | 8.27 | K KHALEELUR RAHAMAN | 20-04-2021 | 19-03-2022 | 333 | 25 |
| | 13113 | Chitradurga | Chitradurga | Molakalmur | KN-10-24 | Improvements to Road - MRL02-Chowdipura to Marlahalli via Kondlahalli, Netranahalli, Belevinamaradahatti, Nerlahalli, Gundluru, Kuntobaiahnahatti, Muddaiahanahatti to 6.72 | 6.72 | 6.72 | K KHALEELUR RAHAMAN | 19-04-2021 | 31-12-2022 | 621 | 11 |
| | 12140 | Dakshina Kannada | Mangalore | Bantwal | KN-11-11 | Improvements to Road - MRL05-Kanyana to Nekkarekadu ST Colony to 6.13 | 6.13 | 6.13 | | 20-07-2020 | 30-09-2021 | 437 | 14 |
| | 12141 | Dakshina Kannada | Mangalore | Bantwal | KN-11-12 | Improvements to Road - MRL01-Golthamajalu to Manchikatte Road (SH) to 11.16 | 11.16 | 11.16 | | 06-08-2020 | 30-09-2021 | 420 | 27 |
| | 12142 | Dakshina Kannada | Mangalore | Bantwal | KN-11-13 | Improvements to Road - MRL03-Ira Thalithabettu To Cheluru to 6.825 | 6.82 | 6.82 | | 15-07-2020 | 04-01-2022 | 538 | 13 |
| | 12263 | Dakshina Kannada | Mangalore | Bantwal | KN-11-14 | Improvements to Road - MRL02-Bolpade to Madara mule to 9.62 | 9.62 | 9.62 | | 20-07-2020 | 30-09-2021 | 437 | 22 |
| | 12264 | Dakshina Kannada | Mangalore | Belthangadi | KN-11-15 | Improvements to Road - MRL10-Parappu to Adrupral Road to 5.05 | 5.05 | 5.05 | | 22-07-2020 | 30-09-2021 | 435 | 12 |
| | 12265 | Dakshina Kannada | Mangalore | Belthangadi | KN-11-16 | Improvements to Road - MRL07-MDR Bejadaddi to Parpikallu to 10.465 | 10.47 | 10.47 | | 01-08-2020 | 04-01-2022 | 521 | 20 |
| | 12266 | Dakshina Kannada | Mangalore | Belthangadi | KN-11-17 | Improvements to Road - MRL03- Laila to Kotikatte Road to 7.45 | 7.45 | 7.45 | | 20-07-2020 | 04-01-2022 | 533 | 14 |
| | 12267 | Dakshina Kannada | Mangalore | Belthangadi | KN-11-18 | Improvements to Road - T02- Ujire - Kuppetti Road to 24.75 | 24.75 | 24.75 | | 01-08-2020 | 04-01-2022 | 521 | 48 |
| | 12268 | Dakshina Kannada | Mangalore | Mangalore | KN-11-19 | Improvements to Road - MRL17-Munchigudde to Niddodi Road to 5.4 | 5.40 | 5.40 | | 20-07-2020 | 30-09-2021 | 437 | 12 |
| | 12269 | Dakshina Kannada | Mangalore | Puttur | KN-11-20 | Improvements to Road - MRL04-BAREPADY-PALLATHARU-KUNKYA(PERUVAJE) to 6.52 | 6.52 | 6.52 | | 16-07-2020 | 03-01-2022 | 536 | 12 |
| | 12270 | Dakshina Kannada | Mangalore | Puttur | KN-11-21 | Improvements to Road - MRL18-KAKKUR-ANADKA-KARNAPADY to 7.19 | 7.19 | 7.19 | | 20-07-2020 | 03-01-2022 | 532 | 14 |
| | 12271 | Dakshina Kannada | Mangalore | Sulya | KN-11-22 | Improvements to Road - MRL18-PERAL-AJJAVRA-NARKODU to 6.75 | 6.75 | 6.75 | | 22-07-2020 | 31-12-2021 | 527 | 13 |
| | 12945 | Dakshina Kannada | Mangalore | Mangalore | KN-11-23 | Improvements to Road - MRL02-Kayarpundu to Kesaragadde (NH) to 5.01 | 5.01 | 5.01 | SURESH R SHETTY | 28-06-2021 | 31-12-2022 | 551 | 9 |
| | 12946 | Dakshina Kannada | Mangalore | Puttur | KN-11-24 | Improvements to Road - MRL06-ISHWARAMANGALA -SULIAPADAVU to 5.46 | 5.46 | 5.46 | B HARISH KUMAR | 24-05-2021 | 30-12-2022 | 585 | 9 |
| | 12947 | Dakshina Kannada | Mangalore | Puttur | KN-11-25 | Improvements to Road - MRL22-ISHWARAMANGALA -KATTAKANA(MAINDHANADKA)-DODDAKANA-KUKKUPUNI to 8.85 | 8.85 | 8.85 | K M GIRISH KUMAR | 03-07-2021 | 30-12-2022 | 545 | 16 |
| | 12948 | Dakshina Kannada | Mangalore | Sulya | KN-11-26 | Improvements to Road - MRL15-SULLIA-ALETTY-KOTEKAL-ELIKKALA to 7.225 | 7.22 | 7.22 | M/s ASSMAS CONSTRUCTIONS PVT LTD | 08-06-2021 | 30-12-2022 | 570 | 13 |
| | 12949 | Dakshina Kannada | Mangalore | Sulya | KN-11-27 | Improvements to Road - MRL23-BOGAYANAKERE-ENNEMAJALU-BEDIGUDDE TO ADDABAILU(SH) to 9.7 | 9.70 | 9.70 | V V BALAN | 07-06-2021 | 30-12-2022 | 571 | 17 |
| | 12941 | Dakshina Kannada | Mangalore | Puttur | KN-11-28 | Improvements to Road - MRL10-MURA-YALMUNJA-BERIKE to | 8.00 | 8.00 | S PREMANATH | 18-05-2021 | 30-12-2022 | 591 | 14 |
| | 12942 | Dakshina Kannada | Mangalore | Puttur | KN-11-29 | Improvements to Road - MRL12-ITHOOR-ANTHIBETTU-BAJAKERE-KODIMBALA to 8.58 | 8.58 | 8.58 | M/S PAVITHRA ENGINEERING AND CONSTRUCTIONS | 07-06-2021 | 30-12-2022 | 571 | 15 |
| | 12943 | Dakshina Kannada | Mangalore | Puttur | KN-11-30 | Improvements to Road - MRL09-PANJALA-PURSHARAKATTE-SHANTHIGODU to 7.7 | 7.70 | 7.70 | B S SATHISH KUMAR | 07-06-2021 | 30-12-2022 | 571 | 13 |
| | 12944 | Dakshina Kannada | Mangalore | Sulya | KN-11-31 | Improvements to Road - MRL02-AJJANAGADDE-KUKKUJADKA-PAILAR-JABALE to | 4.76 | 4.76 | VASANTH NAIK | 13-07-2021 | 30-12-2022 | 535 | 9 |
| | 12950 | Dakshina Kannada | Mangalore | Bantwal | KN-11-32 | Construction of Long span bridge - Construction of New Long Span RCC Bridge of Kanyana to Nekkarekadu ST Colony Road at ch2.45 Km to | 17.80 | 17.80 | M/s USK CONSTRUCTION COMPANY DP | 01-07-2021 | 09-03-2023 | 616 | 29 |
| | 12951 | Dakshina Kannada | Mangalore | Bantwal | KN-11-32 | Construction of Long span bridge - Construction of New Long Span RCC Bridge of Ira Thalithabettu To Cheluru Road at ch 6.30Km to | 19.00 | 19.00 | M/s USK CONSTRUCTION COMPANY DP | 01-07-2021 | 09-03-2023 | 616 | 31 |
| | 12954 | Dakshina Kannada | Mangalore | Belthangadi | KN-11-33 | Construction of Long span bridge - Construction of New LSB of MDR Bejadaddi to Parpikallu Road at Ch 4.660Km to | 16.00 | 16.00 | M/s MUGRODY CONSTRUCTIONS | 10-05-2021 | 10-02-2022 | 276 | 58 |
| | 12953 | Dakshina Kannada | Mangalore | Belthangadi | KN-11-33 | Construction of Long span bridge - Construction of New LSB of MDR Bejadaddi to Parpikallu Road at Ch 2.440Km to 31 | 31.00 | 31.00 | M/s MUGRODY CONSTRUCTIONS | 10-05-2021 | 09-01-2023 | 609 | 51 |
| | 12952 | Dakshina Kannada | Mangalore | Belthangadi | KN-11-34 | Construction of Long span bridge - Construction of New LSB of Laila to Kotikatte Road at ch 1.310Km to | 67.00 | 67.00 | M/s RASHMI CONSTRUCTIONS | 18-05-2021 | 10-01-2023 | 602 | 111 |
| | 12955 | Dakshina Kannada | Mangalore | Puttur | KN-11-35 | Construction of Long span bridge - Ithoor-Anthibettu-Bajakere-Kodimbala Bridge to | 19.00 | 19.00 | K M NAGESH KUMAR | 04-05-2021 | 06-07-2022 | 428 | 44 |
| | 12956 | Dakshina Kannada | Mangalore | Sulya | KN-11-36 | Construction of Long span bridge - Ajjanagadde-Kukkujadka-Pailar-Jabale Bridge to | 19.00 | 19.00 | H RAJEEVA SHETTY | 08-06-2021 | 08-03-2022 | 273 | 70 |
| | 12156 | Davanagere | Davanagere | Chennagiri | KN-12-08 | Improvements to Road - T05-SH near Chikkulikere to MDR near Gulihalli via Ajjihalli, Mudigere, Thimalapura to 4.315 | 4.32 | 4.32 | | 31-07-2020 | 15-11-2022 | 837 | 5 |
| | 12157 | Davanagere | Davanagere | Chennagiri | KN-12-08 | Improvements to Road - T01-SH near Honnebagi to Joldhal via Gandhinagara, Malligere, Hanumanthanagara, Shivajinagara, Hosahalli to 3.864 | 3.86 | 3.86 | | 31-07-2020 | 15-11-2022 | 837 | 5 |
| | 12158 | Davanagere | Davanagere | Chennagiri | KN-12-08 | Improvements to Road - T03-MDR near Agarbannihatti to MDR near Kondadahalli via Hosabannihatti, Bulsagara, Kagathur, Ramagondanahalli to 12.26 | 12.26 | 12.26 | | 31-07-2020 | 01-06-2023 | 1035 | 12 |
| | 12160 | Davanagere | Davanagere | Davanagere | KN-12-09 | Improvements to Road - T17-Turchagatta to Anagodu via Chandrnahalli,Kurki, Bullapura to 7.3 | 7.30 | 7.30 | | 27-07-2020 | 29-05-2023 | 1036 | 7 |
| | 12172 | Davanagere | Davanagere | Davanagere | KN-12-10 | Construction of Long span bridge - Construction of Box Culvert across Sagale Halla on Kandagallu to Mayakonda Road at 1.02 km to | 83.00 | 83.00 | | 24-07-2020 | 31-08-2022 | 768 | 108 |
| | 12159 | Davanagere | Davanagere | Davanagere | KN-12-10 | Improvements to Road - T18-Mayakonda to Kandgal via kabbur ,kalur attigere and gopnal,kashipura,mallakere to 22.62 | 22.62 | 22.62 | | 24-07-2020 | 29-12-2022 | 888 | 25 |
| | 12161 | Davanagere | Davanagere | Harapanahalli | KN-12-11 | Improvements to Road - T12-Chirastahalli to Ittigudi Via G Dadapura ,Alagilwada to 10.3 | 10.30 | 10.30 | | 31-07-2020 | 27-02-2022 | 576 | 18 |
| | 12163 | Davanagere | Davanagere | Harihara | KN-12-13 | Improvements to Road - T09-SH-25 to NH 4 via Mahajenahally,Hanagavadi,Belludi,Bannikodu,Satyanarayana camp,Hale kundwada to 13.552 | 13.55 | 13.55 | | 31-07-2020 | 29-07-2022 | 728 | 19 |
| | 12164 | Davanagere | Davanagere | Harihara | KN-12-14 | Improvements to Road - T01-MDR(Govinahole) to SH25(Hospet shimoga Road) Via G T Katte, Kokkanur camp Vaderabasapura camp,Dibbadahalli,Komaranahalli,Chikkamukthenahalli, Koppa to 12.935 | 12.94 | 12.94 | | 27-07-2020 | 29-10-2022 | 824 | 16 |
| | 12167 | Davanagere | Davanagere | Honnali | KN-12-15 | Improvements to Road - T02-Surahonne to Mussenahal via Kudrekonda,salabalu,ganjinahalli,Chatnihalli,Yeramada camp to 5.675 | 5.68 | 5.68 | | 31-07-2020 | 29-10-2022 | 820 | 7 |
| | 12166 | Davanagere | Davanagere | Honnali | KN-12-15 | Improvements to Road - T07-Haralahalli to Nelahonne Thanda via Bannikodu,Kulambi,Yarehalli,Kundur,Nelahonne Andhra Camp,Nelahonne to 11.65 | 11.65 | 11.65 | | 31-07-2020 | 28-02-2023 | 942 | 12 |
| | 12168 | Davanagere | Davanagere | Honnali | KN-12-16 | Improvements to Road - T03-Hirematha to Holemadapura via Malldevarakatte ,Sunkadakatte,diddaguru,Bidaragadde to 7.438 | 7.44 | 7.44 | | 27-07-2020 | 29-09-2022 | 794 | 9 |
| | 12165 | Davanagere | Davanagere | Honnali | KN-12-16 | Improvements to Road - T04-KK Road to Kanchugaranahalli via Mavinakote,Hanumanahalli,Channenahalli to 9.045 | 9.05 | 9.05 | | 27-07-2020 | 29-09-2022 | 794 | 11 |
| | 12169 | Davanagere | Davanagere | Jagalur | KN-12-17 | Improvements to Road - MRL06-Kasturipura to Petekanakuppr-chikkamanahatti road via kasturipura, Bullane halli ,Rasthemachikere , Giddanakatte,Kanakuppe to 10.78 | 10.78 | 10.78 | | 13-08-2020 | 30-09-2022 | 778 | 14 |
| | 12170 | Davanagere | Davanagere | Jagalur | KN-12-18 | Improvements to Road - T20-Rangapura to Donnehalli via Hanumantha pura ,Goguddu,Hosakannakatte,Kannakatte,Bangarakkanagudda,Siddamanahalli,Hosahatti, to 11.67 | 11.67 | 11.67 | | 27-07-2020 | 30-08-2022 | 764 | 15 |
| | 12171 | Davanagere | Davanagere | Jagalur | KN-12-18 | Improvements to Road - T10-Asagodu to Gode via A.Vadarahatti,Diddigi,Urlakatte,Tarehalli to 5.64 | 5.64 | 5.64 | | 27-07-2020 | 30-08-2022 | 764 | 7 |
| | 13410 | Davanagere | Davanagere | Chennagiri | KN-12-19 | T06-Thippagondanahalli to MDR near Veerapura via Vadnal,Kallattithada,Malahal-Gollarahatti,Malahal,Beedugondanahalli DoddaThanda,Beedugondanahalli SannaThanda, GangagondanahalliThanda,Kalkere,Hanumallapura | 3.88 | 3.88 | Parasappa Halappa | 30-06-2021 | 30-09-2022 | 457 | 8 |
| | 13411 | Davanagere | Davanagere | Chennagiri | KN-12-19 | T14-SH near Devarahalli to MDR near Chikkuda | 5.59 | 5.59 | Parasappa Halappa | 30-06-2021 | 30-09-2022 | 457 | 12 |
| | 13601 | Davanagere | Davanagere | Honnali | KN-12-20 | T13-Anjaneyapura to Neralagundi via Hunasehalli, Basavapura | 7.91 | 7.91 | Sri Ravi Siddappa, (SR Constructions) | 22-04-2021 | 29-12-2022 | 616 | 13 |
| | 12350 | Dharwad | Dharwad | Dharwad | KN-13-05 | Improvements to Road - MRL02-Mangudi to Nigadi via Benkanakatti to 5.66 | 5.66 | 5.66 | | 07-07-2020 | 06-06-2021 | 334 | 17 |
| | 12351 | Dharwad | Dharwad | Dharwad | KN-13-06 | Improvements to Road - MRL04-NH Near Heggeri to MDR Tadkod-Garag via Belur-kotur-Singanahalli- Bogur-Dubbanamaradi to 12.54 | 12.54 | 12.54 | | 04-08-2020 | 31-03-2022 | 604 | 21 |
| | 12362 | Dharwad | Dharwad | Dharwad | KN-13-06 | Construction of Long span bridge - Construction of box culvert at Ch 5.34 km in MRL-04 NH Near Heggeri to MDR Tadkod-Garag via Belur-ko to 32.75 | 32.75 | 32.75 | | 04-08-2020 | 31-03-2022 | 604 | 54 |
| | 12353 | Dharwad | Dharwad | Hubli | KN-13-07 | Improvements to Road - MRL07-NH near Varur to NH-4 near Agadi via Aralikatti to 7.62 | 7.62 | 7.62 | | 04-01-2021 | 15-03-2023 | 800 | 10 |
| | 12356 | Dharwad | Dharwad | Kalghatgi | KN-13-08 | Improvements to Road - MRL19-Dhulikoppa to Hullambi-Hesarambi MDR to 4.97 | 4.97 | 4.97 | | 24-06-2020 | 31-12-2021 | 555 | 9 |
| | 12354 | Dharwad | Dharwad | Kalghatgi | KN-13-08 | Improvements to Road - MRL03-Kuruvinakoppa to MDR near Mishrikoti to 5.55 | 5.55 | 5.55 | | 24-06-2020 | 31-12-2021 | 555 | 10 |
| | 12357 | Dharwad | Dharwad | Kalghatgi | KN-13-09 | Improvements to Road - MRL21-Kandli to Sachhidanandanagar via Suilkatti and Maslikatti to 4.2 | 4.20 | 4.20 | | 17-07-2020 | 31-01-2022 | 563 | 7 |
| | 12355 | Dharwad | Dharwad | Kalghatgi | KN-13-09 | Improvements to Road - MRL20-Shivanapur to Nelliharvi via Mukkal Somanakoppa Aralihonda to 10.68 | 10.68 | 10.68 | | 17-07-2020 | 31-01-2022 | 563 | 19 |
| | 12358 | Dharwad | Dharwad | Navalgund | KN-13-10 | Improvements to Road - MRL03-Annigeri to Nagarhalli via Hallikeri Basapur to 21.9 | 21.90 | 21.90 | | 10-07-2020 | 15-01-2022 | 554 | 40 |
| | 12363 | Dharwad | Dharwad | Kundgol | KN-13-11 | Construction of Long span bridge - Constr of Box culvert at 8.16km in MRL 12-Kalas to Pashupatihal to 18.15 | 18.15 | 18.15 | | 07-08-2020 | 01-07-2021 | 328 | 55 |
| | 12364 | Dharwad | Dharwad | Kundgol | KN-13-11 | Construction of Long span bridge - Constr of Box culvert at Ch 1.86 in MRL06 Yaliwal to join Kamadolli hanchinal road via kubhihal to 47.35 | 47.35 | 47.35 | | 07-08-2020 | 05-09-2021 | 394 | 120 |
| | 12365 | Dharwad | Dharwad | Kundgol | KN-13-11 | Construction of Long span bridge - Const of Box culvert at 2.79km in MRL16-Ingalgi to Kamadolli via Tarlghatta to 19.4 | 19.40 | 19.40 | | 07-08-2020 | 10-04-2022 | 611 | 32 |
| | 12359 | Dharwad | Dharwad | Kundgol | KN-13-11 | Construction of Long span bridge - Constr of Box culvert at 3.60 Km in MRL06-Yaliwal to join Kamadolli hanchinal road via kubhihal to 50.65 | 50.65 | 50.65 | | 07-08-2020 | 03-09-2021 | 392 | 129 |
| | 12361 | Dharwad | Dharwad | Navalgund | KN-13-12 | Construction of Long span bridge - Const of Box culvert at 1.42 km in MRL02-Annigeri SH to Bhadrapur to 21.05 | 21.05 | 21.05 | | 10-07-2020 | 05-05-2022 | 664 | 32 |
| | 12360 | Dharwad | Dharwad | Navalgund | KN-13-12 | Construction of Long span bridge - Const of Box culvert at 2.42Km in MRL02-Annigeri SH to Bhadrapur road to 39.8 | 39.80 | 39.80 | | 10-07-2020 | 31-01-2022 | 570 | 70 |
| | 12986 | Dharwad | Dharwad | Kundgol | KN-13-13 | Improvements to Road - MRL06-Yaliwal to join Kamadolli hanchinal road via kubhihal to 5.92 | 5.92 | 5.92 | CHANDRASHEKAR APPASAHEB BIRADAR | 23-08-2021 | 04-05-2023 | 619 | 10 |
| | 12985 | Dharwad | Dharwad | Kundgol | KN-13-13 | Improvements to Road - MRL01-Saunshi to Kamadolli to 4.57 | 4.57 | 4.57 | CHANDRASHEKAR APPASAHEB BIRADAR | 23-08-2021 | 04-05-2023 | 619 | 7 |
| | 12987 | Dharwad | Dharwad | Kundgol | KN-13-13 | Improvements to Road - MRL16-Ingalgi to Kamadolli via Tarlghatta to 5.19 | 5.19 | 5.19 | CHANDRASHEKAR APPASAHEB BIRADAR | 23-08-2021 | 04-05-2023 | 619 | 8 |
| | 12989 | Dharwad | Dharwad | Kundgol | KN-13-14 | Improvements to Road - MRL12-Kalas to Pashpatihal to 8.81 | 8.81 | 8.81 | CHANDRASHEKAR APPASAHEB BIRADAR | 23-08-2021 | 20-01-2026 | 1611 | 5 |
| | 12988 | Dharwad | Dharwad | Kundgol | KN-13-14 | Improvements to Road - MRL04-Hirenarhatti to Saunshi via Basapur to 7.24 | 7.24 | 7.24 | CHANDRASHEKAR APPASAHEB BIRADAR | 23-08-2021 | 20-01-2026 | 1611 | 4 |
| | 12990 | Dharwad | Dharwad | Navalgund | KN-13-15 | Improvements to Road - MRL02-Annigeri SH to Bhadrapur to 7.13 | 7.13 | 7.13 | MALLESHAPPA V GANIGER | 14-09-2021 | 09-01-2024 | 847 | 8 |
| | 12998 | Dharwad | Dharwad | Dharwad | KN-13-16 | Construction of Long span bridge - Construction of box culvert at Ch 5.28 on T02-Timmapur up to taluka border (Morab) via amminabhavi to 25.25 | 25.25 | 25.25 | M/S BSG Infrastrucure (BEERANNA S GAONKAR | 12-07-2021 | 14-12-2023 | 885 | 29 |
| | 12991 | Dharwad | Dharwad | Dharwad | KN-13-16 | Improvements to Road - MRL06-Kelageri to yadawad via narendra kumbapur to 6.52 | 6.52 | 6.52 | M/S BSG Infrastrucure (BEERANNA S GAONKAR | 12-07-2021 | 14-12-2023 | 885 | 7 |
| | 12993 | Dharwad | Dharwad | Dharwad | KN-13-16 | Improvements to Road - T02-Timmapur up to taluka border (Morab) via amminabhavi to 9 | 9.00 | 9.00 | M/S BSG Infrastrucure (BEERANNA S GAONKAR | 12-07-2021 | 14-12-2023 | 885 | 10 |
| | 12994 | Dharwad | Dharwad | Dharwad | KN-13-17 | Improvements to Road - MRL22-Mugali to Shedbal via Hosatti to 6.35 | 6.35 | 6.35 | Mallikarjun Basappa Kallur | 12-07-2021 | 30-11-2023 | 871 | 7 |
| | 12992 | Dharwad | Dharwad | Dharwad | KN-13-17 | Improvements to Road - T03-Marigeri tq border to T.Shigihalli tq border via Madhanbhavi to 7.29 | 7.29 | 7.29 | Mallikarjun Basappa Kallur | 12-07-2021 | 09-01-2024 | 911 | 8 |
| | 12984 | Dharwad | Dharwad | Dharwad | KN-13-18 | Construction of Long span bridge - Construction of Box Culvert at Ch 1.512 km on MRL02 Mangundi to Nigadi via Benkanakatti to 16.6 | 16.60 | 16.60 | ABDULLAZIZ RAJESABH DODDAMANI | 16-06-2021 | 15-03-2022 | 272 | 61 |
| | 12999 | Dharwad | Dharwad | Hubli | KN-13-19 | Construction of Long span bridge - Construction of box culvert at Ch 0.38 km on T01-Byahatti to taluk border via Sulla to 18.13 | 18.13 | 18.13 | M/S.B.T REDDY ENGINEERS and CONTRACOR (B THIRUPATHI REDDY) | 23-08-2021 | 20-01-2026 | 1611 | 11 |
| | 13002 | Dharwad | Dharwad | Navalgund | KN-13-20 | Construction of Long span bridge - Construction of box culvert at Ch 0.38 km on T03-Morab to taluk border via Shirur, Ayetti to 21.68 | 21.68 | 21.68 | Babugouda Mallanagouda Patil | 08-07-2021 | 05-06-2024 | 1063 | 20 |
| | 12997 | Dharwad | Dharwad | Navalgund | KN-13-21 | Improvements to Road - MRL10-Shelvadi to NH via Boganir, Kadadalli Amargol to 5.62 | 5.62 | 5.62 | MALLANAGOUDA S SANKAGOUDASANI | 06-09-2021 | 09-01-2024 | 855 | 7 |
| | 13001 | Dharwad | Dharwad | Navalgund | KN-13-21 | Construction of Long span bridge - Construction of box culvert atCh 1.184 km on MRL10 Shelvadi to NH via Boganur Kadadalli Amargol road to 77.98 | 77.98 | 77.98 | MALLANAGOUDA S SANKAGOUDASANI | 06-09-2021 | 14-12-2023 | 829 | 94 |
| | 13000 | Dharwad | Dharwad | Navalgund | KN-13-21 | Construction of Long span bridge - Construction of LSB at Ch 8.994km on MRL10 Shelvadi to NH via Boganur Kadadalli Amargol road to 24.66 | 24.66 | 24.66 | MALLANAGOUDA S SANKAGOUDASANI | 06-09-2021 | 31-05-2023 | 632 | 39 |
| | 12332 | Gadag | Gadag | Gadag | KN-14-08 | Improvements to Road - MRL31-Kurtakotti to Antur- Bentur to 6.73 | 6.73 | 6.73 | | 07-07-2020 | 31-03-2022 | 632 | 11 |
| | 12335 | Gadag | Gadag | Gadag | KN-14-08 | Construction of Long span bridge - Kurthkoti to Antur-Bentur Bridge to | 21.63 | 21.63 | | 07-07-2020 | 31-03-2022 | 632 | 34 |
| | 12331 | Gadag | Gadag | Gadag | KN-14-08 | Improvements to Road - MRL11-Mulagund to Kurthkoti to 5.33 | 5.33 | 5.33 | | 07-07-2020 | 31-03-2022 | 632 | 8 |
| | 12333 | Gadag | Gadag | Shirhatti | KN-14-09 | Improvements to Road - MRL11-Konchigeri to Suranagi via Budhihal to 7.16 | 7.16 | 7.16 | | 02-07-2020 | 31-03-2023 | 1002 | 7 |
| | 12334 | Gadag | Gadag | Shirhatti | KN-14-09 | Improvements to Road - MRL10-Doddur thanda to MDR via Suvarnagiri and suranagi to 9.18 | 9.18 | 9.18 | | 02-07-2020 | 10-06-2022 | 708 | 13 |
| | 12336 | Gadag | Gadag | Shirhatti | KN-14-09 | Construction of Long span bridge - Konchigeri HLC to 24.66 | 24.66 | 24.66 | | 02-07-2020 | 29-03-2025 | 1731 | 14 |
| | 12337 | Gadag | Gadag | Shirhatti | KN-14-09 | Construction of Long span bridge - Konchigeri Box culvert to | 26.43 | 26.43 | | 02-07-2020 | 29-08-2022 | 788 | 34 |
| | 13260 | Gadag | Gadag | Gadag | KN-14-10 | Improvements to Road - MRL19-Balaganur to Hombal road to 9.52 | 9.52 | 9.52 | BASAVARAJ V BINGI | 30-08-2021 | 31-03-2023 | 578 | 16 |
| | 13259 | Gadag | Gadag | Gadag | KN-14-10 | Improvements to Road - T02-Kadadi to upto tq border to 6.11 | 6.11 | 6.11 | BASAVARAJ V BINGI | 30-08-2021 | 15-03-2023 | 562 | 11 |
| | 13277 | Gadag | Gadag | Mundargi | KN-14-11 | Construction of Long span bridge - Harogeri to Mevundi HLC 20 Rows to 38.5 | 38.50 | 38.50 | RAJEEVGOUDA B PATIL | 02-07-2021 | 30-03-2022 | 271 | 142 |
| | 13261 | Gadag | Gadag | Mundargi | KN-14-11 | Improvements to Road - MRL15-Harogeri to Mevundi to 9.37 | 9.37 | 9.37 | RAJEEVGOUDA B PATIL | 02-07-2021 | 30-03-2022 | 271 | 35 |
| | 13275 | Gadag | Gadag | Mundargi | KN-14-11 | Construction of Long span bridge - Harogeri to Mevundi Box culvert at Ch 5.49 Km to 31.88 | 31.88 | 31.88 | RAJEEVGOUDA B PATIL | 02-07-2021 | 30-03-2022 | 271 | 118 |
| | 13274 | Gadag | Gadag | Mundargi | KN-14-11 | Construction of Long span bridge - Harogeri to Mevundi Box culvert at Ch 3.07 Km to 25.28 | 25.28 | 25.28 | RAJEEVGOUDA B PATIL | 02-07-2021 | 30-03-2022 | 271 | 93 |
| | 13276 | Gadag | Gadag | Mundargi | KN-14-11 | Construction of Long span bridge - Harogeri to Mevundi HLC 9 Rows to 19.47 | 19.47 | 19.47 | RAJEEVGOUDA B PATIL | 02-07-2021 | 30-03-2022 | 271 | 72 |
| | 13278 | Gadag | Gadag | Mundargi | KN-14-12 | Construction of Long span bridge - Hirewaddattati to Mevundi HLC at Ch 2.182 KM to 21.2 | 21.20 | 21.20 | A K HOSANGADI ( A K HOSANGADI ) | 16-08-2021 | 30-06-2022 | 318 | 67 |
| | 13263 | Gadag | Gadag | Mundargi | KN-14-12 | Improvements to Road - MRL39-Dambal to Shirur to 4.53 | 4.53 | 4.53 | A K HOSANGADI ( A K HOSANGADI ) | 16-08-2021 | 30-06-2022 | 318 | 14 |
| | 13262 | Gadag | Gadag | Mundargi | KN-14-12 | Improvements to Road - MRL37-Hirewaddattati to Mevundi to 7.94 | 7.94 | 7.94 | A K HOSANGADI ( A K HOSANGADI ) | 16-08-2021 | 30-06-2022 | 318 | 25 |
| | 13280 | Gadag | Gadag | Nargund | KN-14-13 | Construction of Long span bridge - Konnur to Lakmapur via Vasan and Beleri at Ch 1.938 to 21.2 | 21.20 | 21.20 | MAILARAGOUDA S PATIL | 16-08-2021 | 31-03-2023 | 592 | 36 |
| | 13265 | Gadag | Gadag | Nargund | KN-14-13 | Improvements to Road - MRL21-Konnur to Lakmapur via Vasan and Beleri to 5.43 | 5.43 | 5.43 | MAILARAGOUDA S PATIL | 16-08-2021 | 31-03-2023 | 592 | 9 |
| | 13264 | Gadag | Gadag | Nargund | KN-14-13 | Improvements to Road - MRL14-Naragund (SH) to Jagapur to 8.33 | 8.33 | 8.33 | MAILARAGOUDA S PATIL | 16-08-2021 | 31-12-2022 | 502 | 17 |
| | 13279 | Gadag | Gadag | Nargund | KN-14-14 | Construction of Long span bridge - Hadli to Konnur Long span bridge to 18.13 | 18.13 | 18.13 | MAHENDRA GOUDA B VEERANAGOUDAR | 16-08-2021 | 10-04-2022 | 237 | 76 |
| | 13266 | Gadag | Gadag | Nargund | KN-14-14 | Improvements to Road - MRL02-Hadli to Konnur to 12.5 | 12.50 | 12.50 | MAHENDRA GOUDA B VEERANAGOUDAR | 16-08-2021 | 30-06-2022 | 318 | 39 |
| | 13269 | Gadag | Gadag | Ron | KN-14-15 | Improvements to Road - MRL02-Sudi to Yarekurabanal to 5.67 | 5.67 | 5.67 | Anand Shree Infra Reality Pvt Ltd | 29-09-2021 | 30-06-2022 | 274 | 21 |
| | 13267 | Gadag | Gadag | Ron | KN-14-15 | Improvements to Road - MRL15-Mallapur to Savdi to 5.24 | 5.24 | 5.24 | Anand Shree Infra Reality Pvt Ltd | 29-09-2021 | 31-03-2024 | 914 | 6 |
| | 13285 | Gadag | Gadag | Ron | KN-14-15 | Construction of Long span bridge - Mallapur to Savdi HLC at Ch 3.568 Km to 73.1 | 73.10 | 73.10 | Anand Shree Infra Reality Pvt Ltd | 29-09-2021 | 31-03-2024 | 914 | 80 |
| | 13268 | Gadag | Gadag | Ron | KN-14-16 | Improvements to Road - MRL17-Abbigeri to Savadi to 10.8 | 10.80 | 10.80 | N B HOSAMANI | 31-08-2021 | 31-01-2023 | 518 | 21 |
| | 13281 | Gadag | Gadag | Ron | KN-14-16 | Construction of Long span bridge - Abbigeri to Savadi Box culvert at Ch 6.02 Km to 28.68 | 28.68 | 28.68 | N B HOSAMANI | 31-08-2021 | 25-07-2022 | 328 | 87 |
| | 13282 | Gadag | Gadag | Ron | KN-14-16 | Construction of Long span bridge - Abbigeri to Savadi Box culvert at Ch 9.27 Km to 42.28 | 42.28 | 42.28 | N B HOSAMANI | 31-08-2021 | 28-11-2022 | 454 | 93 |
| | 13270 | Gadag | Gadag | Ron | KN-14-17 | Improvements to Road - MRL19-Abbigeri to Halakeri road via budihal to 13.99 | 13.99 | 13.99 | Ravishankar R Andral | 30-07-2021 | 19-03-2024 | 963 | 15 |
| | 13284 | Gadag | Gadag | Ron | KN-14-17 | Construction of Long span bridge - Abbigeri to Halakeri road via budihal HLC at Ch 10.55 Km to 21.2 | 21.20 | 21.20 | Ravishankar R Andral | 30-07-2021 | 26-07-2022 | 361 | 59 |
| | 13283 | Gadag | Gadag | Ron | KN-14-17 | Construction of Long span bridge - Abbigeri to Halakeri road via budihal HLC at Ch 10.10 to 24.66 | 24.66 | 24.66 | Ravishankar R Andral | 30-07-2021 | 26-07-2022 | 361 | 68 |
| | 13271 | Gadag | Gadag | Shirhatti | KN-14-18 | Improvements to Road - MRL22-Suranagi to Yallapur (MDR) to 6.61 | 6.61 | 6.61 | RAMARADDI V BYALAHUNASHI | 08-07-2021 | 31-12-2022 | 541 | 12 |
| | 13272 | Gadag | Gadag | Shirhatti | KN-14-18 | Improvements to Road - MRL01-Vadavi to tq border via Belagatti to 7 | 7.00 | 7.00 | RAMARADDI V BYALAHUNASHI | 08-07-2021 | 31-12-2022 | 541 | 13 |
| | 13273 | Gadag | Gadag | Shirhatti | KN-14-19 | Improvements to Road - MRL16-Yalavatti to Laxmeshwar to 8.82 | 8.82 | 8.82 | AMARESH K HOSANGADI | 18-08-2021 | 31-03-2023 | 590 | 15 |
| | 14396 | Gadag | Gadag | Ron | KN-14-20 | Construction of Long span bridge - Construction of Box culvert at 6.018 Km in MRL 12- D.S. Hadagali to Abbigeri to 41 | 41.00 | 41.00 | RAJEEVGOUDA B PATIL | 24-03-2023 | 12-02-2024 | 325 | 126 |
| | 14395 | Gadag | Gadag | Ron | KN-14-20 | Construction of Long span bridge - Construction of Box Culvert at 10.50 Km in MRL12 D.S.Hadagali to Abbigeri to 28.83 | 28.83 | 28.83 | RAJEEVGOUDA B PATIL | 24-03-2023 | 12-02-2024 | 325 | 89 |
| | 14397 | Gadag | Gadag | Ron | KN-14-20 | Improvements to Road - MRL12-D.S.Hadagali to Abbigeri to 11.02 | 11.02 | 11.02 | RAJEEVGOUDA B PATIL | 24-03-2023 | 12-02-2024 | 325 | 34 |
| | 14398 | Gadag | Gadag | Shirhatti | KN-14-21 | Improvements to Road - MRL26-Hosur to Suganahalli to 6 | 6.00 | 6.00 | Ramesh Kapase | 19-05-2023 | 31-03-2024 | 317 | 19 |
| | 12443 | Gulbarga | Kalaburgi | Chittapur | KN-15-100 | Construction of Long span bridge - Construction of Long Span Bridge to Road From Nalwar to Tarkashpet Via Sugur(N) to 43.5 | 43.50 | 43.50 | | 15-02-2021 | 14-11-2021 | 272 | 160 |
| | 12434 | Gulbarga | Kalaburgi | Jewargi | KN-15-101 | Improvements to Road - MRL23-Kallur K to Balwandgi to 5.145 | 5.14 | 5.14 | | 08-07-2020 | 31-12-2021 | 541 | 10 |
| | 12435 | Gulbarga | Kalaburgi | Jewargi | KN-15-101 | Improvements to Road - MRL06-Hipparaga SN to Mandewal Cross to 5.6 | 5.60 | 5.60 | | 08-07-2020 | 31-12-2021 | 541 | 10 |
| | 12437 | Gulbarga | Kalaburgi | Jewargi | KN-15-102 | Improvements to Road - MRL11-Ranjanagi to MDR Via Halgattaragi to 8.505 | 8.51 | 8.51 | | 17-08-2020 | 31-01-2026 | 1993 | 4 |
| | 12436 | Gulbarga | Kalaburgi | Jewargi | KN-15-102 | Improvements to Road - MRL10-Kurnalli to Mayoor Via Mandewal to 4.77 | 4.77 | 4.77 | | 17-08-2020 | 05-01-2026 | 1967 | 2 |
| | 12438 | Gulbarga | Kalaburgi | Jewargi | KN-15-103 | Improvements to Road - MRL12-Harnur to Ijeri to 6.1 | 6.10 | 6.10 | | 07-07-2020 | 30-07-2022 | 753 | 8 |
| | 12439 | Gulbarga | Kalaburgi | Jewargi | KN-15-103 | Improvements to Road - MRL21-Yalwar to Satkhed via somnathhalli to 5.785 | 5.78 | 5.78 | | 07-07-2020 | 30-07-2022 | 753 | 8 |
| | 12433 | Gulbarga | Kalaburgi | Gulbarga | KN-15-104 | Improvements to Road - MRL30-Kamalapur to Limbu Tanda via Monu Naik Tanda Dinsi K tanda,Dinsi k to 10.568 | 10.57 | 10.57 | | 10-08-2020 | 30-01-2022 | 538 | 20 |
| | 12430 | Gulbarga | Kalaburgi | Gulbarga | KN-15-104 | Improvements to Road - MRL23-Antapnal to Jevanagi via Bhunyar to 5.488 | 5.49 | 5.49 | | 10-08-2020 | 30-01-2022 | 538 | 10 |
| | 12432 | Gulbarga | Kalaburgi | Gulbarga | KN-15-105 | Improvements to Road - MRL17-Astaga Cross to Pattan Via Bhimalli to 6.281 | 6.28 | 6.28 | | 08-07-2020 | 20-11-2022 | 865 | 7 |
| | 12431 | Gulbarga | Kalaburgi | Gulbarga | KN-15-105 | Improvements to Road - MRL13-Kadani Cross to Kawalga B Via Kadani, Minijagi to 6.227 | 6.23 | 6.23 | | 08-07-2020 | 20-11-2022 | 865 | 7 |
| | 12419 | Gulbarga | Kalaburgi | Afzalpur | KN-15-106 | Improvements to Road - MRL21-Gobbur B to Kadani Via Hawanoor to 9.22 | 9.22 | 9.22 | | 07-07-2020 | 31-12-2022 | 907 | 10 |
| | 12418 | Gulbarga | Kalaburgi | Afzalpur | KN-15-106 | Improvements to Road - MRL01-Afzalpur to Bandarwad Via Anoor Devalghangapur to 6.13 | 6.13 | 6.13 | | 07-07-2020 | 31-12-2022 | 907 | 7 |
| | 12420 | Gulbarga | Kalaburgi | Afzalpur | KN-15-107 | Improvements to Road - MRL12-Ingalgi B to Athnoor to 5 | 5.00 | 5.00 | | 08-07-2020 | 28-07-2022 | 750 | 7 |
| | 12421 | Gulbarga | Kalaburgi | Afzalpur | KN-15-107 | Improvements to Road - MRL19-Diksanga K to Karajgi Via Karajgi Tanda to 8.035 | 8.03 | 8.03 | | 08-07-2020 | 10-06-2022 | 702 | 11 |
| | 12422 | Gulbarga | Kalaburgi | Aland | KN-15-108 | Improvements to Road - MRL09-Dhangapur to Nimbarga via Battarga to 5.01 | 5.01 | 5.01 | | 13-07-2020 | 31-12-2021 | 536 | 9 |
| | 12425 | Gulbarga | Kalaburgi | Aland | KN-15-109 | Improvements to Road - MRL06-Tadkal to Jambga (R) to 5.86 | 5.86 | 5.86 | | 28-07-2020 | 17-02-2022 | 569 | 10 |
| | 12423 | Gulbarga | Kalaburgi | Aland | KN-15-109 | Improvements to Road - MRL01-Kinnisultan To Tadkal to 4.703 | 4.70 | 4.70 | | 28-07-2020 | 17-02-2022 | 569 | 8 |
| | 12426 | Gulbarga | Kalaburgi | Aland | KN-15-110 | Improvements to Road - MRL04-Sunthnoor cross to nimbarga via suntnoor dharmwadi basawanthwadi nibarga tanda to 8.606 | 8.61 | 8.61 | | 17-08-2020 | 16-01-2022 | 517 | 17 |
| | 12424 | Gulbarga | Kalaburgi | Aland | KN-15-110 | Improvements to Road - MRL22-Ladchincholi to Dharmwadi via kadganchi to 7.89 | 7.89 | 7.89 | | 17-08-2020 | 16-01-2022 | 517 | 15 |
| | 14812 | Gulbarga | Kalaburgi | Sedam | KN15-119 | Construction of Long Span Bridge At Ch : 3.90 km to Road From SH-10 to MDR Via Tontanalli in Sedam Taluk (Sedam Constituency), Kalaburagi District under PMGSY-III 2020-21 GOI Pkg No KN 15-31A | 0.21 | 0.21 | M/s KKB Engg & Constructions Pvt Ltd | 21-10-2023 | 23-02-2026 | 856 | 0 |
| | 14166 | Gulbarga | Kalaburgi | Chittapur | KN-15-120 | Construction of Long Span Bridge (6 Vent 5x3m Box Culvert) to Road from Hongunta to Tonsanalli (S) @ 1.800 km in Chittapur Taluka of Kalaburagi District. | 0.04 | 0.04 | M/s Abrar Constructions | 22-06-2022 | 02-08-2023 | 406 | 0 |
| | 14167 | Gulbarga | Kalaburgi | Chittapur | KN-15-121 | Construction of Long span Bridge (6Vent of 4mx4m Box Culvert) to Road from SH to Kardal Via Devapur @ Ch 0.420km in Chittapur Taluka of Kalaburagi District. | 0.03 | 0.03 | M/s Abrar Constructions | 20-06-2022 | 18-03-2023 | 271 | 0 |
| | 12427 | Gulbarga | Kalaburgi | Chincholi | KN-15-96 | Improvements to Road - MRL17-Chandankera (SH125) to Ainapur (SH75) via kotga khanapoor to 12.78 | 12.78 | 12.78 | | 14-07-2020 | 28-02-2022 | 594 | 22 |
| | 12429 | Gulbarga | Kalaburgi | Chincholi | KN-15-97 | Improvements to Road - MRL09-Ainapur to Chiimmanchod tanda cross Via Benkepalli to 5.79 | 5.79 | 5.79 | | 10-08-2020 | 31-12-2021 | 508 | 11 |
| | 12428 | Gulbarga | Kalaburgi | Chincholi | KN-15-97 | Improvements to Road - MRL16-Seri cross to tq border via Junglipeer tanda cross Gundappa Gudi Tanda to 6.82 | 6.82 | 6.82 | | 10-08-2020 | 31-12-2021 | 508 | 13 |
| | 12440 | Gulbarga | Kalaburgi | Sedam | KN-15-98 | Improvements to Road - MRL09-SH 122 to Chittkanpalli Via Munkampalli to 5.91 | 5.91 | 5.91 | | 27-07-2020 | 27-07-2022 | 730 | 8 |
| | 12441 | Gulbarga | Kalaburgi | Sedam | KN-15-98 | Improvements to Road - MRL19-Gundahalli To Kodla Main Road (SH 15) Via Mushtahalli to 6.27 | 6.27 | 6.27 | | 27-07-2020 | 25-07-2022 | 728 | 9 |
| | 12442 | Gulbarga | Kalaburgi | Sedam | KN-15-99 | Improvements to Road - MRL20-Adki To SH 122 Near Ranjol Via Imdapur to 7.775 | 7.78 | 7.78 | | 10-08-2020 | 19-08-2022 | 739 | 11 |
| | 12175 | Hassan | Hassan | Alur | KN-16-10 | Improvements to Road - MRL17-Alur Biccodu Road via Chikkanagalu to join C.Hosahalli to 6.1 | 6.10 | 6.10 | | 04-09-2020 | 15-02-2022 | 529 | 12 |
| | 12173 | Hassan | Hassan | Alur | KN-16-10 | Improvements to Road - T12-B.M road to A.B Road via Bellur, Murdur, Kanathur to 3.9 | 3.90 | 3.90 | | 04-09-2020 | 15-02-2022 | 529 | 7 |
| | 12174 | Hassan | Hassan | Alur | KN-16-11 | Improvements to Road - T10-Kudidale to Kadlur Koodige to 9.8 | 9.80 | 9.80 | | 20-08-2020 | 15-07-2021 | 329 | 30 |
| | 12176 | Hassan | Hassan | Alur | KN-16-12 | Improvements to Road - MRL09-Abbana to NH-75 via Nidanur, J.Honnavally to 5.81 | 5.81 | 5.81 | | 17-07-2020 | 31-01-2022 | 563 | 10 |
| | 12179 | Hassan | Hassan | Arakalgud | KN-16-13 | Improvements to Road - MRL19-Shambhunathapura to Cholenahalli Via Chowdenahalli, Ankanayakanahalli, to 5.63 | 5.63 | 5.63 | | 30-09-2020 | 31-12-2022 | 822 | 7 |
| | 12177 | Hassan | Hassan | Arakalgud | KN-16-13 | Improvements to Road - MRL01- Devrahalli to Ganganalu via Hullangala to 4.23 | 4.23 | 4.23 | | 30-09-2020 | 31-12-2022 | 822 | 5 |
| | 14373 | Hassan | Hassan | Hassan | KN-16-132 | Improvements to Road from Shantigrama to hongere Via Benagatta, Bellikoppalu road in Hassan Taluk (Holenarasipura Constituency), Hassan District. | 3.13 | 3.13 | Hemanth kumar | 27-03-2023 | 20-01-2026 | 1030 | 3 |
| | 12180 | Hassan | Hassan | Arakalgud | KN-16-14 | Improvements to Road - MRL20-Konapura to SH-8 (CNS road) via Mudigere to 3 | 3.00 | 3.00 | | 03-09-2020 | 31-05-2022 | 635 | 5 |
| | 12178 | Hassan | Hassan | Arakalgud | KN-16-14 | Improvements to Road - MRL16-Kollangi to Chowragalli via Masavathuru to 6.61 | 6.61 | 6.61 | | 03-09-2020 | 31-05-2022 | 635 | 10 |
| | 12189 | Hassan | Hassan | Hassan | KN-16-15 | Improvements to Road - MRL01-Gyarahalli to Hachagondanahalli via Tejur to 5.22 | 5.22 | 5.22 | | 30-09-2020 | 31-05-2022 | 608 | 9 |
| | 12192 | Hassan | Hassan | Hassan | KN-16-15 | Improvements to Road - MRL37-SH near Hoovinahalli to Kuppalli via Haralahalli to 5.91 | 5.91 | 5.91 | | 30-09-2020 | 31-05-2022 | 608 | 10 |
| | 12188 | Hassan | Hassan | Hassan | KN-16-16 | Improvements to Road - MRL02-B T Koppalu to Salagame road via Yadiyur to 5.3 | 5.30 | 5.30 | | 30-06-2020 | 20-05-2021 | 324 | 16 |
| | 12190 | Hassan | Hassan | Hassan | KN-16-17 | Improvements to Road - MRL14-HN Pura TQ Border To Markuli Road Jn (Via Muthige ,Naganahalli ) to 4 | 4.00 | 4.00 | | 06-07-2020 | 31-12-2021 | 543 | 7 |
| | 12191 | Hassan | Hassan | Hassan | KN-16-17 | Improvements to Road - MRL34-MDR to MDR via Hosur, Mellahalli, Bellikopplu, Mallanayakanahalli, Bandihalli to 7.1 | 7.10 | 7.10 | | 06-07-2020 | 31-12-2021 | 543 | 13 |
| | 12193 | Hassan | Hassan | Sakaleshpur | KN-16-18 | Improvements to Road - MRL18-Hebbasale to Donigal(NH) via H colony, Adangudda, Devihalli to 3.15 | 3.15 | 3.15 | | 02-09-2020 | 31-01-2022 | 516 | 6 |
| | 12181 | Hassan | Hassan | Arasikere | KN-16-19 | Improvements to Road - MRL20-Kolagunda to Melinahosahalli to 4.16 | 4.16 | 4.16 | | 21-09-2020 | 09-10-2021 | 383 | 11 |
| | 12183 | Hassan | Hassan | Arasikere | KN-16-20 | Improvements to Road - MRL05-MDR near Thondiganahalli to MDR near Byadarahalli via Shanegere Thippaghatta to 4.05 | 4.05 | 4.05 | | 29-06-2020 | 31-12-2021 | 550 | 7 |
| | 12182 | Hassan | Hassan | Arasikere | KN-16-20 | Improvements to Road - T04-Jenukal siddapura to MDR near Nagathihalli via Bevinahalli to 7.935 | 7.93 | 7.93 | | 29-06-2020 | 31-12-2021 | 550 | 14 |
| | 12185 | Hassan | Hassan | Belur | KN-16-21 | Improvements to Road - T01-Mathgighatta to Hirihalli Via Suranayakanahalli to 5.1 | 5.10 | 5.10 | | 02-11-2020 | 30-04-2022 | 544 | 9 |
| | 12184 | Hassan | Hassan | Belur | KN-16-21 | Improvements to Road - MRL01-Venkatipete to join Dolanamane Via Arehallii,Heggadihalli to 8.275 | 8.27 | 8.27 | | 02-11-2020 | 30-04-2022 | 544 | 15 |
| | 12186 | Hassan | Hassan | Channarayapatna | KN-16-22 | Improvements to Road - MRL08-Anathi to Thimlapura vai- B.Byrapura to 5.59 | 5.59 | 5.59 | | 31-08-2020 | 30-11-2022 | 821 | 7 |
| | 13077 | Hassan | Hassan | Arakalgud | KN-16-23 | Improvements to Road - MRL04-Ganjalagudu to Maravalalu via Muddanahalli, Bychanahalli to | 3.90 | 3.90 | H C VENKATESH | 22-07-2021 | 27-04-2022 | 279 | 14 |
| | 13078 | Hassan | Hassan | Holenarasipur | KN-16-24 | Improvements to Road - MRL19-Hoovinahalli to Join Mudalahippe Road Via kukumadahossur,Gulisathenahalli to | 5.56 | 5.56 | S Narayana reddy | 05-07-2021 | 31-03-2023 | 634 | 9 |
| | 13079 | Hassan | Hassan | Sakaleshpur | KN-16-25 | Improvements to Road - MRL06-SH-112 to Hombetta to | 3.60 | 3.60 | H M Ramegowda | 06-08-2021 | 31-03-2023 | 602 | 6 |
| | 13080 | Hassan | Hassan | Sakaleshpur | KN-16-26 | Improvements to Road - T02-Banavase- Kabbinagadde road to | 7.27 | 7.27 | H M Ramegowda | 06-08-2021 | 31-03-2023 | 602 | 12 |
| | 13081 | Hassan | Hassan | Sakaleshpur | KN-16-27 | Improvements to Road - MRL01-Dinnekere to taluk border via Kallahalli, Kesaguli to | 3.70 | 3.70 | H M Ramegowda | 06-08-2021 | 31-03-2023 | 602 | 6 |
| | 13082 | Hassan | Hassan | Arakalgud | KN-16-28 | Improvements to Road - MRL08-AGH road to Belavadi Koratikere road via Ajjuru, Vaddarahalli, Hanemaranahalli. to | 4.97 | 4.97 | H C VENKATESH | 22-07-2021 | 31-03-2023 | 617 | 8 |
| | 13083 | Hassan | Hassan | Arasikere | KN-16-29 | Improvements to Road - MRL24-AH Road to Nagavedi Via Mallapura to | 6.24 | 6.24 | Gnanesh L S | 28-06-2021 | 31-03-2023 | 641 | 10 |
| | 13084 | Hassan | Hassan | Arasikere | KN-16-30 | Improvements to Road - T01-J.C pura to Tiptur Taluk Border Via Rampura to | 4.96 | 4.96 | R T VENKATEGOWDA ( L V CONSTRUCTION ) | 01-07-2021 | 17-01-2026 | 1661 | 3 |
| | 13085 | Hassan | Hassan | Belur | KN-16-31 | Improvements to Road - MRL12-TT road to BB road via Booranahalli,Bombadihalli to | 5.46 | 5.46 | C D Diwakar | 28-06-2021 | 31-03-2023 | 641 | 9 |
| | 13086 | Hassan | Hassan | Belur | KN-16-32 | Improvements to Road - MRL32-MDR to MDR via Handralu , Mallikarjunapura to | 6.03 | 6.03 | B S ASHOK | 16-07-2021 | 17-01-2026 | 1646 | 4 |
| | 13087 | Hassan | Hassan | Belur | KN-16-33 | Improvements to Road - MRL34-MDR to MDR Via Girikallahalli, Shivapura kaval, Savasihalli to | 5.43 | 5.43 | C D Diwakar | 28-06-2021 | 17-01-2026 | 1664 | 3 |
| | 13088 | Hassan | Hassan | Channarayapatna | KN-16-34 | Improvements to Road - MRL23-Tenkanahalli to MDR (akkanahalli-Hirisave) via- Tavarekere, Attihalli, Chinnenehalli, Kavalhosur to | 4.03 | 4.03 | JAYARAM J S | 29-07-2021 | 31-03-2023 | 610 | 7 |
| | 13090 | Hassan | Hassan | Channarayapatna | KN-16-35 | Improvements to Road - MRL17-Agasarahalli to Joisarahalli via- Narayanapura to | 3.96 | 3.96 | B S ASHOK | 16-07-2021 | 20-01-2026 | 1649 | 2 |
| | 13089 | Hassan | Hassan | Channarayapatna | KN-16-35 | Improvements to Road - MRL11-Agasarahalli MDR -19 via- Thippur, Darasihalli, Govinakere to | 6.26 | 6.26 | B S ASHOK | 16-07-2021 | 31-03-2023 | 623 | 10 |
| | 13091 | Hassan | Hassan | Hassan | KN-16-37 | Improvements to Road - MRL36-Varthikere to Kallhalli via Kalathammanahalii to | 6.60 | 6.60 | R T VENKATEGOWDA ( L V CONSTRUCTION ) | 01-07-2021 | 30-09-2022 | 456 | 14 |
| | 13092 | Hassan | Hassan | Hassan | KN-16-38 | Improvements to Road - MRL38-Uddur to Hachagodanahalli via Korahalli to | 3.95 | 3.95 | H C VENKATESH | 25-06-2021 | 20-01-2026 | 1670 | 2 |
| | 13096 | Hassan | Hassan | Holenarasipur | KN-16-39 | Improvements to Road - MRL01-Badakyathanahalli to SH Near Bidarakka Via Somenahalli to | 3.20 | 3.20 | S Narayana reddy | 05-07-2021 | 31-03-2023 | 634 | 5 |
| | 13093 | Hassan | Hassan | Holenarasipur | KN-16-39 | Improvements to Road - MRL26-Hargoudanahalli To Join Badakyathanahalli Via Guddenahalli ,Jakkanahalli to | 4.97 | 4.97 | S Narayana reddy | 05-07-2021 | 31-03-2023 | 634 | 8 |
| | 13095 | Hassan | Hassan | Holenarasipur | KN-16-40 | Improvements to Road - MRL09-Nagarthi to MDR Via Devaramuddanahalli,Arehalli to | 5.16 | 5.16 | K S ASHWATHNARAYANA GOWDA ( YNG CONSTRUCTION INDIA PRIVATE LIMITED ) | 22-07-2021 | 31-03-2023 | 617 | 8 |
| | 13094 | Hassan | Hassan | Holenarasipur | KN-16-40 | Improvements to Road - MRL12-MDR to MDR Via Rangehalli Mallenahalli Bachanahalli to | 3.21 | 3.21 | K S ASHWATHNARAYANA GOWDA ( YNG CONSTRUCTION INDIA PRIVATE LIMITED ) | 22-07-2021 | 31-03-2023 | 617 | 5 |
| | 13097 | Hassan | Hassan | Sakaleshpur | KN-16-41 | Improvements to Road - MRL15-Adidal to Kadumane road via Nattalli to | 4.30 | 4.30 | Nagaraj M T | 05-07-2021 | 30-09-2022 | 452 | 10 |
| | 13098 | Hassan | Hassan | Hassan | KN-16-42 | Construction of Long span bridge - Construction of New Long span RCC Box culvert of Gyarahalli to Hachagondanahalli Road at Ch.0.560 km to | 17.00 | 17.00 | H M Ramegowda | 06-08-2021 | 17-05-2022 | 284 | 60 |
| | 13099 | Hassan | Hassan | Hassan | KN-16-43 | Construction of Long span bridge - Construction of New Long span RCC Hume pipe culvert of MDR to MDR via Hosur, Mellahalli at Ch3.530km to | 22.00 | 22.00 | S Narayana reddy | 05-07-2021 | 14-04-2022 | 283 | 78 |
| | 12306 | Haveri | Haveri | Byadgi | KN-17-08 | Improvements to Road - MRL04-Sudambi to join MDR via Chikkalli, Hirehalli, Siddapur, Dasankoppa to 8.71 | 8.71 | 8.71 | | 08-09-2020 | 07-01-2023 | 851 | 10 |
| | 12307 | Haveri | Haveri | Byadgi | KN-17-09 | Improvements to Road - MRL09-Dummihal to join SH near Tumarikoppa via Sudambi, Hireanaji, Dhullikoppa to 9.7 | 9.70 | 9.70 | | 26-09-2020 | 09-10-2023 | 1108 | 9 |
| | 12308 | Haveri | Haveri | Byadgi | KN-17-10 | Improvements to Road - MRL05-Dasanakoppa to Chikkanaji via Kummur, Mattur, Dhullikoppa to 13.83 | 13.83 | 13.83 | | 08-09-2020 | 09-10-2023 | 1126 | 12 |
| | 12310 | Haveri | Haveri | Hangal | KN-17-11 | Improvements to Road - MRL08-Vardi to tp join MDR via Shankrikoppa to 5.05 | 5.05 | 5.05 | | 25-08-2020 | 19-05-2022 | 632 | 8 |
| | 12309 | Haveri | Haveri | Hangal | KN-17-11 | Improvements to Road - MRL07-Naregal to Sankrikoppa via Kodiyallapur to 6.69 | 6.69 | 6.69 | | 25-08-2020 | 10-09-2025 | 1842 | 4 |
| | 12311 | Haveri | Haveri | Hangal | KN-17-12 | Improvements to Road - MRL01-Uppanshi to join SH near Adur via Byagawadi,, tavaragoppa, Hirehullal Kalkeri to 11.37 | 11.37 | 11.37 | | 15-08-2020 | 05-03-2022 | 567 | 20 |
| | 12312 | Haveri | Haveri | Haveri | KN-17-13 | Improvements to Road - MRL02-Havanur to Marol via Negalur ,Kodabal to 11.61 | 11.61 | 11.61 | | 27-07-2020 | 06-03-2023 | 952 | 12 |
| | 12326 | Haveri | Haveri | Haveri | KN-17-13 | Construction of Long span bridge - HAVANUR BRIDGE to 26.55 | 26.55 | 26.55 | | 27-07-2020 | 05-04-2023 | 982 | 27 |
| | 12314 | Haveri | Haveri | Haveri | KN-17-14 | Improvements to Road - MRL17-Negalur to Kanchargatti road (MDR) via Guttal to 11.85 | 11.85 | 11.85 | | 13-11-2020 | 31-12-2022 | 778 | 15 |
| | 12313 | Haveri | Haveri | Haveri | KN-17-14 | Improvements to Road - MRL01-Guttal to MDR(Guttal-Havanur Road) to 6.53 | 6.53 | 6.53 | | 13-11-2020 | 03-02-2023 | 812 | 8 |
| | 12315 | Haveri | Haveri | Ranibennur | KN-17-15 | Improvements to Road - MRL01-Kamadod to (Halageri-Dandagihalli Road) via Itagi ,Antaravalli to 3.9 | 3.90 | 3.90 | | 31-08-2020 | 05-03-2022 | 551 | 7 |
| | 12316 | Haveri | Haveri | Ranibennur | KN-17-15 | Improvements to Road - MRL02-Itagi to Yalabadagi via Manakur, Nandhihalli to 5.98 | 5.98 | 5.98 | | 31-08-2020 | 05-03-2022 | 551 | 11 |
| | 12318 | Haveri | Haveri | Ranibennur | KN-17-16 | Improvements to Road - MRL06-Ankasapura to Huvinamaradi via Medleri,Karuri, Hullikatti to 6.54 | 6.54 | 6.54 | | 25-08-2020 | 05-03-2022 | 557 | 12 |
| | 12317 | Haveri | Haveri | Ranibennur | KN-17-16 | Improvements to Road - T02-Halaageri to Dandagihalli via Aladakati, Nittur, Konantali to 3.9 | 3.90 | 3.90 | | 25-08-2020 | 05-03-2022 | 557 | 7 |
| | 12319 | Haveri | Haveri | Ranibennur | KN-17-16 | Improvements to Road - T01-Karur to Somalapura via Rahutaanakatti, Medleri to 4.6 | 4.60 | 4.60 | | 25-08-2020 | 31-03-2021 | 218 | 21 |
| | 12328 | Haveri | Haveri | Savanur | KN-17-17 | Construction of Long span bridge - Ichangi Bridge to 40.28 | 40.28 | 40.28 | | 07-09-2020 | 02-05-2022 | 602 | 67 |
| | 12321 | Haveri | Haveri | Savanur | KN-17-17 | Improvements to Road - MRL07-Ichangi to Suranageri via Hesarur , Siddapur to 7.53 | 7.53 | 7.53 | | 07-09-2020 | 02-05-2022 | 602 | 13 |
| | 12322 | Haveri | Haveri | Savanur | KN-17-17 | Improvements to Road - MRL10-Hattimattur to Basavanakoppa via Hesarur, Kadakola to 8.49 | 8.49 | 8.49 | | 07-09-2020 | 02-05-2022 | 602 | 14 |
| | 12320 | Haveri | Haveri | Savanur | KN-17-18 | Improvements to Road - MRL03-Shirabadagi cross to Chillur badni via Allipura to 7.8 | 7.80 | 7.80 | | 16-07-2020 | 08-03-2022 | 600 | 13 |
| | 12323 | Haveri | Haveri | Shiggoan | KN-17-19 | Improvements to Road - MRL06-Kyalakonda to Madali via Belagali,Hulasogi,Chikkbendigeri,Supagatti to 9.11 | 9.11 | 9.11 | | 24-08-2020 | 10-09-2025 | 1843 | 5 |
| | 12324 | Haveri | Haveri | Shiggoan | KN-17-19 | Improvements to Road - MRL13-Artala to Kamanahalli cross via Yattinahalli , Makapura to 7.37 | 7.37 | 7.37 | | 24-08-2020 | 25-10-2023 | 1157 | 6 |
| | 12325 | Haveri | Haveri | Shiggoan | KN-17-20 | Improvements to Road - MRL10-Munavalli to Shiapura via Hottur,Kurshapur to 12.23 | 12.23 | 12.23 | | 16-07-2020 | 14-02-2024 | 1308 | 9 |
| | 12966 | Haveri | Haveri | Hirekerur | KN-17-21 | Improvements to Road - MRL09-Nulageri to Divigihalli via Dupadahalli Yattinahallimk to 7.12 | 7.12 | 7.12 | G P PRAKASH | 12-07-2021 | 16-05-2024 | 1039 | 7 |
| | 12327 | Haveri | Haveri | Hirekerur | KN-17-21A | Construction of Long span bridge - Guddadamadapur Bridge to 21.43 | 21.43 | 21.43 | | 21-09-2020 | 09-09-2022 | 718 | 30 |
| | 12965 | Haveri | Haveri | Hirekerur | KN-17-22 | Improvements to Road - MRL02-Haunsabhavi to SH via Kargi Betkerur Dammalli to 10.97 | 10.97 | 10.97 | RUDRAGOUDA N GANGOL | 12-07-2021 | 29-07-2025 | 1478 | 7 |
| | 12968 | Haveri | Haveri | Hangal | KN-17-23 | Improvements to Road - MRL06-Vasana to join SH near Akkialur via Somapur to 5.75 | 5.75 | 5.75 | Rajesab I Banagar | 24-06-2021 | 17-04-2022 | 297 | 19 |
| | 14797 | Haveri | Haveri | Haveri | KN-17-24 | Improvements to Road - T07-Kabbur to NH via Timmapur M.A, Kulenur, Venktapura, Benchalli, Naganur to 12.34 | 12.34 | 12.34 | H C VENKATESH | 10-07-2023 | 02-12-2024 | 511 | 24 |
| | 14798 | Haveri | Haveri | Shiggoan | KN-17-25 | Improvements to Road - MRL11-Baad to Bisanahalli via Kalyan to 5.39 | 5.39 | 5.39 | M/S PRADEEP CONSTRUCTION COMPANY | 17-06-2023 | 26-03-2026 | 1013 | 5 |
| | 12275 | Kodagu | Mangalore | Madikeri | KN-18-07 | Improvements to Road - MRL16-Balamuri to Hodavada School area via Vatakadu ,Hoddur to 5.59 | 5.59 | 5.59 | | 21-07-2020 | 19-06-2021 | 333 | 17 |
| | 12276 | Kodagu | Mangalore | Madikeri | KN-18-08 | Improvements to Road - MRL07-Bengur to Kopatti to 7.89 | 7.89 | 7.89 | | 20-07-2020 | 30-04-2022 | 649 | 12 |
| | 12277 | Kodagu | Mangalore | Madikeri | KN-18-09 | Improvements to Road - MRL11-Bavali to SH(Nariyanda) to 5.61 | 5.61 | 5.61 | | 21-07-2020 | 19-06-2021 | 333 | 17 |
| | 12278 | Kodagu | Mangalore | Somavarpet | KN-18-10 | Improvements to Road - MRL15-Suntikoppa Ayyappa Temple to Nakoor Via Kanbailu Bychanalii , Nakoor Shirangala to 6.64 | 6.64 | 6.64 | | 17-07-2020 | 30-04-2021 | 287 | 23 |
| | 12279 | Kodagu | Mangalore | Somavarpet | KN-18-11 | Improvements to Road - MRL17-Andagove to Kambibane Via Metnahalla to 6.38 | 6.38 | 6.38 | | 22-07-2020 | 31-05-2022 | 678 | 9 |
| | 12280 | Kodagu | Mangalore | Somavarpet | KN-18-12 | Improvements to Road - MRL05-Sunti to Gondallii (Via Basavanakoppa,Shanthveri,Gondalli) to 5.282 | 5.28 | 5.28 | | 20-07-2020 | 30-04-2021 | 284 | 19 |
| | 12281 | Kodagu | Mangalore | Somavarpet | KN-18-13 | Improvements to Road - MRL14-Karkalli to Kushalnagar SH to 5.99 | 5.99 | 5.99 | | 16-09-2020 | 31-10-2021 | 410 | 15 |
| | 12282 | Kodagu | Mangalore | Somavarpet | KN-18-14 | Improvements to Road - MRL19-1st Kudlur to Handli to 5.9 | 5.90 | 5.90 | | 14-09-2020 | 31-03-2022 | 563 | 10 |
| | 12283 | Kodagu | Mangalore | Virajpet | KN-18-15 | Improvements to Road - MRL42-Hudikeri to Bettachuki Via Bellur to 5.916 | 5.92 | 5.92 | | 25-08-2020 | 31-12-2022 | 858 | 7 |
| | 12284 | Kodagu | Mangalore | Virajpet | KN-18-16 | Improvements to Road - MRL40-K M Kolli to Kumtoor Via K.Badaga, Kallambala to 6.73 | 6.73 | 6.73 | | 30-07-2020 | 31-12-2021 | 519 | 13 |
| | 12285 | Kodagu | Mangalore | Virajpet | KN-18-17 | Improvements to Road - MRL20-C.H.Temple to Balapanakere Via Haligattu,Seetha Colony, Chinivada,Begur to 7.7 | 7.70 | 7.70 | | 30-07-2020 | 31-05-2022 | 670 | 11 |
| | 12286 | Kodagu | Mangalore | Virajpet | KN-18-18 | Improvements to Road - MRL19-Nangala to Bittangala - Kongana road( Via Kotheri,Podakeri, V.Badaga,Kuttandi ) to 8.9 | 8.90 | 8.90 | | 22-07-2020 | 31-12-2021 | 527 | 17 |
| | 12940 | Kodagu | Mangalore | Madikeri | KN-18-19 | Improvements to Road - MRL08-Balamuri to Konajageri via Nibbugeri to | 5.31 | 5.31 | K R NINGARAJAPPA | 10-05-2021 | 31-03-2023 | 690 | 8 |
| | 12366 | Kolar | Kolar | Bangarpet | KN-19-06 | Improvements to Road - MRL10-Nayakarahalli To Hudukula - Sulikunte to 12.39 | 12.39 | 12.39 | | 13-07-2020 | 31-05-2021 | 322 | 38 |
| | 12367 | Kolar | Kolar | Bangarpet | KN-19-07 | Improvements to Road - T09-RR Road to mothakpalli via doddagondahalli, yethur,nakkanahalli,dalavaihosahalli to 11.38 | 11.38 | 11.38 | | 13-07-2020 | 22-12-2021 | 527 | 22 |
| | 12369 | Kolar | Kolar | Bangarpet | KN-19-07 | Improvements to Road - T14-Parandahalli MDR to baluvanahalli Via Anatharamapura,Muddegowdanahalli,Jangamanahalli,Madivala majara kottur to 6.43 | 6.43 | 6.43 | | 13-07-2020 | 31-07-2021 | 383 | 17 |
| | 12370 | Kolar | Kolar | Bangarpet | KN-19-08 | Improvements to Road - T10-KGF-Kuppam SH To Kyasamballi Via Parandahalli,Puttepalli,Kambampalli,Chaldiganahalli,Beeranakuppa,Nachandlahalli,Buchepalli,Madivala to 7.06 | 7.06 | 7.06 | | 13-07-2020 | 31-05-2021 | 322 | 22 |
| | 12368 | Kolar | Kolar | Bangarpet | KN-19-08 | Improvements to Road - MRL03-Dinnur to Budikote road to 9.97 | 9.97 | 9.97 | | 13-07-2020 | 31-05-2021 | 322 | 31 |
| | 12371 | Kolar | Kolar | Kolar | KN-19-09 | Improvements to Road - T09-Vemagal to Bommasandra(MDR) to 8.325 | 8.32 | 8.32 | | 28-07-2020 | 31-05-2021 | 307 | 27 |
| | 12372 | Kolar | Kolar | Kolar | KN-19-10 | Improvements to Road - T19-NH-4 TO manighatta MDR Via vardenahalli,chadumanahalli,kalhastipura,shillangere, vadagur ,kembodi,iragasandra, parehosahalli to 16.58 | 16.58 | 16.58 | | 26-08-2020 | 30-09-2022 | 765 | 22 |
| | 12373 | Kolar | Kolar | Malur | KN-19-11 | Improvements to Road - MRL09-Kolar Taluk Border to Yalavaguli to 8.852 | 8.85 | 8.85 | | 26-08-2020 | 04-03-2022 | 555 | 16 |
| | 12377 | Kolar | Kolar | Malur | KN-19-11 | Improvements to Road - MRL16-Hunisikote to Taluk Border via Ullerahalli,Veerakatpura to 5.205 | 5.20 | 5.20 | | 26-08-2020 | 31-12-2021 | 492 | 11 |
| | 12375 | Kolar | Kolar | Malur | KN-19-12 | Improvements to Road - MRL04-Kolar Malur Hosur Road to M Sonnahalli to 3.526 | 3.53 | 3.53 | | 24-07-2020 | 27-03-2021 | 246 | 14 |
| | 12376 | Kolar | Kolar | Malur | KN-19-12 | Improvements to Road - MRL11-Masthi to Anikarahalli Road to 6.941 | 6.94 | 6.94 | | 24-07-2020 | 28-02-2022 | 584 | 12 |
| | 12374 | Kolar | Kolar | Malur | KN-19-12 | Improvements to Road - MRL22-Doddamale -Tekal road to Alahalli to 6.595 | 6.59 | 6.59 | | 24-07-2020 | 23-02-2022 | 579 | 11 |
| | 12378 | Kolar | Kolar | Mulbagal | KN-19-13 | Improvements to Road - T11-Alangur - Machanahalli road to NH-234 to 5.058 | 5.06 | 5.06 | | 22-07-2020 | 30-09-2021 | 435 | 12 |
| | 12379 | Kolar | Kolar | Mulbagal | KN-19-13 | Improvements to Road - T16-Pethandlahalli to Gudipally road to 5.803 | 5.80 | 5.80 | | 22-07-2020 | 06-08-2022 | 745 | 8 |
| | 12380 | Kolar | Kolar | Mulbagal | KN-19-14 | Improvements to Road - MRL08-Harapanayakanahalli Cross to Agara to 7.36 | 7.36 | 7.36 | | 22-07-2020 | 23-12-2021 | 519 | 14 |
| | 12381 | Kolar | Kolar | Mulbagal | KN-19-14 | Improvements to Road - T06-Koladevi road to Kurudamale road to 5.97 | 5.97 | 5.97 | | 22-07-2020 | 31-08-2021 | 405 | 15 |
| | 12382 | Kolar | Kolar | Mulbagal | KN-19-14 | Improvements to Road - T08-Tayalur to NH-234 to 6 | 6.00 | 6.00 | | 22-07-2020 | 31-08-2021 | 405 | 15 |
| | 12385 | Kolar | Kolar | Srinivasapura | KN-19-15 | Improvements to Road - MRL01- Jonnapalli-Digavapalli mdr Road to Hodli mdr via Dimbala, Champalli,devalapalli to 11.48 | 11.48 | 11.48 | | 13-07-2020 | 31-03-2021 | 261 | 44 |
| | 12384 | Kolar | Kolar | Srinivasapura | KN-19-16 | Improvements to Road - T15-SP Road to LP Road via Kornahalli, Pataballapalli, Tantharlapalli, Chennapalli, Bachivaripalli, Ganganagaripalli to 9.57 | 9.57 | 9.57 | | 20-07-2020 | 31-07-2021 | 376 | 25 |
| | 12383 | Kolar | Kolar | Srinivasapura | KN-19-16 | Improvements to Road - MRL06-GBK Road to Byraganapalli -Yadaganapalli Road via Pathagowanpalli,G Reddivaripalli, Agrahara Thoragonigadda to 5.16 | 5.16 | 5.16 | | 20-07-2020 | 26-03-2021 | 249 | 21 |
| | 12145 | Koppal | Koppala | Gangavathi | KN-20-07 | Improvements to Road - MRL25-Navali to Jeeral to 8.41 | 8.41 | 8.41 | | 21-10-2020 | 20-09-2021 | 334 | 25 |
| | 12143 | Koppal | Koppala | Gangavathi | KN-20-07 | Improvements to Road - MRL24-Hirekeda to Navali-Kanakageri Road to 5.3 | 5.30 | 5.30 | | 21-10-2020 | 26-08-2021 | 309 | 17 |
| | 12144 | Koppal | Koppala | Gangavathi | KN-20-08 | Improvements to Road - MRL14-Naganakal to Laxmi camp, via Hulkihal, Hulkihal Camp, Chellur Camp to 10.06 | 10.06 | 10.06 | | 25-07-2020 | 30-10-2021 | 462 | 22 |
| | 12146 | Koppal | Koppala | Kustagi | KN-20-09 | Improvements to Road - MRL26-Jagir Gudadur to Kadival Vai Pattalachinti to 5.2 | 5.20 | 5.20 | | 29-08-2020 | 28-07-2021 | 333 | 16 |
| | 12147 | Koppal | Koppala | Yelburga | KN-20-10 | Improvements to Road - MRL02-Mandalagera (MDR) to Yerihanchihal Via Sidnekoppa to 7.44 | 7.44 | 7.44 | | 20-07-2020 | 31-12-2021 | 529 | 14 |
| | 13320 | Koppal | Koppala | Gangavathi | KN-20-11 | Improvements to Road - T01-Hanumanal to Gangavathi Tq border via Sirwar, godinal sanganal to | 5.00 | 5.00 | AMARA GUNDAPPA | 01-10-2021 | 15-05-2023 | 591 | 8 |
| | 13321 | Koppal | Koppala | Gangavathi | KN-20-11 | Improvements to Road - MRL12-Ulenoor to Budagumpa-Yaradona road via Eliganoor camp to | 8.55 | 8.55 | AMARA GUNDAPPA | 01-10-2021 | 23-03-2026 | 1634 | 5 |
| | 13231 | Koppal | Koppala | Koppal | KN-20-12 | Improvements to Road - MRL32-Alwandi to Talakal road to | 8.35 | 8.35 | K Uday Kumar | 09-08-2021 | 17-02-2023 | 557 | 15 |
| | 13232 | Koppal | Koppala | Koppal | KN-20-12 | Improvements to Road - MRL11-Halageri to Mudlapur Vai Madinoor to | 10.63 | 10.63 | K Uday Kumar | 09-08-2021 | 30-08-2023 | 751 | 14 |
| | 13233 | Koppal | Koppala | Koppal | KN-20-13 | Improvements to Road - MRL17-Danakanadoddi to Gudadalli Vai Kukanpalli to | 7.44 | 7.44 | G Haribabu | 09-11-2021 | 31-12-2022 | 417 | 18 |
| | 13234 | Koppal | Koppala | Kustagi | KN-20-14 | Improvements to Road - MRL24-Gorebihal to SH Kustagi-Pattadakal road Vai Yergeri, Madnal to | 5.95 | 5.95 | BASAVARAJU HALLUR | 27-08-2021 | 22-06-2022 | 299 | 20 |
| | 13235 | Koppal | Koppala | Kustagi | KN-20-15 | Improvements to Road - MRL25-Gumageri to U Kurabanal Vai Kandakur to | 3.59 | 3.59 | Doddappa Sangappa Kandakur | 23-07-2021 | 22-06-2022 | 334 | 11 |
| | 13236 | Koppal | Koppala | Kustagi | KN-20-15 | Improvements to Road - T11-Tavargera to Jumalapur Vai Nandapur, Navalihalli to | 15.91 | 15.91 | Doddappa Sangappa Kandakur | 23-07-2021 | 31-12-2022 | 526 | 30 |
| | 13239 | Koppal | Koppala | Yelburga | KN-20-16 | Improvements to Road - MRL39-Chikkamannapur to Katagihalli Tq Border Vai Markat to | 4.89 | 4.89 | Sankranti Prasad | 15-07-2021 | 20-01-2022 | 189 | 26 |
| | 13237 | Koppal | Koppala | Yelburga | KN-20-16 | Improvements to Road - MRL07-Bevoor to Salabhavi Vai Narasapur, Makkalli to | 6.40 | 6.40 | Sankranti Prasad | 15-07-2021 | 20-02-2022 | 220 | 29 |
| | 13238 | Koppal | Koppala | Yelburga | KN-20-17 | Improvements to Road - MRL04- N H 367to Kudagunti via Balagera to | 6.06 | 6.06 | MALLAPPA NEELAPPAGOWDA IMMADIGOUDRA | 26-08-2021 | 31-03-2023 | 582 | 10 |
| | 12389 | Mandya | Mandya | Krishnarajapet | KN-21-09 | Improvements to Road - T22-Sharahally to K R Pet - Nagamangala road Via Chikkaharanahally, Chikkaharanahally colony, Jothanapura to | 3.57 | 3.57 | | 18-09-2020 | 05-09-2022 | 717 | 5 |
| | 12386 | Mandya | Mandya | Krishnarajapet | KN-21-09 | Improvements to Road - T14-Maragonahally gate to join madapura road via Maragonahally, Govindanahally, Govindanahally koppalu, to 6.02 | 6.02 | 6.02 | | 18-09-2020 | 05-09-2022 | 717 | 8 |
| | 12387 | Mandya | Mandya | Krishnarajapet | KN-21-10 | Improvements to Road - T02-Mandagere to Angaramuddanahally - Gubbahally road Via Gaddehosuru, Mudalakoppalu, Allenahally, Kyathanahally, Beekanahally to | 8.90 | 8.90 | | 15-09-2020 | 13-07-2022 | 666 | 13 |
| | 12388 | Mandya | Mandya | Krishnarajapet | KN-21-11 | Improvements to Road - T18-krishnapura to panduvapura railway station SH road to | 4.60 | 4.60 | | 15-10-2020 | 22-08-2024 | 1407 | 3 |
| | 12390 | Mandya | Mandya | Krishnarajapet | KN-21-11 | Improvements to Road - T17-Gandinagara to join Kodimaranahally -Kundur road Via Settahally,chikalale, Hirikalale to | 6.62 | 6.62 | | 15-10-2020 | 22-08-2024 | 1407 | 5 |
| | 12392 | Mandya | Mandya | Maddur | KN-21-12 | Improvements to Road - MRL14-Taluk Border to Bidarahosahalli via Yaladahalli to 5.12 | 5.12 | 5.12 | | 12-10-2020 | 22-11-2022 | 771 | 7 |
| | 12391 | Mandya | Mandya | Maddur | KN-21-12 | Improvements to Road - MRL18-Ajjahalli to Nagarakere via Gurudevarahalli,Upparadoddi,Sompura to 5.17 | 5.17 | 5.17 | | 12-10-2020 | 31-08-2022 | 688 | 8 |
| | 12394 | Mandya | Mandya | Maddur | KN-21-13 | Improvements to Road - MRL25-Kesthur Bandihalli MDR to Nidasale via Avasaradahalli,Kundanakuppe,Harakanahalli to | 4.00 | 4.00 | | 17-08-2020 | 19-08-2023 | 1097 | 4 |
| | 12393 | Mandya | Mandya | Maddur | KN-21-13 | Improvements to Road - T08-Chapuradoddi to Huragalavadi via Belthur,Hombalegowdanadoddi,Guligowdanadoddi,Keremegaladoddi,Konsale Garibe Site,Konsaledoddi,D Hosahalli to | 6.77 | 6.77 | | 17-08-2020 | 05-07-2023 | 1052 | 6 |
| | 12395 | Mandya | Mandya | Maddur | KN-21-14 | Improvements to Road - T06-Borapura to Maddur Bus Stand via Sadolalu, KMF Colony, Basavanapura, Gejjalagere, Mabbalagere to | 9.69 | 9.69 | | 19-11-2020 | 26-04-2022 | 523 | 19 |
| | 12396 | Mandya | Mandya | Malavalli | KN-21-15 | Improvements to Road - MRL55-Gulgatta to Amrutheshwaranahalli Colony via Kandegala to | 4.82 | 4.82 | | 28-09-2020 | 01-02-2023 | 856 | 6 |
| | 12401 | Mandya | Mandya | Malavalli | KN-21-15 | Improvements to Road - MRL26-Gowdagere to Hadli to 3.82 | 3.82 | 3.82 | | 28-09-2020 | 20-01-2023 | 844 | 5 |
| | 12397 | Mandya | Mandya | Malavalli | KN-21-16 | Improvements to Road - MRL01-BM road To Uppanahalli Via Shettihalli to | 5.22 | 5.22 | | 31-08-2020 | 02-01-2023 | 854 | 6 |
| | 12398 | Mandya | Mandya | Malavalli | KN-21-16 | Improvements to Road - MRL19-Ravani to Kalyanikoppalu to 4.05 | 4.05 | 4.05 | | 31-08-2020 | 29-09-2022 | 759 | 5 |
| | 12400 | Mandya | Mandya | Malavalli | KN-21-17 | Improvements to Road - MRL32-NH 209 to Dadamahalli via Chennipura,Hullegala to | 6.19 | 6.19 | | 10-08-2020 | 30-04-2022 | 628 | 10 |
| | 12399 | Mandya | Mandya | Malavalli | KN-21-17 | Improvements to Road - T03-NH 209 to Linganapura via aladahalli,Kamsagara to | 4.53 | 4.53 | | 10-08-2020 | 30-04-2022 | 628 | 7 |
| | 12402 | Mandya | Mandya | Mandya | KN-21-18 | Improvements to Road - T03-Maranahalli to Goravale via M Kebbahalli, Shivali, Gorvale to | 7.95 | 7.95 | | 07-08-2020 | 05-04-2023 | 971 | 8 |
| | 12406 | Mandya | Mandya | Mandya | KN-21-19 | Improvements to Road - MRL13-Karadikoppalu to Mandya Nagamangala road via Bilidegalu to | 5.03 | 5.03 | | 27-07-2020 | 30-04-2022 | 642 | 8 |
| | 12403 | Mandya | Mandya | Mandya | KN-21-19 | Improvements to Road - MRL07-Karadikoppalu to Doddagarudanahalli via Hampapura, Upparakanahalli to 3.455 | 3.45 | 3.45 | | 27-07-2020 | 30-04-2022 | 642 | 5 |
| | 12405 | Mandya | Mandya | Mandya | KN-21-20 | Improvements to Road - T07-Hodaghatta to Mandya Kowdle road via Shivara, Siddegowdanadoddi to | 4.82 | 4.82 | | 19-10-2020 | 31-05-2022 | 589 | 8 |
| | 12404 | Mandya | Mandya | Mandya | KN-21-20 | Improvements to Road - MRL04-Bettahally to Mallaghatta via M Honnenahally to | 5.76 | 5.76 | | 19-10-2020 | 31-05-2022 | 589 | 10 |
| | 12407 | Mandya | Mandya | Nagamangala | KN-21-21 | Improvements to Road - MRL16-Bindiganavile toH Kyathanahally via B Mallenahally,Aghalayakoppalu,H Bhuvanahally. to 8.49 | 8.49 | 8.49 | | 21-04-2021 | 30-06-2023 | 800 | 11 |
| | 12410 | Mandya | Mandya | Nagamangala | KN-21-22 | Improvements to Road - MRL06-Doddabala to S Channapura via Chikkenahally, P Neralekere,Kadenahally. to | 7.62 | 7.62 | | 14-09-2020 | 29-02-2024 | 1263 | 6 |
| | 12408 | Mandya | Mandya | Nagamangala | KN-21-22 | Improvements to Road - MRL01-Kadenahally Road to Doddabalua MDR Via Naragalu to | 5.75 | 5.75 | | 14-09-2020 | 29-02-2024 | 1263 | 5 |
| | 12409 | Mandya | Mandya | Nagamangala | KN-21-23 | Improvements to Road - MRL03-Halthi to Gollarahatti Via Kendanahally,Veerasandra,Krishnapura,Chikkajata. to | 5.91 | 5.91 | | 07-08-2020 | 29-02-2024 | 1301 | 5 |
| | 12411 | Mandya | Mandya | Pandavapura | KN-21-24 | Improvements to Road - MRL05-Hulkere to J.Mallenahally via Chagashettahally,M.Bettahally,Shyadanahally. to | 7.51 | 7.51 | | 31-08-2020 | 27-10-2022 | 787 | 10 |
| | 12412 | Mandya | Mandya | Pandavapura | KN-21-25 | Improvements to Road - T01-Hiremarali to Meenagara Via Ganadahosur,Anuvalu,Madarahalli. to | 11.39 | 11.39 | | 31-08-2020 | 27-10-2022 | 787 | 14 |
| | 12413 | Mandya | Mandya | Pandavapura | KN-21-26 | Improvements to Road - MRL03-Madenahally to Naranapura via Balaghatta,B.Kodagahally to 5.21 | 5.21 | 5.21 | | 31-08-2020 | 28-02-2023 | 911 | 6 |
| | 12416 | Mandya | Mandya | Srirangapatna | KN-21-27 | Improvements to Road - MRL13-Kalkere to Taluk Boundary via AK Koppalu, Gammanahalli, Devaraguddanakoppalu to | 5.12 | 5.12 | | 05-08-2020 | 05-04-2022 | 608 | 8 |
| | 12414 | Mandya | Mandya | Srirangapatna | KN-21-27 | Improvements to Road - MRL21-Kodiyala to Kalakere via Doddaharohalli, Chikkaharohalli,Bannahalli,Bettahalli to | 6.33 | 6.33 | | 05-08-2020 | 05-04-2022 | 608 | 10 |
| | 12417 | Mandya | Mandya | Srirangapatna | KN-21-28 | Improvements to Road - MRL12-Belagola to KRS via Majjigepura, Hongalli to | 4.44 | 4.44 | | 14-12-2020 | 30-04-2022 | 502 | 9 |
| | 12415 | Mandya | Mandya | Srirangapatna | KN-21-28 | Improvements to Road - MRL02-T.M Hosur to Taluk Border via Gowdahalli,Gangur,siddapura to 5.76 | 5.76 | 5.76 | | 14-12-2020 | 30-04-2022 | 502 | 11 |
| | 12508 | Mysore | Mysore | Heggadadevanakote | KN-22-11 | Improvements to Road - MRL07-Kalasur to Hegganur road via Thelugumasahalli to 5.335 | 5.34 | 5.34 | | 25-08-2020 | 25-07-2022 | 699 | 8 |
| | 12507 | Mysore | Mysore | Heggadadevanakote | KN-22-11 | Improvements to Road - MRL02-Manuganahally to Annur Gaddige road via Belaganahally, Haropura to 6.73 | 6.73 | 6.73 | | 25-08-2020 | 25-07-2022 | 699 | 10 |
| | 12509 | Mysore | Mysore | Heggadadevanakote | KN-22-12 | Improvements to Road - T01-MM Road to Chamalapura via Mallahalli Bachegowdanahalli to 12.036 | 12.04 | 12.04 | | 31-08-2020 | 21-09-2022 | 751 | 16 |
| | 12510 | Mysore | Mysore | Heggadadevanakote | KN-22-13 | Improvements to Road - MRL19-H B Road to Bommalapura via Budanur to 5.825 | 5.82 | 5.82 | | 25-08-2020 | 30-04-2022 | 613 | 10 |
| | 12511 | Mysore | Mysore | Hunsur | KN-22-14 | Improvements to Road - MRL03-Kallahalli to Kothegala via Thammadahalli to 6.77 | 6.77 | 6.77 | | 23-10-2020 | 31-10-2023 | 1103 | 6 |
| | 14770 | Mysore | Mysore | Mysore | KN-22-144 | Improvements to Road from T-01 MDR Near Muddaiahanahundi to Join Handhanahlli via Katte Hundi, Marayanahundi, Doddamaragowdanahalli, Doddahattihundi Road | 11.41 | 11.41 | M/S Y V R CONSTRUCTIONS | 22-08-2023 | 31-12-2024 | 497 | 23 |
| | 12512 | Mysore | Mysore | Hunsur | KN-22-15 | Improvements to Road - MRL20-Biligere-Mailamburu Road to Jabagere via kallikoppalu, manchabayanahalli to 7.46 | 7.46 | 7.46 | | 19-08-2020 | 28-07-2023 | 1073 | 7 |
| | 12513 | Mysore | Mysore | Hunsur | KN-22-16 | Improvements to Road - MRL40-Uddur Road to Uyigowdanahally via Bannikuppe, Doddegowdanakoppalu to 6.155 | 6.16 | 6.16 | | 12-08-2020 | 31-03-2023 | 961 | 6 |
| | 12514 | Mysore | Mysore | Hunsur | KN-22-17 | Improvements to Road - MRL02-Hosakoppalu near to BM Road via Habbanakuppe, Kothegala, Yamagumbha to 9.96 | 9.96 | 9.96 | | 19-08-2020 | 15-02-2024 | 1275 | 8 |
| | 12515 | Mysore | Mysore | Krishnarajanagar | KN-22-18 | Improvements to Road - MRL29-Haliyur-Ankanahalli Road To Kesturkopllu Via Chikkakopplu Kuppe to 9.05 | 9.05 | 9.05 | | 15-07-2020 | 31-10-2022 | 838 | 11 |
| | 12516 | Mysore | Mysore | Krishnarajanagar | KN-22-19 | Improvements to Road - MRL16-SH57 To Kalyanpura via Gandhanalahhy to 5.18 | 5.18 | 5.18 | | 09-10-2020 | 27-09-2022 | 718 | 7 |
| | 12518 | Mysore | Mysore | Krishnarajanagar | KN-22-19 | Improvements to Road - MRL14-SH57 To Taluk Border Via Kanchikere Maragowdanahally to 4.49 | 4.49 | 4.49 | | 09-10-2020 | 27-09-2022 | 718 | 6 |
| | 12519 | Mysore | Mysore | Krishnarajanagar | KN-22-20 | Improvements to Road - MRL26-Salukopplu To KR Nagara Taluk Border Via Doddakopplu Kulmehosur to 4.27 | 4.27 | 4.27 | | 15-07-2020 | 31-10-2022 | 838 | 5 |
| | 12517 | Mysore | Mysore | Krishnarajanagar | KN-22-20 | Improvements to Road - MRL04-Kesturu-Kesturugate Road to Kaveri river Via Kesturkopplu to 5 | 5.00 | 5.00 | | 15-07-2020 | 31-10-2022 | 838 | 6 |
| | 12520 | Mysore | Mysore | Periyapatna | KN-22-21 | Improvements to Road - MRL04-Bettadakaval to Kelaganahalli via Kudkur to 9.42 | 9.42 | 9.42 | | 31-08-2020 | 31-01-2023 | 883 | 11 |
| | 12521 | Mysore | Mysore | Periyapatna | KN-22-22 | Improvements to Road - MRL05-P.Basavanahalli to MB Road-Thirumalapura Road Via Thirumalapura, Chikkahonur,Gariguddakaval,Handiguddakaval to 6.44 | 6.44 | 6.44 | | 31-08-2020 | 27-02-2023 | 910 | 7 |
| | 12522 | Mysore | Mysore | Periyapatna | KN-22-23 | Improvements to Road - MRL21-SH(Hunsur-Virajpet) to Habtoor kopplu via Malangi,Mummadikaval SC Kolony to 4.77 | 4.77 | 4.77 | | 17-07-2020 | 30-04-2022 | 652 | 7 |
| | 12523 | Mysore | Mysore | Periyapatna | KN-22-24 | Improvements to Road - MRL02-Ayarabedu to MB Road via Koralahosahalli Naviloor Alanahalli kopplu to 7.615 | 7.61 | 7.61 | | 13-07-2020 | 31-12-2021 | 536 | 14 |
| | 13340 | Mysore | Mysore | Nanjangud | KN-22-25 | Improvements to Road - MRL44-Kaggalur to Depegowdanapura- Makanpura Connecting Road via Hallare to | 6.94 | 6.94 | Y V R CONSTRUCTIONS | 17-09-2021 | 30-09-2024 | 1109 | 6 |
| | 13338 | Mysore | Mysore | Nanjangud | KN-22-25 | Improvements to Road - MRL34- Kongahalli to Hura via Malkundi to | 3.01 | 3.01 | Y V R CONSTRUCTIONS | 17-09-2021 | 30-09-2024 | 1109 | 3 |
| | 13332 | Mysore | Mysore | Nanjangud | KN-22-25 | Improvements to Road - MRL37-MDR near Shettahalli to Karya via Mangaloor to | 3.65 | 3.65 | Y V R CONSTRUCTIONS | 17-09-2021 | 30-09-2024 | 1109 | 3 |
| | 13331 | Mysore | Mysore | Nanjangud | KN-22-26 | Improvements to Road - MRL42-Haginavalu to Navilur to | 4.04 | 4.04 | Y V R CONSTRUCTIONS | 17-09-2021 | 23-04-2025 | 1314 | 3 |
| | 13339 | Mysore | Mysore | Nanjangud | KN-22-26 | Improvements to Road - MRL45-Hosapura to MDR near Hunasanalu to | 7.15 | 7.15 | Y V R CONSTRUCTIONS | 17-09-2021 | 23-04-2025 | 1314 | 5 |
| | 13330 | Mysore | Mysore | Nanjangud | KN-22-27 | Improvements to Road - MRL41-Handuvinahalli to Karalapura via Vaddarapalya to | 4.50 | 4.50 | HOSAPURA MUDDABASAPPA SHANTHAPPA ( HOSAPURA CONSTRUCTIONS PRIVATE LIMITED ) | 28-06-2021 | 31-03-2023 | 641 | 7 |
| | 13329 | Mysore | Mysore | Nanjangud | KN-22-27 | Improvements to Road - MRL40-Debur to Handijogicolony via Karalapura to | 3.32 | 3.32 | HOSAPURA MUDDABASAPPA SHANTHAPPA ( HOSAPURA CONSTRUCTIONS PRIVATE LIMITED ) | 28-06-2021 | 31-03-2023 | 641 | 5 |
| | 13325 | Mysore | Mysore | Mysore | KN-22-28 | Improvements to Road - MRL13-Kalalavadi to SH via Gorur to 4.385 | 4.39 | 4.39 | Y V R CONSTRUCTIONS | 17-09-2021 | 09-09-2025 | 1453 | 3 |
| | 13328 | Mysore | Mysore | Mysore | KN-22-28 | Improvements to Road - MRL35-MDR near Talur to SH via Kalalavadi to | 6.16 | 6.16 | Y V R CONSTRUCTIONS | 17-09-2021 | 30-09-2024 | 1109 | 6 |
| | 13326 | Mysore | Mysore | Mysore | KN-22-29 | Improvements to Road - MRL31-MDR near Bommenahally via seegahalli to taluk border to | 3.82 | 3.82 | K R SANTHOSH | 13-09-2021 | 24-08-2024 | 1076 | 4 |
| | 13324 | Mysore | Mysore | Mysore | KN-22-29 | Improvements to Road - MRL49-Doora to MDR near Thalur via Doddakatur to | 4.23 | 4.23 | K R SANTHOSH | 13-09-2021 | 24-08-2024 | 1076 | 4 |
| | 13327 | Mysore | Mysore | Mysore | KN-22-29 | Improvements to Road - MRL48-Beerehundi to MDR near Madahally to | 4.64 | 4.64 | K R SANTHOSH | 13-09-2021 | 09-09-2025 | 1457 | 3 |
| | 13334 | Mysore | Mysore | T.Narasipur | KN-22-30 | Improvements to Road - MRL18-From Kuphya to Hunaganahally to | 5.19 | 5.19 | Nagaraja K | 28-07-2021 | 30-11-2022 | 490 | 11 |
| | 13333 | Mysore | Mysore | T.Narasipur | KN-22-30 | Improvements to Road - MRL14-From Sujjalur to Karohatt via Hosurhundi, Muddabeernahundi to 6.82 | 6.82 | 6.82 | Nagaraja K | 28-07-2021 | 30-11-2022 | 490 | 14 |
| | 13336 | Mysore | Mysore | T.Narasipur | KN-22-31 | Improvements to Road - T01-Neragyathanahally to Bolegowdanahundi to | 4.16 | 4.16 | VIJENDRAMURTHY A | 13-08-2021 | 20-09-2022 | 403 | 10 |
| | 13335 | Mysore | Mysore | T.Narasipur | KN-22-31 | Improvements to Road - MRL17-Old Talakadu to Hosa Kukkuru Via Hale Kukkuru to | 5.68 | 5.68 | VIJENDRAMURTHY A | 13-08-2021 | 20-09-2022 | 403 | 14 |
| | 13337 | Mysore | Mysore | Heggadadevanakote | KN-22-32 | Construction of Long span bridge - Construction of Box culvert at Ch 3.280km in H B Road to Bommalapura via Budanur to | 16.60 | 16.60 | M/S KALGUDI Associates Prop | 05-08-2021 | 30-08-2022 | 390 | 43 |
| | 14801 | Mysore | Mysore | Mysore | KN-22-33 | Construction of Long - Span Bridge From Kalaavadi to SH via Gorur in Mysuru Taluk, Mysuru District. Under Pradhana Manthri Gram Sadak Yojana-III Batch – I and II of 2020-21 | 0.40 | 0.40 | Sri.Hosapura Muddabasappa Shanthappa, M/s. Hosapura Constructions Private Limited | 25-07-2023 | 30-08-2024 | 402 | 1 |
| | 12527 | Raichur | Raichur | Manvi | KN-23-08 | Improvements to Road - MRL05-Bhagwat Camp to Nico Camp via Bagalwada to 9.97 | 9.97 | 9.97 | | 16-11-2020 | 30-04-2022 | 530 | 19 |
| | 12524 | Raichur | Raichur | Deodurga | KN-23-09 | Improvements to Road - MRL06-SH link road to rekhalmardi via mallapurdoddi , kyadigera, bagerdoddi to 7.6 | 7.60 | 7.60 | | 28-10-2020 | 27-08-2022 | 668 | 11 |
| | 12525 | Raichur | Raichur | Deodurga | KN-23-10 | Improvements to Road - MRL04-MDR to taluk border G Hanumapur road via gabbur to 7.41 | 7.41 | 7.41 | | 30-07-2020 | 09-10-2021 | 436 | 17 |
| | 12526 | Raichur | Raichur | Lingasugur | KN-23-12 | Improvements to Road - MRL13-Santekallur to Maraldinni to 5.08 | 5.08 | 5.08 | | 04-12-2020 | 28-02-2022 | 451 | 11 |
| | 13604 | Raichur | Raichur | Raichur | KN23-13 | Improvements to road from T02-Marchathal cross road to Eklaspur cross road via Nelhal Jagapathi rao camp and Gonal in Raichur Taluk of Raichur | 18.11 | 18.11 | M. Eranna | 16-09-2021 | 30-06-2023 | 652 | 28 |
| | 13552 | Raichur | Raichur | Deodurga | KN23-14 | Improvements to road from MRL03-Jalhalli to devatgal via gandhal, huligudda | 9.52 | 9.52 | Bheemaraya (BBC & Co) | 11-11-2021 | 10-10-2022 | 333 | 29 |
| | 13553 | Raichur | Raichur | Deodurga | KN23-15 | Improvements to road from MRL07-Masarkal to MDR Link road via Guntral | 6.77 | 6.77 | Shivakumar (Shivakumar & Co) | 11-11-2021 | 05-05-2023 | 540 | 13 |
| | 13533 | Raichur | Raichur | Manvi | KN23-16 | Improvements to road from MRL17-Chickadinni cross road to Gogebal | 5.35 | 5.35 | Vikram U Patil (Patil Construction Company) | 10-11-2021 | 07-06-2024 | 940 | 6 |
| | 13532 | Raichur | Raichur | Manvi | KN23-16 | Improvements to road from MRL09-Watgal to Gudihal via Irkal | 6.60 | 6.60 | Vikram U Patil (Patil Construction Company) | 10-11-2021 | 07-06-2024 | 940 | 7 |
| | 13605 | Raichur | Raichur | Manvi | KN23-17 | Improvements to road from MRL08-Advi Amareshwara to Abburao Camp via Bhogavathi in Manvi Taluk of Raichur District | 7.19 | 7.19 | M. Eranna | 04-11-2021 | 04-03-2024 | 851 | 8 |
| | 13614 | Raichur | Raichur | Manvi | KN23-18 | Improvements to road from MRL25-Kurdi to Bailmerched in Manvi Taluk of Raichur District | 5.62 | 5.62 | K Venkatesh Yadav | 30-08-2021 | 01-07-2024 | 1036 | 5 |
| | 13613 | Raichur | Raichur | Manvi | KN23-18 | Improvements to road from MRL16-Heera MDR to Hussainpur SH in Manvi Taluk | 6.50 | 6.50 | K Venkatesh Yadav | 30-08-2021 | 01-07-2024 | 1036 | 6 |
| | 13535 | Raichur | Raichur | Sindhanur | KN23-19 | Improvements to road from MRL22-mavinamadu to Ambamath cross road via Roudkunda, sriramanagar camp | 5.37 | 5.37 | Gurram Naresh Kumar | 30-07-2021 | 08-08-2024 | 1105 | 5 |
| | 13534 | Raichur | Raichur | Sindhanur | KN23-19 | Improvements to road from MRL24-R,H,camp 1 to Timmapur road | 5.76 | 5.76 | Gurram Naresh Kumar | 30-07-2021 | 08-08-2024 | 1105 | 5 |
| | 13794 | Raichur | Raichur | Sindhanur | KN23-20 | Improvements to road from MRL09-Virupapur MDR to SH near Sindhanur | 7.03 | 7.03 | Chinnana Gouda Gonal | 05-07-2021 | 15-03-2024 | 984 | 7 |
| | 13528 | Raichur | Raichur | Lingasugur | KN23-22 | Improvements to Road from MRL16-Kalli lingasagur to Mudgal road | 7.30 | 7.30 | M.B Areshankar | 10-11-2021 | 25-02-2026 | 1568 | 5 |
| | 13609 | Raichur | Raichur | Lingasugur | KN23-23 | Improvements to road from MRL23-Gonwatla Tanda to Devarbhupur via Amareshwara in Lingasugur Taluk of Raichur District | 5.71 | 5.71 | C.V. Giridhar Naidu | 26-08-2021 | 25-07-2022 | 333 | 17 |
| | 13615 | Raichur | Raichur | Lingasugur | KN23-24 | Improvements to road from MRL04-Guragunta to Uppardoddi in Lingasugur Taluk of Raichur District | 5.69 | 5.69 | Vikram U Patil (Patil Construction Company) | 25-08-2021 | 22-05-2023 | 635 | 9 |
| | 13616 | Raichur | Raichur | Lingasugur | KN23-24 | Improvements to road from MRL22-Guntagol to Gurgunta road vis ramlooti idabhavi in Lingasugur Taluk of Raichur District | 6.75 | 6.75 | Vikram U Patil (Patil Construction Company) | 25-08-2021 | 22-05-2023 | 635 | 11 |
| | 14760 | Raichur | Raichur | Lingasugur | KN23-25 | Improvements to road from MRL06-Gonwatla tanda to Yeragunti | 6.28 | 6.28 | C.V.GIRIDHAR NAIDU | 18-05-2023 | 16-07-2024 | 425 | 15 |
| | 14749 | Raichur | Raichur | Sindhanur | KN23-26 | Improvements to Road From MRL01-Devargudi to Bommanal EJ via Chirthana, Pagadadinni road | 6.45 | 6.45 | Appaji Builders | 27-03-2023 | 02-03-2026 | 1071 | 6 |
| | 14751 | Raichur | Raichur | Sindhanur | KN23-26 | Construction of LSB Devargudi to Bommana at devargudi at chinage 0.100 Km | 0.00 | 0.00 | Appaji Builders | 27-03-2023 | 30-03-2024 | 369 | 0 |
| | 14750 | Raichur | Raichur | Sindhanur | KN23-26 | Construction of LSB Devargudi to Bommanal at pagadadinni at chinage 2.280 km | 0.00 | 0.00 | Appaji Builders | 27-03-2023 | 30-03-2024 | 369 | 0 |
| | 14748 | Raichur | Raichur | Sindhanur | KN23-27 | Improvements to Road from MRL53-Raitanagar camp to SH | 7.81 | 7.81 | Appaji Builders | 27-03-2023 | 25-03-2024 | 364 | 21 |
| | 12155 | Shimoga | Shivamogga | Shikaripur | KN-24-09 | Improvements to Road - MRL24-SH-57 Near Bhadrapura to Mudrahalli Via Gama, Isuru, Hunasekoppa to 10.8 | 10.80 | 10.80 | | 22-10-2020 | 31-03-2022 | 525 | 21 |
| | 12153 | Shimoga | Shivamogga | Shikaripur | KN-24-10 | Improvements to Road - MRL03-SH near Huluginakoppa to Kadenandhihalli Via Huluginakoppa, Muthagi, Bidarakoppa, Sadapura to 8.95 | 8.95 | 8.95 | | 02-11-2020 | 31-03-2022 | 514 | 17 |
| | 12154 | Shimoga | Shivamogga | Shikaripur | KN-24-10 | Improvements to Road - MRL04-Huliginakoppa-Koratigere MDR to Hakkali Via Channavasaprasanna Temple, Hosamuthagi to 3.7 | 3.70 | 3.70 | | 02-11-2020 | 31-03-2022 | 514 | 7 |
| | 12152 | Shimoga | Shivamogga | Shikaripur | KN-24-11 | Improvements to Road - MRL18-Biliki(MDR) to Siddihalli Via Kadethinahalli to 6.115 | 6.11 | 6.11 | | 21-09-2020 | 31-12-2022 | 831 | 7 |
| | 12151 | Shimoga | Shivamogga | Soraba | KN-24-12 | Improvements to Road - MRL03-Kamanavalli MDR Cross to Gondi Taluk Border via Chikachowthi, Jogerkere, Vadddigere, Hurulli, Toruvanda to 8.9 | 8.90 | 8.90 | | 09-11-2020 | 17-02-2024 | 1195 | 7 |
| | 12149 | Shimoga | Shivamogga | Soraba | KN-24-13 | Improvements to Road - MRL07-Malalikoppa to SH Via Chitturu, Kavadi to 6.65 | 6.65 | 6.65 | | 15-10-2020 | 31-03-2022 | 532 | 13 |
| | 12150 | Shimoga | Shivamogga | Soraba | KN-24-13 | Improvements to Road - MRL14-Vidyanagara to Bennuru via Horabailu, Mannetti Cross to 4.13 | 4.13 | 4.13 | | 15-10-2020 | 31-03-2022 | 532 | 8 |
| | 12148 | Shimoga | Shivamogga | Soraba | KN-24-14 | Improvements to Road - MRL04-Kodikoppa MDR to Kathuvalli Via Thimmapura, Bendekatte,Tudnuru, Hasavi, Siddihalli, Maddikumari to 11.44 | 11.44 | 11.44 | | 26-08-2020 | 28-02-2022 | 551 | 21 |
| | 12614 | Shimoga | Shivamogga | Bhadravathi | KN-24-15 | Improvements to Road - T16-SH-65(seetharampura) to thallikatte via seetharampura old grama taana, kumarinarayanapura to 5.15 | 5.15 | 5.15 | | 23-10-2020 | 03-05-2023 | 922 | 6 |
| | 12615 | Shimoga | Shivamogga | Bhadravathi | KN-24-15 | Improvements to Road - MRL17-Veerapura (SH-65) to Kachagondanahalli via komaranahalli, jayanagara, Vijayanagara to 5.04 | 5.04 | 5.04 | | 23-10-2020 | 03-05-2023 | 922 | 5 |
| | 12444 | Shimoga | Shivamogga | Bhadravathi | KN-24-16 | Improvements to Road - MRL22-NH-13(Yedehalli) to keerebeeranahalli via chandanakere, aratholalu, vaddarahatti, aratholalu to 6.17 | 6.17 | 6.17 | | 14-08-2020 | 03-05-2023 | 992 | 6 |
| | 12616 | Shimoga | Shivamogga | Shimoga | KN-24-17 | Improvements to Road - MRL10-NH-13 near Gajanur to Shimoga-Hai Hole road via Indiranagar, Tattikere and Basavapura to 7.62 | 7.62 | 7.62 | | 23-10-2020 | 03-05-2023 | 922 | 8 |
| | 12617 | Shimoga | Shivamogga | Shimoga | KN-24-18 | Improvements to Road - T02-MDR (near Koralahalli) to MDR-5 via Kachinakatte and Yaraganal to 4.57 | 4.57 | 4.57 | | 14-10-2020 | 03-05-2023 | 931 | 5 |
| | 12618 | Shimoga | Shivamogga | Shimoga | KN-24-18 | Improvements to Road - MRL07-NH-13 near Javalli to Kudli via Hoysanahalli and Abraghatta to 5.61 | 5.61 | 5.61 | | 14-10-2020 | 03-05-2023 | 931 | 6 |
| | 12619 | Shimoga | Shivamogga | Shimoga | KN-24-19 | Improvements to Road - T08-SH near Channamumbapura to MDR via Basavagangur and Kalgagangur to 6.59 | 6.59 | 6.59 | | 01-10-2020 | 03-05-2023 | 944 | 7 |
| | 12606 | Shimoga | Shivamogga | Thirthahalli | KN-24-20 | Improvements to Road - T05-NH (KALMANE VIA HANSA TO MEGARAVALLI )NH to 6.02 | 6.02 | 6.02 | | 31-07-2020 | 03-05-2023 | 1006 | 6 |
| | 12607 | Shimoga | Shivamogga | Thirthahalli | KN-24-20 | Improvements to Road - T10-SH SHANKRALLI VIA HORABYLU TO SH KONANNDUR to 4.23 | 4.23 | 4.23 | | 31-07-2020 | 03-05-2023 | 1006 | 4 |
| | 12602 | Shimoga | Shivamogga | Thirthahalli | KN-24-21 | Improvements to Road - MRL04-MDR( MELIGE TO HORABYLU VIA KELAKERE to 3.45 | 3.45 | 3.45 | | 07-08-2020 | 03-05-2023 | 999 | 3 |
| | 12603 | Shimoga | Shivamogga | Thirthahalli | KN-24-21 | Improvements to Road - T01-MDR MRUGAVADHE TO MUNDUVALLI MDR to 6.81 | 6.81 | 6.81 | | 07-08-2020 | 03-05-2023 | 999 | 7 |
| | 12620 | Shimoga | Shivamogga | Hosanagar | KN-24-22 | Improvements to Road - MRL26-Shirugolli to Heddaripura via Kalluru to 8.13 | 8.13 | 8.13 | | 21-10-2020 | 03-05-2023 | 924 | 9 |
| | 12604 | Shimoga | Shivamogga | Hosanagar | KN-24-23 | Improvements to Road - MRL23-Balehalli SH to SH 77(Brahmeshwara rd) to 5.76 | 5.76 | 5.76 | | 30-07-2020 | 03-05-2023 | 1007 | 6 |
| | 12605 | Shimoga | Shivamogga | Hosanagar | KN-24-23 | Improvements to Road - MRL09-Pujaridimba to Gouturu, to 5.16 | 5.16 | 5.16 | | 30-07-2020 | 03-05-2023 | 1007 | 5 |
| | 13225 | Shimoga | Shivamogga | Sagar | KN-24-24 | Improvements to Road - T36-Kugve to Kanle Via Vaddinagadde, Baradavalli, Hosakoppa , Marimane, Kanlepura, Thattekoppa to | 3.56 | 3.56 | Sharath J Shet Honnavarkar | 15-09-2021 | 30-04-2024 | 958 | 4 |
| | 13226 | Shimoga | Shivamogga | Sagar | KN-24-25 | Improvements to Road - MRL08-Gantinakoppa, Iruvakki Road Via Meduru, Kerekoppa, Iruvakki, Godagodu, Karadimane, Geerubeesu to | 7.48 | 7.48 | LUQMAN | 08-09-2021 | 28-05-2025 | 1358 | 6 |
| | 13227 | Shimoga | Shivamogga | Sagar | KN-24-26 | Improvements to Road - T24-NH 206 Near Balegundi to MDR Near Karehonda Via St Balegundi, Shiruguppe, Karehonda to | 4.56 | 4.56 | M/s AL-FATH TRADING and CONTRACTORS | 08-09-2021 | 30-04-2024 | 965 | 5 |
| | 13228 | Shimoga | Shivamogga | Sagar | KN-24-27 | Improvements to Road - T31-NH-206 to Hakkarekoppa, Nandikere Road Via Hakkarekoppa, Malali, Dombesara, Gadikatte, Tarekai, Mattibhavi, Mattibailu, Mundigerekai to | 9.63 | 9.63 | SHARADAPURA KRISHNAPPA CHANDRA ( SRI DEVI CONSTRUCTION ) | 20-09-2021 | 20-12-2023 | 821 | 12 |
| | 13530 | Shimoga | Shikaripura | Sagar | KN-24-28 | Construction of New RCC Bridge (21.00MX7.5MX2VENT) at ch:13.10 km in MRL-08 Gantikoppa Iruvakki road via Meduru, Kerekoppa, Iruvakki Gadaguddu, Karadimane, Geerubeesu in Sagara taluk of Shimoga District.
| 0.04 | 0.04 | Sri B N Police Patil, Class-1 Contractor, Bhudihal, Shorapur (tq), Gulbarga (dist). | 08-10-2021 | 28-02-2023 | 508 | 0 |
| | 13531 | Shimoga | Shikaripura | Sagar | KN-24-29 | Construction of New RCC Bridge (10.00X5.00X2VENT) ch: 0.54 km in MRL-08 Gantikoppa Iruvakki road via Meduru, Kerekoppa, Iruvakki Gadaguddu, Karadimane, Geerubeesu in Sagara taluk of Shimoga District.
| 0.02 | 0.02 | Sri B N Police Patil, Class-1 Contractor, Bhudihal, Shorapur (tq), Gulbarga (dist). | 08-10-2021 | 31-12-2022 | 449 | 0 |
| | 13240 | Shimoga | Shivamogga | Hosanagar | KN-24-30 | Improvements to Road - MRL01-Tenkabylu to Guddekoppa NH Via Kumbatti to | 5.55 | 5.55 | C V Chandrashekar | 12-08-2021 | 03-05-2023 | 629 | 9 |
| | 13242 | Shimoga | Shivamogga | Bhadravathi | KN-24-31 | Improvements to Road - T23-NH-13 to MDR(Holehonnur-bhadravathi road) via keereberanahalli, thattehalli, thimlapura dodanna camp,aradotlu to | 7.78 | 7.78 | M G K Hanumanthappa | 12-08-2021 | 03-05-2023 | 629 | 12 |
| | 13241 | Shimoga | Shivamogga | Bhadravathi | KN-24-31 | Improvements to Road - MRL19-Diary circle to Navilebasavapura via majjigenahalli, kerekodicircle, bilaki to 4.27 | 4.27 | 4.27 | M G K Hanumanthappa | 12-08-2021 | 03-05-2023 | 629 | 7 |
| | 13310 | Shimoga | Shivamogga | Thirthahalli | KN-24-32 | Improvements to Road - T14-SH HERAMBAPURA VIA HONNEKERE BASRVALLI TO MDR to | 3.10 | 3.10 | SIRIBAIL KOLLURE GOWDA DHARMESH ( SIRIBAIL KOLLURE GOWDA DHARMESH ) | 07-10-2021 | 30-11-2023 | 784 | 4 |
| | 13243 | Shimoga | Shivamogga | Hosanagar | KN-24-33 | Improvements to Road - MRL15-SH Gowrikere to Bisikal via Bennatti to | 3.10 | 3.10 | KRUPANANADA K | 06-08-2021 | 30-11-2023 | 846 | 4 |
| | 12537 | Tumkur | Sira | Koratagere | KN-25-12 | Improvements to Road - T05-Byrenahalli-Thondebavi Road to Siddlingayannapalya via Moraji school,Hosapalya,Agrahar Thanda,Hakkipikki colony to 4.23 | 4.23 | 4.23 | | 31-08-2020 | 21-06-2022 | 659 | 6 |
| | 12533 | Tumkur | Sira | Koratagere | KN-25-12 | Improvements to Road - MRL23-SH-03 to KMT Road via Mannurthimmanahalli,Hanumanthapura,Alalasandra,Kereyagalahalli to 3.03 | 3.03 | 3.03 | | 31-08-2020 | 21-06-2022 | 659 | 5 |
| | 12535 | Tumkur | Sira | Koratagere | KN-25-12 | Improvements to Road - MRL20-Koratagere-Kyamenahalli Road to Madavara via Bajjanahalli to 5.93 | 5.93 | 5.93 | | 31-08-2020 | 21-06-2022 | 659 | 9 |
| | 12536 | Tumkur | Sira | Koratagere | KN-25-13 | Improvements to Road - T03-Kathinagenahalli to koratagere-Madhugiri taluk border via Chilagonahalli, yadagere,kalkere,Gubalgutte to 5.43 | 5.43 | 5.43 | | 20-06-2020 | 03-06-2022 | 713 | 8 |
| | 12534 | Tumkur | Sira | Koratagere | KN-25-13 | Improvements to Road - T04-Gargadoddi - Voddagere Thanda road to SH-03 via yattujenahalli,jantacolony,puttammanapalya,Dasarahalli to 4.99 | 4.99 | 4.99 | | 20-06-2020 | 03-06-2022 | 713 | 7 |
| | 12545 | Tumkur | Sira | Madhugiri | KN-25-14 | Improvements to Road - MRL11-MDR-09 to SH-159 Via Bramsamudra to 5.11 | 5.11 | 5.11 | | 04-09-2020 | 08-01-2026 | 1952 | 3 |
| | 12544 | Tumkur | Sira | Madhugiri | KN-25-14 | Improvements to Road - MRL33-Polenahally to Thippapaura via Sundekunte to 7.01 | 7.01 | 7.01 | | 04-09-2020 | 08-01-2026 | 1952 | 4 |
| | 12547 | Tumkur | Sira | Madhugiri | KN-25-15 | Improvements to Road - MRL35-Veeropagondanahalli to Dabbegatta Via K. Gollarahatti ,Bittanakurke to 5.97 | 5.97 | 5.97 | | 22-07-2020 | 26-07-2022 | 734 | 8 |
| | 12548 | Tumkur | Sira | Madhugiri | KN-25-15 | Improvements to Road - MRL30- MDR-35 to Marithimmanahalli to via venkatapura ,Banavenahalli, jadegondanahalli. to 5.99 | 5.99 | 5.99 | | 22-07-2020 | 26-07-2022 | 734 | 8 |
| | 12546 | Tumkur | Sira | Madhugiri | KN-25-15 | Improvements to Road - MRL20-MDR-55 to Bittanakurke via Achenahalli,Kambadahalli. to 5.24 | 5.24 | 5.24 | | 22-07-2020 | 26-07-2022 | 734 | 7 |
| | 12551 | Tumkur | Sira | Pavagada | KN-25-16 | Improvements to Road - MRL07-Bellibatlu to chikkathimmanahatti via thimlapura,nidagallu,devrayanaroppa. to 9.23 | 9.23 | 9.23 | | 21-07-2020 | 03-06-2022 | 682 | 14 |
| | 12549 | Tumkur | Sira | Pavagada | KN-25-16 | Improvements to Road - MRL10-Hosadurga cross to SH-03 via potaganahalli, chikkahalli AKC to 5.69 | 5.69 | 5.69 | | 21-07-2020 | 03-06-2022 | 682 | 8 |
| | 12552 | Tumkur | Sira | Pavagada | KN-25-17 | Improvements to Road - MRL09-Y.N Hosakote to SH-03 via R.D Roppa,Dalavaihalli,Bheemanakunte,Thimmanahalli to 8.13 | 8.13 | 8.13 | | 21-08-2020 | 30-09-2022 | 770 | 11 |
| | 12550 | Tumkur | Sira | Pavagada | KN-25-17 | Improvements to Road - T16-Y.N Hosakote-Bestrahalli Road to A.P Border via Siddapura,Jalodu, chikkajalodu to 7.1 | 7.10 | 7.10 | | 21-08-2020 | 30-09-2022 | 770 | 9 |
| | 12555 | Tumkur | Sira | Sira | KN-25-18 | Improvements to Road - MRL18-SH-84 to Chikkagrahara via yaramadanahally,punajihally,Malanahally to 9.54 | 9.54 | 9.54 | | 21-08-2020 | 06-05-2024 | 1354 | 7 |
| | 12554 | Tumkur | Sira | Sira | KN-25-18 | Improvements to Road - MRL16-Doddagulla to Kallambella Bangalow via Kallipalya,Ganganahalli gollarahatti to 6.69 | 6.69 | 6.69 | | 21-08-2020 | 06-05-2024 | 1354 | 5 |
| | 12571 | Tumkur | Tumkur | C.N.Halli | KN-25-20 | Construction of Long span bridge - Construction of LongSpan Bridge to the Road Huliyar-Anekatte Road to NH234 Via Thimmalapura to 53.14 | 53.14 | 53.14 | | 19-06-2020 | 31-03-2021 | 285 | 186 |
| | 12530 | Tumkur | Tumkur | C.N.Halli | KN-25-20 | Improvements to Road - MRL02-Huliyar-Anekatte Road to NH234 Via Thimmalapura, Hosahalli palya and Hosahalli to 6.88 | 6.88 | 6.88 | | 19-06-2020 | 20-09-2023 | 1188 | 6 |
| | 12529 | Tumkur | Tumkur | C.N.Halli | KN-25-20 | Improvements to Road - MRL12-NH150 to SH47 Via Huliyar Amanikere, Y S Playa, Baradele Palya And Thammadihalli to 3.23 | 3.23 | 3.23 | | 19-06-2020 | 19-06-2024 | 1461 | 2 |
| | 12531 | Tumkur | Tumkur | C.N.Halli | KN-25-21 | Improvements to Road - MRL09-Kuppur to Ankasandra via Machasandra, Abbujihalli, Bevihalli Gate, Bevinahalli to 6.11 | 6.11 | 6.11 | | 15-01-2021 | 20-02-2023 | 766 | 8 |
| | 12572 | Tumkur | Tumkur | C.N.Halli | KN-25-21 | Construction of Long span bridge - Contruction of Longspan Bridge at ch. 6.75 km to the road Thammadihalli to Anksandra Via Abbujihalli to 42 | 42.00 | 42.00 | | 15-01-2021 | 24-08-2022 | 586 | 72 |
| | 12573 | Tumkur | Tumkur | C.N.Halli | KN-25-21 | Construction of Long span bridge - Contruction of Longspan Bridge at ch. 0.74 km to the road Thammadihalli to Anksandra Via Abbujihalli to 24 | 24.00 | 24.00 | | 15-01-2021 | 03-08-2023 | 930 | 26 |
| | 12532 | Tumkur | Tumkur | C.N.Halli | KN-25-22 | Improvements to Road - T01-Shettikere to NH150A Via Hosapalya , Kallubhavipalya ,Gantiganapalya, Thippanapalya, Chunganahalli,Masthayyanapalya and Malgondanahallli to 12.636 | 12.64 | 12.64 | | 14-08-2020 | 11-07-2022 | 696 | 18 |
| | 12560 | Tumkur | Tumkur | Tiptur | KN-25-23 | Improvements to Road - MRL02-Eachnur to Karadi Via Karadalu Sante Maidana, Kondlighatta,and Mallipatana to 6.66 | 6.66 | 6.66 | | 25-09-2020 | 30-06-2022 | 643 | 10 |
| | 12557 | Tumkur | Tumkur | Tiptur | KN-25-24 | Improvements to Road - MRL14-YT Road to SH 47 Via Honnenahally, Bochihally, Sugur, and Mathigatta to 5.57 | 5.57 | 5.57 | | 04-08-2020 | 30-10-2021 | 452 | 12 |
| | 12558 | Tumkur | Tumkur | Tiptur | KN-25-24 | Improvements to Road - MRL05-NH 206 to Kotigehally Via Kuppuru, Shettihally, Ballekatte, Uppinahally and Ginikikere. to 5.75 | 5.75 | 5.75 | | 04-08-2020 | 31-12-2022 | 879 | 7 |
| | 12561 | Tumkur | Tumkur | Tiptur | KN-25-25 | Improvements to Road - MRL27-Kasavanahally to MDR Via H Janatha Colony, and Hullenahalli to 5.73 | 5.73 | 5.73 | | 09-12-2020 | 12-07-2022 | 580 | 10 |
| | 12559 | Tumkur | Tumkur | Tiptur | KN-25-25 | Improvements to Road - MRL16-Bommenahally to Halkurki via Kalammanagudda, Bommenahally L.Thandya, Lambanitandya, Muddenahalli Thandya,and Muddenahalli. H to 4.89 | 4.89 | 4.89 | | 09-12-2020 | 15-11-2022 | 706 | 7 |
| | 12569 | Tumkur | Tumkur | Turuvekere | KN-25-26 | Improvements to Road - MRL10-Sarigehalli to Harenahalli- Kallur Road MDR via Hattihalli and Muslim colony to 6.808 | 6.81 | 6.81 | | 25-09-2020 | 16-06-2023 | 994 | 7 |
| | 12570 | Tumkur | Tumkur | Turuvekere | KN-25-26 | Improvements to Road - MRL07-NH 150A near Banasandra to Neergunda via Venkatapura. to 5.25 | 5.25 | 5.25 | | 25-09-2020 | 16-06-2023 | 994 | 5 |
| | 12567 | Tumkur | Tumkur | Turuvekere | KN-25-27 | Improvements to Road - MRL19-Taluk border to NH150A via Anekere Thore mavinahalli and Bhuvanalli to 3.72 | 3.72 | 3.72 | | 12-08-2020 | 29-02-2024 | 1296 | 3 |
| | 12568 | Tumkur | Tumkur | Turuvekere | KN-25-27 | Improvements to Road - MRL17-VR 252 (Nagalapura road) to NH150 A via Beediganahalli to 6.11 | 6.11 | 6.11 | | 12-08-2020 | 29-02-2024 | 1296 | 5 |
| | 12563 | Tumkur | Tumkur | Tumkur | KN-25-28 | Improvements to Road - MRL27-Bugudanahalli to NH-206 via Mudigere, Doddanaravangala and Peramanahalli to 6.565 | 6.57 | 6.57 | | 23-09-2020 | 25-07-2022 | 670 | 10 |
| | 12566 | Tumkur | Tumkur | Tumkur | KN-25-28 | Improvements to Road - MRL01-Kumkumanahalli to Bellavi via Heggere, Mudigere, Ballapura, Singrihalli to 9.678 | 9.68 | 9.68 | | 23-09-2020 | 10-07-2024 | 1386 | 7 |
| | 12562 | Tumkur | Tumkur | Tumkur | KN-25-29 | Improvements to Road - MRL20-NHS Road-Bommanahalli Cross ViaKurgunda,Vardnahali,Kalipalya to 3.768 | 3.77 | 3.77 | | 14-08-2020 | 26-11-2021 | 469 | 8 |
| | 12564 | Tumkur | Tumkur | Tumkur | KN-25-29 | Improvements to Road - MRL13-Chikkathotlukere to SH33 via Bommanahalli, Beladhara, Ahobalagrahara and M.Gollahalli to 5.512 | 5.51 | 5.51 | | 14-08-2020 | 10-07-2024 | 1426 | 4 |
| | 12565 | Tumkur | Tumkur | Tumkur | KN-25-29 | Improvements to Road - MRL11-Machagondanahalli to Pandithanahalli Hand Post via Kesaramadu and K.Palasandra to 3.97 | 3.97 | 3.97 | | 14-08-2020 | 30-09-2021 | 412 | 10 |
| | 12538 | Tumkur | Tumkur | Kunigal | KN-25-30 | Improvements to Road - MRL15-Ujjani Huliyurdurga Road to SH-33 via Anathihalli and Rajendrapura to 5.61 | 5.61 | 5.61 | | 31-07-2020 | 25-07-2022 | 724 | 8 |
| | 12541 | Tumkur | Tumkur | Kunigal | KN-25-30 | Improvements to Road - MRL08-Chowdanakuppe - Tavarekere SH to Bestarapalya via Ankanahalli and R.Byadarahalli to 3.807 | 3.81 | 3.81 | | 31-07-2020 | 28-08-2023 | 1123 | 3 |
| | 12542 | Tumkur | Tumkur | Kunigal | KN-25-30 | Improvements to Road - MRL14-Kenkere to Doddakoppalu via Byranayakanahalli to 3.81 | 3.81 | 3.81 | | 31-07-2020 | 30-09-2021 | 426 | 9 |
| | 12539 | Tumkur | Tumkur | Kunigal | KN-25-31 | Improvements to Road - MRL10-Yeliyur to NH-48 via Alkere and Kallanayakanahalli to 3.9 | 3.90 | 3.90 | | 31-07-2020 | 25-07-2022 | 724 | 5 |
| | 12540 | Tumkur | Tumkur | Kunigal | KN-25-31 | Improvements to Road - MRL09-NH-48 (Arasarapalya) to Hucchanabhavi Road via Mavinakatte and Nelathanahalli to 5.92 | 5.92 | 5.92 | | 31-07-2020 | 25-07-2022 | 724 | 8 |
| | 12543 | Tumkur | Tumkur | Kunigal | KN-25-31 | Improvements to Road - MRL17-Shettibidu to Venkatareddipalya via Hosur to 5.322 | 5.32 | 5.32 | | 31-07-2020 | 28-08-2023 | 1123 | 5 |
| | 12574 | Tumkur | Tumkur | Turuvekere | KN-25-32 | Construction of Long span bridge - CONSTRUCTION OF BOX TYPE BRIDGE AT CH 60M OF ROAD JOINING HAMPLAPURA MDR TO TALUK BORDER VIA SAMPIGE to 16.7 | 16.70 | 16.70 | | 01-12-2020 | 23-05-2021 | 173 | 97 |
| | 12575 | Tumkur | Tumkur | Turuvekere | KN-25-32 | Construction of Long span bridge - CONSTRUCTION OF BOX TYPE BRIDGE AT CH1530M OF ROAD JOINING HAMPLAPURA MDR TO TALUK BORDRVIA SAMPIGE to 16.7 | 16.70 | 16.70 | | 01-12-2020 | 12-07-2021 | 223 | 75 |
| | 12978 | Tumkur | Sira | Turuvekere | KN-25-33 | Improvements to Road - MRL06-Hamplpura MDR to Gubbi Taluk border via SAmpige and ontipalya to 4.36 | 4.36 | 4.36 | B T SURESH | 13-07-2021 | 20-09-2023 | 799 | 5 |
| | 12980 | Tumkur | Sira | Gubbi | KN-25-34 | Improvements to Road - MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli. to 5.94 | 5.94 | 5.94 | T L Ashok | 25-06-2021 | 30-10-2021 | 127 | 47 |
| | 12979 | Tumkur | Sira | Gubbi | KN-25-34 | Improvements to Road - MRL20-TCB Road( Byadanakatte Gate) to SH-84 (Anthapura) Via Dibbadahatti, Nallur. to 3.37 | 3.37 | 3.37 | T L Ashok | 25-06-2021 | 04-05-2022 | 313 | 11 |
| | 12982 | Tumkur | Sira | Gubbi | KN-25-35 | Improvements to Road - MRL03-Nittur - Sampige Road to Kadaba Via Nandihalli, Hosahatti and B.Hosapalya to 3.07 | 3.07 | 3.07 | SANIVARAPU NARAYANA REDDY ( Ms S NARAYANA REDDY ) | 06-07-2021 | 13-01-2023 | 556 | 6 |
| | 12981 | Tumkur | Sira | Gubbi | KN-25-35 | Improvements to Road - MRL17-Galaga to Adaguru-Kadaba Road(MDR) Via Muddanahalli, Dodderi, G.Hosahalli. to 9.2 | 9.20 | 9.20 | SANIVARAPU NARAYANA REDDY ( Ms S NARAYANA REDDY ) | 06-07-2021 | 20-09-2023 | 806 | 11 |
| | 12983 | Tumkur | Sira | Gubbi | KN-25-36 | Improvements to Road - MRL07-N.H 206 (Kundaranahalli Gate) to Bhogasandra (MDR) Via Adalagere, Sagasandra, Bandanahalli to 11 | 11.00 | 11.00 | T L RAJENDRAN | 25-06-2021 | 17-06-2023 | 722 | 15 |
| | 14745 | Tumkur | Tumkur | C.N.Halli | KN-25-37 | Improvements to road from MRL07-Chikkanayakanahalli - Mattighatta -kannkatte Road to Chikkanayakanahalli Via Savashettihalli , Maligehalli and Bylakere in Chikkanayakanahalli Taluka of Tumkur District | 3.10 | 3.10 | K.S SANTHOSH | 28-03-2023 | 31-03-2024 | 369 | 8 |
| | 14744 | Tumkur | Tumkur | Tiptur | KN-25-38 | Improvements to road from MRL17-Halkurke to Shettikere via Halkurke Kaval, Doddikatte, and Makvalli Gollarahatti in Tiptur Taluka of Tumkur District | 8.86 | 8.86 | SREEKANTESHWARA CONSTRUCTIONS AND PVT LTD | 28-03-2023 | 28-02-2024 | 337 | 26 |
| | 14489 | Tumkur | Tumkur | Tiptur | KN-25-39 | Improvements to road from MRL15-Honavalli to Chikka Honavalli Gate Via Gyarghatta, Chowdenahally, Hanumanthapura, and Suranahally in in Tiptur Taluk of Tumkur District | 4.82 | 4.82 | Sri.B.R Sreekantamurthy | 28-03-2023 | 28-02-2024 | 337 | 14 |
| | 12229 | Udupi | Udupi | Karkala | KN-26-10 | Improvements to Road - MRL13-Mulladka to Kanjarkatta road to 6.14 | 6.14 | 6.14 | | 01-07-2020 | 31-12-2021 | 548 | 11 |
| | 12230 | Udupi | Udupi | Karkala | KN-26-11 | Improvements to Road - MRL20-Banglegudde to Battahole road to 8.22 | 8.22 | 8.22 | | 01-07-2020 | 31-12-2021 | 548 | 15 |
| | 12231 | Udupi | Udupi | Karkala | KN-26-12 | Improvements to Road - MRL08-Uddapalke to Malanthaguttu road via Pelathaje to 10 | 10.00 | 10.00 | | 07-07-2020 | 31-12-2021 | 542 | 18 |
| | 12234 | Udupi | Udupi | Karkala | KN-26-13 | Construction of Long span bridge - Mudrady to Uppala Bridge to 55 | 55.00 | 55.00 | | 11-08-2020 | 30-04-2021 | 262 | 210 |
| | 12232 | Udupi | Udupi | Kundapura | KN-26-14 | Improvements to Road - MRL13-Albady proper, Maruru to Kodabailu road to 4.197 | 4.20 | 4.20 | | 09-07-2020 | 15-12-2021 | 524 | 8 |
| | 12233 | Udupi | Udupi | Kundapura | KN-26-15 | Improvements to Road - MRL27-Salkodu to Moodabage via mardi road to 7.67 | 7.67 | 7.67 | | 30-07-2020 | 01-01-2022 | 520 | 15 |
| | 12235 | Udupi | Udupi | Kundapura | KN-26-16 | Construction of Long span bridge - Maruru Bridge to 120 | 120.00 | 120.00 | | 27-07-2020 | 15-12-2021 | 506 | 237 |
| | 12236 | Udupi | Udupi | Kundapura | KN-26-17 | Construction of Long span bridge - Kuntuhole Bridge to 30 | 30.00 | 30.00 | | 10-08-2020 | 15-12-2021 | 492 | 61 |
| | 12237 | Udupi | Udupi | Udupi | KN-26-18 | Construction of Long span bridge - Kunthalanagara Bridge to 95 | 95.00 | 95.00 | | 30-06-2020 | 31-05-2022 | 700 | 136 |
| | 13038 | Udupi | Udupi | Karkala | KN-26-19 | Improvements to Road - MRL21-Mudrady to Uppala road to 4.59 | 4.59 | 4.59 | JEEVANSHETTY | 05-07-2021 | 31-01-2022 | 210 | 22 |
| | 13039 | Udupi | Udupi | Karkala | KN-26-20 | Improvements to Road - MRL05-Palli to Kanajar Guddeyangady road via Ranganapalke Kanjar to 7.82 | 7.82 | 7.82 | DINESH HEGDE | 02-07-2021 | 28-02-2022 | 241 | 32 |
| | 13040 | Udupi | Udupi | Karkala | KN-26-21 | Improvements to Road - MRL09-Jarkala Katande to Korala road via Kantharagoly to 8.2 | 8.20 | 8.20 | DINESH HEGDE | 02-07-2021 | 28-02-2022 | 241 | 34 |
| | 13033 | Udupi | Udupi | Kundapura | KN-26-22 | Improvements to Road - MRL06-Bantwady to Harkuru proper via Bellady to 7.03 | 7.03 | 7.03 | M/s G D THIMAPPA SHEREGAR | 31-07-2021 | 30-06-2022 | 334 | 21 |
| | 13034 | Udupi | Udupi | Kundapura | KN-26-23 | Improvements to Road - MRL25-Battabail, Mudumunda to Chapparaka Kadali via Halady road to 3.07 | 3.07 | 3.07 | M/s PHILIP D COSTA AND CO | 22-07-2021 | 05-03-2022 | 226 | 14 |
| | 13035 | Udupi | Udupi | Kundapura | KN-26-24 | Improvements to Road - MRL24-Hosangadi proper to Kerekatte via Hosabalu , karuru road to 4.325 | 4.32 | 4.32 | SADANANDA SHETTY K | 23-07-2021 | 05-03-2022 | 225 | 19 |
| | 13036 | Udupi | Udupi | Kundapura | KN-26-25 | Improvements to Road - MRL02-Yojananagara to Thoodalli road via Maddodi, Nagaramakki to 3.8 | 3.80 | 3.80 | SURYANNA SHETTY | 07-06-2021 | 15-01-2022 | 222 | 17 |
| | 13037 | Udupi | Udupi | Kundapura | KN-26-26 | Improvements to Road - MRL05-Badapede , Guddeyangadi , to Mayabazar via Kuntuhole road to 5.3 | 5.30 | 5.30 | Unique Constructions | 05-07-2021 | 25-05-2022 | 324 | 16 |
| | 13050 | Udupi | Udupi | Udupi | KN-26-27 | Improvements to Road - MRL88-Kunjalu to Jarijaddu road via Devastana bettu, Neelavara temple road to | 8.55 | 8.55 | JEEVANSHETTY | 11-06-2021 | 31-01-2022 | 234 | 37 |
| | 13049 | Udupi | Udupi | Udupi | KN-26-28 | Improvements to Road - MRL87-Herooru Dhoopadakatte to Harady JHC via Honnala road to | 4.30 | 4.30 | SURESH R SHETTY | 02-08-2023 | 01-07-2024 | 334 | 13 |
| | 13044 | Udupi | Udupi | Udupi | KN-26-29 | Improvements to Road - MRL43-Kunthalanagara Via Madhavanagara to Bantakallu to | 6.36 | 6.36 | M/s USK CONSTRUCTION COMPANY DP | 19-06-2021 | 31-12-2022 | 560 | 11 |
| | 13045 | Udupi | Udupi | Udupi | KN-26-30 | Improvements to Road - MRL31-Bommarbettu Garadi Via Indiranagara to MDR Road to | 6.07 | 6.07 | JEEVANSHETTY | 28-07-2021 | 30-06-2022 | 337 | 18 |
| | 13043 | Udupi | Udupi | Udupi | KN-26-31 | Improvements to Road - MRL42-Mandarthi, Padukadur, Vani School to Guddeangadi to | 6.50 | 6.50 | JEEVANSHETTY | 11-06-2021 | 10-05-2022 | 333 | 20 |
| | 13051 | Udupi | Udupi | Udupi | KN-26-32 | Improvements to Road - MRL89-Thanda-kokkarne-Jarijeddu to Cherkady road to 8.11 | 8.11 | 8.11 | JEEVANSHETTY | 05-07-2021 | 30-09-2022 | 452 | 18 |
| | 13046 | Udupi | Udupi | Udupi | KN-26-33 | Improvements to Road - MRL11-Athradi JHC to Angadibettu to 6.58 | 6.58 | 6.58 | UMESH SHETTY | 17-08-2021 | 31-07-2022 | 348 | 19 |
| | 13048 | Udupi | Udupi | Udupi | KN-26-34 | Improvements to Road - MRL36-NH-Uddinahithlu to Thottam to | 3.55 | 3.55 | SURESH R SHETTY | 09-08-2021 | 09-07-2022 | 334 | 11 |
| | 13047 | Udupi | Udupi | Udupi | KN-26-35 | Improvements to Road - MRL21-Padubidre (Panchakere) to Nandikoor to | 8.07 | 8.07 | SURESH R SHETTY | 09-08-2021 | 15-11-2022 | 463 | 17 |
| | 13052 | Udupi | Udupi | Karkala | KN-26-36 | Construction of Long span bridge - Jarkala Katande to Korala road via Kantharagoly Bridge to 16 | 16.00 | 16.00 | KISHORE KUMAR | 03-07-2021 | 31-05-2022 | 332 | 48 |
| | 13053 | Udupi | Udupi | Karkala | KN-26-36 | Construction of Long span bridge - Jarkala Katande to Korala road via Kantharagoly Bridge 2 (16 mtr) to 16 | 16.00 | 16.00 | KISHORE KUMAR | 03-07-2021 | 15-03-2022 | 255 | 63 |
| | 13054 | Udupi | Udupi | Karkala | KN-26-37 | Construction of Long span bridge - Banglegudde to Battahole Bridge to 24 | 24.00 | 24.00 | KISHORE KUMAR | 22-06-2021 | 10-03-2022 | 261 | 92 |
| | 13042 | Udupi | Udupi | Karkala | KN-26-38 | Improvements to Road - MRL12-Nitte lemina cross road to | 5.05 | 5.05 | VADIRAJA SHETTY | 28-06-2021 | 28-02-2022 | 245 | 21 |
| | 13041 | Udupi | Udupi | Karkala | KN-26-39 | Improvements to Road - MRL16-Kariyakallu to Gundaje Irvathuru road to 5 | 5.00 | 5.00 | M/S KARLA CONSTRUCTIONS | 17-06-2021 | 28-02-2022 | 256 | 20 |
| | 12592 | Uttara Kannada | Karwar | Sirsi | KN-27-13 | Improvements to Road - MRL26-Dasanakoppa to Kandraji via Danaganahalli, Kotekoppa, Ummadi, Bankanal to 10.35 | 10.35 | 10.35 | | 03-09-2020 | 31-12-2021 | 484 | 21 |
| | 12593 | Uttara Kannada | Karwar | Sirsi | KN-27-13 | Improvements to Road - MRL02-Ganeshnagar to Neeranalli Via Andalli to 3.115 | 3.12 | 3.12 | | 03-09-2020 | 01-03-2021 | 179 | 17 |
| | 12588 | Uttara Kannada | Karwar | Siddapura | KN-27-14 | Improvements to Road - MRL05-Hale Bedkani to Halageri-Adukatta (MDR)Road via Kumbarakuli, Sunkatti, Sullurkeri to 5.98 | 5.98 | 5.98 | | 03-09-2020 | 02-08-2021 | 333 | 18 |
| | 12590 | Uttara Kannada | Karwar | Siddapura | KN-27-14 | Improvements to Road - MRL08-Mensi -Vandane road to Kudegod via Jigalemane, Karibal, Anagal to 4.66 | 4.66 | 4.66 | | 03-09-2020 | 02-08-2021 | 333 | 14 |
| | 12591 | Uttara Kannada | Karwar | Siddapura | KN-27-15 | Improvements to Road - MRL07-Koppanakeri to NH via Algod, Tulakalmane cross, Kodagibaile crooss, Mandagalale, Hemtemane to 5.2 | 5.20 | 5.20 | | 03-09-2020 | 31-12-2021 | 484 | 11 |
| | 12589 | Uttara Kannada | Karwar | Siddapura | KN-27-15 | Improvements to Road - MRL02-Guntekodlu to Siddapura-Talaguppa road via Mandagalale, Nipli, Arendur to 9.1 | 9.10 | 9.10 | | 03-09-2020 | 31-12-2021 | 484 | 19 |
| | 12584 | Uttara Kannada | Karwar | Karwar | KN-27-16 | Improvements to Road - MRL05-Devalmakki to Soregadde Siddarameshwar temple Via SH-6, Konkangadde,Shirve to 6.2 | 6.20 | 6.20 | | 11-08-2020 | 31-05-2022 | 658 | 9 |
| | 12581 | Uttara Kannada | Karwar | Honnavara | KN-27-17 | Improvements to Road - MRL32-MDR Basti to Hesige via neeragai , jinbail , Bettanakeri , Kulgaar , Heggar to 7.3 | 7.30 | 7.30 | | 05-08-2020 | 20-02-2023 | 929 | 8 |
| | 12582 | Uttara Kannada | Karwar | Honnavara | KN-27-17 | Improvements to Road - MRL24-NH-206 to Kembal , Halli Gatte Road to 6.7 | 6.70 | 6.70 | | 05-08-2020 | 20-02-2023 | 929 | 7 |
| | 12577 | Uttara Kannada | Karwar | Bhatkal | KN-27-18 | Improvements to Road - MRL23-Murudeshwar Harikantrakeri to NH-66 Neeragadde Crossing NH-66 Yedabadru Muragoli Kalika Temple Via Tudalli Village to 6.78 | 6.78 | 6.78 | | 05-08-2020 | 31-05-2023 | 1029 | 7 |
| | 12578 | Uttara Kannada | Karwar | Bhatkal | KN-27-18 | Improvements to Road - MRL21-Bhatkal -Sagar SH Murukodi to Hudir village Primary school Via Hudeel , Gandalagi , Murkodikeri,Marathikeri to 11.09 | 11.09 | 11.09 | | 05-08-2020 | 31-05-2023 | 1029 | 11 |
| | 12595 | Uttara Kannada | Karwar | Yellapura | KN-27-19 | Improvements to Road - MRL96-Tukadbail to Hulagod Via Jogabhattarkeri to 5.99 | 5.99 | 5.99 | | 21-08-2020 | 30-03-2022 | 586 | 10 |
| | 12594 | Uttara Kannada | Karwar | Yellapura | KN-27-19 | Improvements to Road - MRL08-Kumbri to Upaleshwar to 6.52 | 6.52 | 6.52 | | 21-08-2020 | 30-03-2022 | 586 | 11 |
| | 12586 | Uttara Kannada | Karwar | Mundagod | KN-27-20 | Improvements to Road - MRL25-GUNJAVATHI TO UMMACHAGI-KATUR ROAD (MDR) to 8.5 | 8.50 | 8.50 | | 12-08-2020 | 30-03-2022 | 595 | 14 |
| | 12587 | Uttara Kannada | Karwar | Mundagod | KN-27-20 | Improvements to Road - MRL18-Tenkal cross(MDR) to (Mavinakatta)taluka Boundary VIA Ummachagi to 5.74 | 5.74 | 5.74 | | 12-08-2020 | 30-03-2022 | 595 | 10 |
| | 12579 | Uttara Kannada | Karwar | Haliyal | KN-27-21 | Improvements to Road - MRL16-Golehalli to Banasgeri via Joganakoppa to 5.87 | 5.87 | 5.87 | | 19-08-2020 | 30-03-2022 | 588 | 10 |
| | 12580 | Uttara Kannada | Karwar | Haliyal | KN-27-21 | Improvements to Road - MRL19-Pala mangalwad to Hunsawad village via Malawad to 6.32 | 6.32 | 6.32 | | 19-08-2020 | 30-03-2022 | 588 | 11 |
| | 12596 | Uttara Kannada | Karwar | Haliyal | KN-27-21 | Construction of Long span bridge - Construction of Bridge at Ch 5.30 km in MRL16-Golehalli to Banasgeri via Joganakoppa to 38.2 | 38.20 | 38.20 | | 19-08-2020 | 31-03-2022 | 589 | 65 |
| | 12583 | Uttara Kannada | Karwar | Joida/ Supa) | KN-27-22 | Improvements to Road - MRL18-Godshet to Tellolli via Kumbarwada to 6.16 | 6.16 | 6.16 | | 14-08-2020 | 29-06-2024 | 1415 | 4 |
| | 12576 | Uttara Kannada | Karwar | Ankola | KN-27-23 | Improvements to Road - MRL16-Taribail to Agragone Joog via Bolkunte, Sagadgeri , Bailkeri, Hegre , Totadkeri, Adigone. to 8.27 | 8.27 | 8.27 | | 11-08-2020 | 15-12-2021 | 491 | 17 |
| | 12585 | Uttara Kannada | Karwar | Kumta | KN-27-24 | Improvements to Road - MRL01-SH 48 to SH 48 via Hegle,Goudgalkoppa,Gowdrukeri,Bachkanda,Kelaginkeri,Kelaginkoppa to 5.23 | 5.23 | 5.23 | | 05-08-2020 | 31-05-2022 | 664 | 8 |
| | 13920 | Uttara Kannada | Karwar | Kumta | KN27-35 | MRL06-Hositla to VR 546 via Goliteppa, Janathacolony,Gangekolla,Nadumaskeri | 4.84 | 4.84 | GANESH DEVAPPA NAIK | 24-06-2021 | 20-02-2023 | 606 | 8 |
| | 14369 | Uttara Kannada | Karwar | Sirsi | KN27-37 | construction of LSB MRL28 Vanalli to Dhorangiri cross via karadigitti Dhorangiri Hegormane Mundagemane Kakkalli construction of Deck slab bridge 8m x 4.5m 2vent at ch 6.60km in sirsi taluka uttarakannada district | 0.00 | 0.00 | Sri Gajanan J Naik | 15-09-2022 | 26-04-2024 | 589 | 0 |
| | 14371 | Uttara Kannada | Karwar | Sirsi | KN-27-38 | Improvements to Road - MRL30-Vanalli to Ankola Taluka border via Muski, Nachigadde to 12.71 | 12.71 | 12.71 | ISHWAR SHAMBU HEGDE | 28-03-2023 | 26-04-2024 | 395 | 32 |
| | 13487 | Ramanagara | Bangalore Rural | Channapatna | KN-28-10 | Narayanadoddi to Byrapatna Iggalur MDR | 5.18 | 5.18 | G.H.Nagaraj | 15-07-2021 | 06-06-2023 | 691 | 7 |
| | 13486 | Ramanagara | Bangalore Rural | Channapatna | KN-28-10 | Ramanathapura to Mylanayakanahallli Nagawara-Dasawara road | 8.80 | 8.80 | G.H.Nagaraj | 15-07-2021 | 06-06-2023 | 691 | 13 |
| | 13488 | Ramanagara | Bangalore Rural | Ramanagar | KN-28-11 | Thirumalegoudana Doddi To SH Via Jalamangla | 3.93 | 3.93 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-05-2024 | 1036 | 4 |
| | 13489 | Ramanagara | Bangalore Rural | Ramanagar | KN-28-11 | Bidadi Harohalli MDR to Bychohalli | 5.68 | 5.68 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-05-2024 | 1036 | 5 |
| | 13490 | Ramanagara | Bangalore Rural | Ramanagar | KN-28-12 | Gangarajanahalli To NH | 4.74 | 4.74 | G.H.Nagaraj | 15-07-2021 | 22-09-2023 | 799 | 6 |
| | 13491 | Ramanagara | Bangalore Rural | Ramanagar | KN-28-12 | vaddaradoddi to SH via vijayapura, gollaradoddi, jayapura | 4.30 | 4.30 | G.H.Nagaraj | 15-07-2021 | 31-03-2023 | 624 | 7 |
| | 13497 | Ramanagara | Bangalore Rural | Kanakpur | KN-28-13 | Kuthidimba to Muradi hosahalli via Kurubarahalli | 5.76 | 5.76 | V.Prakash Reddy | 15-07-2021 | 31-10-2024 | 1204 | 5 |
| | 13492 | Ramanagara | Bangalore Rural | Kanakpur | KN-28-13 | Hanumanahalli to Yeduvanahalli via Kalegowdanadoddi, Madaiahnadoddi | 3.57 | 3.57 | V.Prakash Reddy | 15-07-2021 | 30-06-2024 | 1081 | 3 |
| | 13493 | Ramanagara | Bangalore Rural | Bidar | KN-28-13 | Hanumanahalli to Thenganaikanahalli via Gerahalli | 8.25 | 8.25 | V.Prakash Reddy | 15-07-2021 | 14-03-2024 | 973 | 8 |
| | 13495 | Ramanagara | Bangalore Rural | Kanakpur | KN-28-13 | Hanumanahalli to Thenganaikanahalli via Gerahalli | 8.25 | 8.25 | V.Prakash Reddy | 15-07-2021 | 05-01-2026 | 1635 | 5 |
| | 13498 | Ramanagara | Bangalore Rural | Kanakpur | KN-28-14 | Kodihalli to Mallapura via Hosadoddi | 3.21 | 3.21 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 30-04-2024 | 1005 | 3 |
| | 13499 | Ramanagara | Bangalore Rural | Kanakpur | KN-28-14 | Thokanayakanahalli to Kadledoddi via Basavalingappanadoddi | 3.79 | 3.79 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 30-04-2024 | 1005 | 4 |
| | 13500 | Ramanagara | Bangalore Rural | Kanakpur | KN-28-14 | Dalimba to Sasalapura via Sambegowdanadoddi | 3.70 | 3.70 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 30-04-2024 | 1005 | 4 |
| | 13502 | Ramanagara | Bangalore Rural | Magadi | KN-28-15 | Kuduru Shivagange MDR to Veerapura via Kagimadu Adarangi | 6.60 | 6.60 | C.Narayan | 05-08-2021 | 15-03-2025 | 1318 | 5 |
| | 13501 | Ramanagara | Bangalore Rural | Magadi | KN-28-15 | Beechanahalli-Jagganapalya to Hullenahalli via Mandaripalya, Kodihalli, Biskuru, Hosapalya, Kukkepalya | 3.35 | 3.35 | C.Narayan | 05-08-2021 | 31-03-2025 | 1334 | 3 |
| | 14484 | Ramanagara | Bangalore Rural | Channapatna | KN-28-153 | MRL-15 BagepalliHalaguru SH to NH 275 via lalaghatta | 4.19 | 4.19 | M C MAHESH | 29-03-2023 | 31-03-2025 | 733 | 6 |
| | 14485 | Ramanagara | Bangalore Rural | Channapatna | KN-28-154 | T01-Kengal Bevoor MDR to MB halli via Devarahosahalli mogenahalli
| 6.65 | 6.65 | M C MAHESH | 29-03-2023 | 05-01-2026 | 1013 | 7 |
| | 13503 | Ramanagara | Bangalore Rural | Magadi | KN-28-16 | SH Sugganahalli to Chowdibeguru via Kenkere, Kannuru | 4.01 | 4.01 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-05-2024 | 1036 | 4 |
| | 13504 | Ramanagara | Bangalore Rural | Magadi | KN-28-16 | Kumbarapalya to Chikkahalli via Ganganahalli Basavanapalya | 3.03 | 3.03 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-07-2024 | 1097 | 3 |
| | 13505 | Ramanagara | Bangalore Rural | Magadi | KN-28-16 | Ganganahalli to Mayasandra via Tavarekere, Channabairappanapalya | 3.51 | 3.51 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-05-2024 | 1036 | 3 |
| | 13507 | Ramanagara | Bangalore Rural | Magadi | KN-28-17 | SH To MDR(Kunigal Magadi) Via Upparath | 5.83 | 5.83 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-05-2024 | 1036 | 6 |
| | 13506 | Ramanagara | Bangalore Rural | Magadi | KN-28-17 | Seegekuppe To Chakrabhavi Via Hagalakuppe,Honnaiahanapalya | 5.20 | 5.20 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-05-2024 | 1036 | 5 |
| | 13508 | Ramanagara | Bangalore Rural | Magadi | KN-28-17 | Muthana palya To NH 75 Via Doddamudigere Siddapura | 3.41 | 3.41 | K.P.J.Construction (K.Prakash) | 30-07-2021 | 31-05-2024 | 1036 | 3 |
| | 12448 | Yadgir | Kalaburgi | Shorapur | KN-30-01 | Improvements to Road - MRL01-Kudlagi to Mudnoor K to 8.14 | 8.14 | 8.14 | | 04-08-2020 | 30-09-2021 | 422 | 19 |
| | 12449 | Yadgir | Kalaburgi | Shorapur | KN-30-02 | Improvements to Road - MRL13-Budihal To Bapparga Via Horatti to 7.63 | 7.63 | 7.63 | | 12-08-2020 | 30-12-2021 | 505 | 15 |
| | 12450 | Yadgir | Kalaburgi | Shorapur | KN-30-03 | Improvements to Road - MRL03-Pet Ammapur to Godrihal Road VIa Jaibenchi Chigrihal to 9.49 | 9.49 | 9.49 | | 27-07-2020 | 24-11-2021 | 485 | 20 |
| | 12445 | Yadgir | Kalaburgi | Shahpur | KN-30-04 | Improvements to Road - MRL01-Haranagera to Maddaraki Via Gogi(P) to 13.63 | 13.63 | 13.63 | | 10-07-2020 | 31-10-2021 | 478 | 29 |
| | 12446 | Yadgir | Kalaburgi | Shahpur | KN-30-05 | Improvements to Road - MRL03-SH-16 to Hoskera Via Rabbanalli Karkalli Rajapur to 8.35 | 8.35 | 8.35 | | 10-07-2020 | 31-10-2021 | 478 | 17 |
| | 12447 | Yadgir | Kalaburgi | Shahpur | KN-30-06 | Improvements to Road - MRL02-Saidapur to Sagar to 8 | 8.00 | 8.00 | | 10-07-2020 | 31-10-2021 | 478 | 17 |
| | 12272 | Chikballapur | Chikballapur | Bagepalli | KN-30-12 | Improvements to Road - MRL02-Madakavaripalli to Billur to 10.171 | 10.17 | 10.17 | | 20-08-2020 | 12-07-2021 | 326 | 31 |
| | 12273 | Chikballapur | Chikballapur | Bagepalli | KN-30-13 | Improvements to Road - T01-Pathapalya to Pollanayakanahalli Via Kamsanapalli peddanagurlu to 15.272 | 15.27 | 15.27 | | 17-08-2020 | 16-08-2023 | 1094 | 14 |
| | 12289 | Chikballapur | Chikballapur | Chickballapur | KN-30-14 | Improvements to Road - MRL10-NH-234 To Kandakkanahalli Via Yennur Kadirenahalli to 5.782 | 5.78 | 5.78 | | 01-10-2020 | 30-08-2021 | 333 | 17 |
| | 12287 | Chikballapur | Chikballapur | Chickballapur | KN-30-14 | Improvements to Road - MRL08-Gundlagurki Cross To Dibbur Via Akkalathimmanahalli, Devastanahosahalli, Soppahalli, Puradagadde to 9.552 | 9.55 | 9.55 | | 01-10-2020 | 30-01-2023 | 851 | 11 |
| | 12288 | Chikballapur | Chikballapur | Chickballapur | KN-30-15 | Improvements to Road - MRL04-NH-7 To Kethenahalli MDR Via Kalukunte Ittapanahalli And Mogalaguppe Gollahalli to 6.876 | 6.88 | 6.88 | | 10-08-2020 | 09-01-2022 | 517 | 13 |
| | 12274 | Chikballapur | Chikballapur | Chickballapur | KN-30-15 | Improvements to Road - MRL06-NH-234 To Bannikuppe Via Mannarapura Ajjavara to 6.637 | 6.64 | 6.64 | | 10-08-2020 | 09-01-2022 | 517 | 13 |
| | 13622 | Yadgir | Kalaburgi | Yadgiri | KN-30-15 | Improvements to Road - MRL09-Koilur to Helgera to 4.065 | 4.07 | 4.07 | MAHADEVAPPA YELSATTI | | 30-12-2022 | | |
| | 12295 | Chikballapur | Chikballapur | Gowribidanur | KN-30-16 | Improvements to Road - MRL07-SH(Near Gollachinnenahalli) To Anegambarayaswamy Temple Via Narasapura Gullaganjihalli Dasarenahalli to 8.95 | 8.95 | 8.95 | | 20-07-2020 | 05-03-2022 | 593 | 15 |
| | 12293 | Chikballapur | Chikballapur | Gowribidanur | KN-30-16 | Improvements to Road - MRL02-Alkapura gate To SH-94 Via Alkapura, Doddahanumenahalli, Bhumenahalli to 4.207 | 4.21 | 4.21 | | 20-07-2020 | 11-01-2023 | 905 | 5 |
| | 12294 | Chikballapur | Chikballapur | Gowribidanur | KN-30-17 | Improvements to Road - MRL12-Manchenahalli Thondebavi Road To near Beeramangala via Channabyranahalli, Rayarekalahalli, Bajjeranagenahalli, Mavinakayalahalli, Arkunda to 13.211 | 13.21 | 13.21 | | 05-09-2020 | 15-03-2024 | 1287 | 10 |
| | 12297 | Chikballapur | Chikballapur | Gudibanda | KN-30-18 | Improvements to Road - MRL04-From NH to B.B.Road via Yarralakkenahalli, Bhogenahalli, Thirumani, Katenahalli, Mittemari Road to 9.668 | 9.67 | 9.67 | | 13-04-2022 | 12-03-2023 | 333 | 29 |
| | 12296 | Chikballapur | Chikballapur | Gudibanda | KN-30-19 | Improvements to Road - T01-MDR to Paragodu via Bathalahalli, Dapparthi, Gavikuntahalli, Adinaraganahalli, Hampasandra, Bagepalli Taluk Yandrakayalapalli, Devireddypalli to 15.424 | 15.42 | 15.42 | | 14-08-2020 | 27-04-2022 | 621 | 25 |
| | 12291 | Chikballapur | Chikballapur | Chinthamani | KN-30-20 | Improvements to Road - MRL06-MDR Near Borgamakalahalli To Mylapura Via Bommekallu to 5.5 | 5.50 | 5.50 | | 17-07-2020 | 01-06-2021 | 319 | 17 |
| | 12290 | Chikballapur | Chikballapur | Chinthamani | KN-30-20 | Improvements to Road - MRL14-Kachihalli to Vishwanathapura via Chikkapura Anur to 8.5 | 8.50 | 8.50 | | 17-07-2020 | 01-06-2021 | 319 | 27 |
| | 12292 | Chikballapur | Chikballapur | Chinthamani | KN-30-21 | Improvements to Road - MRL13-Chinnasandra To BC Road Via Nayindrahalli Colony to 14.54 | 14.54 | 14.54 | | 24-07-2020 | 18-12-2021 | 512 | 28 |
| | 12299 | Chikballapur | Chikballapur | Sidlaghatta | KN-30-22 | Improvements to Road - MRL05-Ganjikunte SH to Pollakuntahalli (MDR) via Doddabadragatta, Chikkabandragatta, Hakkipikki Calony, Poolakuntla halli. to 6 | 6.00 | 6.00 | | 14-08-2020 | 01-06-2022 | 656 | 9 |
| | 12298 | Chikballapur | Chikballapur | Sidlaghatta | KN-30-22 | Improvements to Road - MRL01- Taluk border (Ibasapura) to KG Road via Sugaturu, Jangamakote, J.Kurabarahalli to 5.5 | 5.50 | 5.50 | | 14-08-2020 | 18-12-2021 | 491 | 11 |
| | 12300 | Chikballapur | Chikballapur | Sidlaghatta | KN-30-23 | Improvements to Road - MRL08-Korlaparthi to T.Venkatapura via Kommasandra, Kariyappanahalli to 12 | 12.00 | 12.00 | | 14-08-2020 | 12-07-2021 | 332 | 36 |